Professional Documents
Culture Documents
SITE QA/QC
1 Documentation
Relevant permits and licenses shall be Granted
1.1 Permits to work QCS Section 1 Clause 19.1.3 submittal
acquired
Prior to commencing the works
permits/licenses
H W HSE/QC Engineer
Volume 4 Clause 12.3 & 12.13 Check the status of shop drawing prepared by
1.4 Design documents and DVE Design Verification submittal Prior to commencing the works SONO H W Station Manager / Site Engineer
Volume 3 Clause 5.1.2 subcontractors to be “Issued for Construction"
SITE QA/QC
3 Receiving of Delivery & Storing of Materials
Material Submittal & Method
3.1 Checking of Manufacturers Label and marking. inspection Manufacturer's Certificate Every Delivery Material inspection H W Site Engineer/QC Engineer
Statement Clause 5.3
Request
No damage and compliance with
specifications at time of delivery, otherwise
Method Statement Clause 5.3
3.2 Storage area of Fixtures. inspection replaced Once Material inspection W W Site Engineer/QC Engineer
QCS Section 5 Clause 14.1.6
Handled and stored as recommended by the Request
manufacturer
4 Light Fixture Installation Activity
Approved Shop Drawings.
As per Approved Shop Drawing and project
4.1 Layout Marking Specifications, Approved Method inspection Prior to commencing the works Written approval H W Site Engineer / QC Engineer
specifcations
Statements
Approved Specifications, Approved
4.2 Final Circuit Wiring Test inspection successfully conduted continuity test Before Installation DB IRE-Test Report H W Site Engineer / QC Engineer
Method Statements
Approved Shop Drawings.
As per Approved Shop Drawing and project
4.3 Installation of Distribution Board Specifications, Approved Method inspection After installation IRE- Check List H W Site Engineer / QC Engineer
specifcations
Statements
MS: method statement - Volume xx: refers to Contract No.:RTC/082/2013 ( DESIGN & BUILD , GREEN LINE Elevated & At Grade) - QCS: Qatar Construction Specifications 2014