Item Load
Fire Pump SFFECO Duty Pump 36.4 hp (47.1hp @ 858 US GPM)
Efficiency 80.5
(41.3 hp @ 819 US GPM)
Jockey Pump 5.5 hp (4kw - 5.5kw)
Fire Pump Fire End Fire Pump 30kw
Fire Pump NAFCO Fire Pump 45kw
AC Computer Lab
DB AC2 Final Drawing DB AC 3 Final Drawing
Type Quantity Watt Ckt No Load Location
1 AC Class 16
1 x 2 AC corridor
1 x 3
1 x 4 AC corridor
1 x 5 AC corridor
1 x 6 AC Class 3
7 AC Class 18
1 x 8 AC Class 8
1 x 9 AC Class 5
10 AC corridor
1 x 11 AC Class 10
1 x 12 AC Class 14
1 x 13 AC Lab 2
1 x 14
1 x 15 AC corridor
1 x 16
1 x 17 AC Class 24
1 x 18 AC Class 4
1 x 19
1 x 20 AC corridor
1 x 21 AC Lab 1
1 x 22 AC Lab 1
1 x 23 AC Prep
1 x 24
1 x 25 AC Teacher Room
1 x 26 AC Library
1 x 27 AC Class 5
1 x 28 AC Electrical Room
1 x 29 AC Library
1 x 30
1 x 31
1 x 32 AC Manager Assst
33 AC Class 30
34 AC Manager
35 AC Class 20
36
37 AC Class 19
38 AC Lab 2
39 AC corridor
40
41
42
1 x 43
44
1 x 45
46
1 x 47
48
1 x
AC 3 Final Drawing DB Canteen Final Drawing
Type Quantity Watt Ckt No Load Location Type Quantity
1 x 1
1 x 2
3
1 x 4
1 x 5
1 x 6
1 x 7
1 x 8
1 x 9
1 x 10
1 x 11
1 x 12
1 x 13
14
1 x 15
16
1 x 17
1 x 18
19
1 x 20
1 x 21
1 x 22
1 x 23
24
1 x 25
1 x 26
1 x 27
1 x 28
1 x 29
30
31
1 x 32
1 x 33
1 x 34
1 x 35
36
1 x 37
1 x 38
1 x 39
40
41
42
43
44
45
46
47
48
ng DB Guard room Final Drawing
Watt Ckt No Load Location Type Quantity Watt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
DB Sec room Final Drawing
Ckt No Load Location Type Quantity Watt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
LPPG-01
Ckt No Load Location Type Quantity
Light Class 3, 4, 5 A1
1
Light E. Exit Door F14
2 Light Manager, Mngr Ass, Toilet, lib A1
3 Light class 10, 11 A1
4 Light Ele. Room, HR, Computer Lab A6
5 Light Class 6, 7, 8 A1
6 Light Teacher Room A1
7 Light Lab 1, 2, Prep A1
8 Light Class 9 A1
9 Light Corridor EXIT
10 Light Courtyard F8
11 Light Corridor EXIT
A2E
Light Washroom 3
Light Washroom 3 A3
12
Light Washroom 3 A3E
Light Washroom 3 A4
13 Light Courtyard F8
Light Class 12, 13, 14 A1
14
E. Exit Door F14
15
16
17
Socket Class 21, 22 Single
18
Duplex
Socket Class 13,14 Single
19
Duplex
Socket Class 23,24 Single
20
Duplex
21 water heater washroom 3
22 Air cutain Main Entrance
Socket Corridor Single
23
Duplex
Socket Class 7,8 Single
24
Duplex
25 water heater Lab 1
26 Socket Hr,Elec Room Duplex
27 Socket Computer Lab Floor Box
28
29 Air cutain Exit
30
31 Exhaust Fan Washroom 2
32
33 Hand dryer Washroom 3
Socket Class 11,12 Single
34
Duplex
35 Socket Court Yard Single
36 Hand dryer Washroom 1
Socket Manager,Manager Ass,Library Single
37
Duplex
Socket Class 23,24 Single
38
Duplex
