Method Statement
Name:
Signature:
Date:
Method Statement
Testing and Commissioning Fire Alarm System
Technical Department
Planning and Development Section
Method Statement: Testing and commissioning of Fire Alarm System
Revision: 00
Date:
Document Control
Document Information
Information
Document ID BEC-KAP5
Document Owner Beijing Emirates International Construction Co.
Issue Date
Last Saved Date
Method Statement: Testing and commissioning of Fire Alarm
File Name
System
Document History
Version Issue Date Changes
Document Approvals
Project Sponsor
M.O.I
Project Director
HSE Manager
IT Manager
Method Statement
Testing and Commissioning of Fire Alarm System
Table of Contents
1- SCOPE OF WORK....................................................................... 6
2- REFERENCES........................................................................... 6
3- DEFINITIONS........................................................................... 6
4- PRODUCT/ MATERIAL………………………………....................... 7
5- WORKFORCE…………………………………….......................... 7
6- PRIOR ACTIVITIES TO BE COMPLETED ………................................... 8
7- QUALITY ASSURANCE/ CONTROL.................................................... 8
1. SCOPE OF WORK
This Method Statement covers the nature and type of work for the testing and
commissioning of Fire Alarm System by Nesma to King Abdullah Project (KAP5).
This method statement gives guidelines contained herein so as to ensure that the job
execution complies with the requirement of the specifications and the authorities
concerned and serves the intended purpose to satisfactory level.
This procedure is to be read in conjunction with the relevant ITP, outlining the
responsibilities and the quality verification to be performed by various parties.
2. REFERENCES
Contractor’s Quality Control Plan Set for Contract
Project Specification
Approved Drawings
3. DEFINITIONS
4. PRODUCT/MATERIAL:
Smoke Detectors
Heat Detectors
Break Glass Unit
Control Module
Monitor Module
Sound Horns
Flashers
Main Fire Alarm Control Panel & Repeater Panel
5. WORKFORCE:
Construction team will ensure that manpower selected for the specified job is
well trained. Tool box talk shall be carried out before the work commences at
site to the involved workers through the supervisor and foremen in charge the
work, under the directives of in-charge engineer. The work procedure and
safety precautions should be clearly and concisely explained to the workers
in their own language so it is fully understood.
Prior to start the installation, refer to the approved design/ shop drawings related to,
the area of installations and ensure the required materials are available at site as
per approved material submittals. Any discrepancies, damage etc., found will be
notified and reported for further action.
Ensure that the work area is ready and safe to start the installation of Fire Alarm
System.
Obtain the approved design/shop drawings with the latest revision in preparation of
carrying out the works.
Ensure that the installations of Fire Alarm is carried out in accordance with
manufacturer’s installation recommendations, requirements of applicable standards
and in accordance with the recognized institutions and specified in project
specifications to ensure that the installation complies with the requirements.
7. QUALITY ASSURANCE/CONTROL
The QC Inspector has the full-time surveillance during the activities to ensure that all
works has done as per this method statement. Any found deficiency shall be
immediately corrected based on the procedure and specification workmanship
requirements. To check all necessary documents are prepared and approved by
Engineer.
Work shall be carried out by the site staff under strict supervision and guidance of
the concerned Supervisors/Foremen/ Engineers.
Site Engineer along with QA/QC inspector is responsible for all activities for getting
the work inspected/approved by consultant.
Fix the fire alarm devices and evacuation speakers and devices in the designation
areas as per the approved shop drawings.
Program the whole devices as per the addresses with location for the designated
areas.
Install and connect all monitor and control modules for the fire related equipment
and program the same with fire interlock.
Fire alarm connection to elevator recall system, components, HVAC dampers, and
equipment, Fire Pump control panel and BMS etc.
Check the devices randomly in all floors by creating the alarm for the proper
functionality.
After the above steps are followed put system in normal operation.
The above process will be executed by the approved fire alarm supplier.
Check the system is detecting by the fire alarm panel and that all messages appear
on the monitor.
Consider system to be tested as per the approved cause and effect matrix.
Inspection:
After completion of the installation, the same shall be raised for inspection.
9. ATTACHMENT:
9.1 Inspection and Test Plan (ITP)