: KAP2E2-MS-ELEC-GEN-2448-00
r, a
Method Statement
Installation & Termination of Fire
alarm System
Reviewed By Reviewed By Reviewed By Approved By
QA/QC Manager HSE Manager Project Manager Project Director
Signature:
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
1
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Method Statement
Installation & Termination of Fire Alarm System
Technical Department
Planning and Development Section
Method Statement: Installation & Termination of Fire Alarm System
Revision: 01
Date: 23 Feb 2017
Document Control
Document Information
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
2
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Information
Document ID BEC-KAP2E2
Document Owner Beijing Emirates International Construction Co.
Issue Date 30 March 2015
Last Saved Date 20 Feb 2017
Method Statement: Installation & Termination of Fire Alarm
File Name
System
Document History
Version Issue Date Changes
[01] 23 Feb 2017 Submitted to NKY for approval
Document Approvals
Project Sponsor
M.O.I
Ahmed AbouElGhar
Project Director
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
3
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Method Statement
Table of Contents
1- SCOPE OF WORK ....................................................................... 6
2- REFERENCES ........................................................................... 6
3- DEFINITIONS ........................................................................... 6
4- RESPONSIBILITY………...............…………………..................... 7 - 9
5- SPECIALIZED TOOLING EQUIPMENT…………………........................ 9
6- PRODUCT/ MATERIAL………………………………....................... 9
7- WORKFORCE…………………………………….......................... 9
8- PRIOR ACTIVITIES TO BE COMPLETED ………................................... 10
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
4
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
1. SCOPE OF WORK
This Method Statement covers the nature and type of work for the Installation and
Termination of Fire Alarm System by BEC-MEP to King Abdullah Project (KAP2E2).
This method statement gives guidelines contained herein so as to ensure that the
job execution complies with the requirement of the specifications and the authorities
concerned and serves the intended purpose to satisfactory level.
This procedure is to be read in conjunction with the relevant ITP, outlining the
responsibilities and the quality verification to be performed by various parties.
2. REFERENCES
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
5
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Approved Drawings
3. DEFINITIONS
MOI: Ministry of Interior (Client)
NKY: NKY Architect and Engineers (Engineer)
BEC: Beijing Emirates Construction (Main Contractor)
QA/QC: Quality Assurance & Quality Control
ITP: Inspection and Test Plan
RFI: Request For Information
IR: Inspection Request
4. RESPONSIBILITIES
Project Manager
The project manager will have full authority and overall responsibility to manage,
supervise.
He will control the works and will have direct responsibility for ensuring safe working
practices and compliance with regulatory authority’s requirement.
He will coordinate with the engineers and the employer’s representative for execution
of the contract scope of works.
Implement the project quality systems to the satisfaction of the project requirements.
Review changes and variations to evaluate impact of those on time and schedule.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
6
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Project Engineer
Is responsible for ensuring that all works are carried out as per the
specifications, approved shop drawings and method statement as per
manufacturer’s instructions and coordinated with other works.
Is responsible for monitoring the works are in fulfillment with the specified
requirements that all quality records related to the works are complete. He will carry
out all the inspections with the employer representative and notice will be given to
employer within 24 hours and ensure that no work will be executed/covered up
without inspection/testing.
Site Engineer
The site engineer shall coordinate all the site activities according to work
schedule, installation according to the project specifications, manufacturer’s data
sheet and approved shop drawings.
Shall liaise with site representatives and coordinate safety procedures with
site supervisors and site foremen.
Shall coordinate and explain the work to be carried out to the supervisors/
Site Foreman.
Ensure the compliance of work with related approved quality control and
coordinate with BEC QA/QC Engineer/Inspector to advice for the areas to be issued
for internal external inspection.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
7
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
The project team of experienced supervisors and foremen shall ensure the
quality of the installation work carried out, and shall also ensure that it is as per the
latest approved construction shop drawing issued for installation and according to
instructions received from the site engineer.
He will provide his subordinates adequate information to carry out their duties.
To ensure that he has adequate resources of machinery, labor, and materials to
carry out all the activities efficiently and to discuss with the site engineer.
Review the documents of approved material submittal and verify the items
with the packing list for any shortage or description from approved.
Verify all documents are forwarded with the item as per the requirement of
purchase order.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
8
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
5. SPECIALIZED TOOLING/EQUIPMENT
Screw Drivers
Electrician Pliers
Measuring tape
Ladders/ Scaffolds
Marker
Multi-meter
Label Printer
Insulation Tape
6. PRODUCT/MATERIAL:
Smoke Detectors
Heat Detectors
Break Glass Unit
Control Module
Monitor Module
Sound Horns
Flashers
Main Fire Alarm Control Panel & Repeater Panel
7. WORKFORCE:
Construction team will ensure that manpower selected for the specified job is
well trained. Tool box talk shall be carried out before the work commences at site to
the involved workers through the supervisor and foremen in charge the work, under
the directives of in-charge engineer. The work procedure and safety precautions
should be clearly and concisely explained to the workers in their own language so it
is fully understood.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
9
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Prior to start the installation, refer to the approved design/ shop drawings
related to, the area of installations and ensure the required materials are available at
site as per approved material submittals. Any discrepancies, damage etc., found will
be notified and reported for further action.
Work shall be carried out by the site staff under strict supervision and
guidance of the concerned Supervisors/ Foremen/ Engineers.
Ensure that the work area is ready and safe to start the installation of Fire
Alarm Systems.
Ensure that the installations of Fire Alarm is carried out in accordance with
manufacturer’s installation recommendations, requirements of applicable standards
and in accordance with the recognized institutions and specified in project
specifications to ensure that the installation complies with the requirements
All staff will have a safety induction carried out by the contractor before
commencing any activities on site.
Prior to commencing any activity, labour force shall receive a tool box talk on
the project site safety regulations from the contractor safety officer on a weekly basis
on topics appropriate to the activities being undertaken.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
10
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Any process that is adopted that may have particular safety risk will be
assessed and addressed as required.
Ensure all concerned personnel shall use PPE and all other items as required
and full specifications of equipment to be used.
Ensure adequate lighting and adequate space is provided in the working area
at night time.
Ensure that in all areas where there is a risk of falling from height preventative
measures will be taken and identify them.
Ensure service shaft opening are provided with barricade, tape, safety nets.
All BEC-MEP tradesmen, operators etc. are qualified and will have licenses
and their competency level issued by BEC.
Access/ Egress: BEC will provide scaffoldings assembly with attached step ladder
and rubberize wheel. Platforms will be provided on top of the scaffolding assembly
and circulated with tubular railings at adequate height to protect the workers.
Aluminum step ladders will be used in instances where scaffolding is not permitted
in the workplace and for alignment purposes of installation. Safety personnel should
be involved in preparation and approval scaffolding assembly and ladders prior to
use.
Housekeeping: The supervisor has the responsibility to ensure the site is kept
clean from any debris. Any material leftovers shall be collected and put into
designated disposal box. Unused materials shall be returned to proper storage in
every end of each day work.
10. ENVIRONMENT:
The QC Inspector has the full-time surveillance during the activities to ensure
that all works has done as per this method statement. Any found deficiency shall be
immediately corrected based on the procedure and specification workmanship
requirements. To check all necessary documents are prepared and approved by
Engineer.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
12
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Work shall be carried out by the site staff under strict supervision and
guidance of the concerned Supervisors/Foremen/ Engineers.
Site Engineer along with QA/QC inspector is responsible for all installation
activities for getting the work inspected/approved by consultant.
Fix the fire alarm devices and evacuation speakers and devices in the
designation areas as per the approved shop drawings.
Program the whole devices as per the addresses with location for the
designated areas.
Install and connect all monitor and control modules for the fire related
equipment and program the same with fire interlock.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
13
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
Check the devices randomly in all floors by creating the alarm for the proper
functionality.
After the above steps are followed put system in normal operation.
The above process will be executed by the approved fire alarm supplier.
Check the system is detecting by the fire alarm panel and that all messages
appear on the monitor.
Consider system to be tested as per the approved cause and effect matrix.
Inspection:
After completion of the installation, the same shall be raised for inspection.
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
14
Contract No.: 134/15/53/1 Doc. No.: KAP2E2-MS-ELEC-GEN-2448-00
13. ATTACHMENT:
13.1 Safety Risk Assessment
MS: Installation & Termination of Fire Alarm System- KAP2E2-MS-ELEC-GEN-2448-00 February 2017
15