39 Exhaust Fan Washroom 3
40
Socket Open Court Single
41
Duplex
42 Exhaust Fan Washroom 1
43 Socket Open Court Single
44 water heater washroom 1
45 Water Heater Washroom 2
46
47 Hand Dryer washroom 2
socket Class 17, 18 Single
48
Duplex
44
Socket class 15,16
45
AC
DB AC2 Final Drawing DB AC 3 Final Drawin
Location Type Quantity Watt Ckt No Load
1 AC
corridor 1 x 2 AC
Class 4 1 x 3
Class 20 1 x 4 AC
Class 6 1 x 5 AC
Class 18 1 x 6 AC
7 AC
Class 25 1 x 8 AC
Class 2 1 x 9 AC
10 AC
corridor 1 x 11 AC
Class 16 1 x 12 AC
corridor 1 x 13 AC
corridor 1 x 14
Class 12 1 x 15 AC
Class 11 1 x 16
Class 30 1 x 17 AC
Class 27 1 x 18 AC
Class 2 1 x 19
Teacher Room 1 x 20 AC
corridor 1 x 21 AC
Class 28 1 x 22 AC
Class 1 1 x 23 AC
Class 09 1 x 24
Entrance 1 x 25 AC
Class 11 1 x 26 AC
Computer Lab 1 x 27 AC
Teacher Room 1 x 28 AC
HR 1 x 29 AC
Computer Lab 1 x 30
Class 15 1 x 31
Class 29 1 x 32 AC
33 AC
34 AC
35 AC
36
37 AC
38 AC
39 AC
40
41
42
Roof 1 x 43
44
Roof 1 x 45
46
Roof 1 x 47
48
Computer Lab 1 x
DB AC 3 Final Drawing DB Canteen Final Drawing
Location Type Quantity Watt Ckt No Load Location
Class 16 1 x 1
corridor 1 x 2
3
corridor 1 x 4
corridor 1 x 5
Class 3 1 x 6
Class 18 1 x 7
Class 8 1 x 8
Class 5 1 x 9
corridor 1 x 10
Class 10 1 x 11
Class 14 1 x 12
Lab 2 1 x 13
14
corridor 1 x 15
16
Class 24 1 x 17
Class 4 1 x 18
19
corridor 1 x 20
Lab 1 1 x 21
Lab 1 1 x 22
Prep 1 x 23
24
Teacher Room 1 x 25
Library 1 x 26
Class 5 1 x 27
Electrical Room 1 x 28
Library 1 x 29
30
31
Manager Assst 1 x 32
Class 30 1 x 33
Manager 1 x 34
Class 20 1 x 35
36
Class 19 1 x 37
Lab 2 1 x 38
corridor 1 x 39
40
41
42
43
44
45
46
47
48
B Canteen Final Drawing DB Guard room Final Drawing
Type Quantity Watt Ckt No Load Location Type Quantity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
wing DB Sec room Final Drawing
Watt Ckt No Load Location Type Quantity Watt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
N39
DATA RACK 42U-02 Final Drawing
Patch Panel No Load Location
1 HDMI, USB & Data Class 10
1 HDMI, USB & Data Class 11
1 HDMI, USB & Data Class 12
1 HDMI, USB & Data Class 13
1 HDMI, USB & Data Class 14
1 HDMI, USB & Data Class 15
1 HDMI, USB & Data Class 16
1 HDMI, USB & Data Class 17
1 HDMI, USB & Data Class 18
1 HDMI, USB & Data Class 19
1 HDMI, USB & Data Class 20
1 HDMI, USB & Data Class 30
2 HDMI, USB & Data Class 21
2 HDMI, USB & Data Class 22
2 HDMI, USB & Data Class 23
2 HDMI, USB & Data Class 1
2 HDMI, USB & Data Class 2
2 HDMI, USB & Data Class 3
2 HDMI, USB & Data Class 4
2 HDMI, USB & Data Class 5
2 HDMI, USB & Data Class 6
2 HDMI, USB & Data Class 7
2 HDMI, USB & Data Class 8
2 Data Lab 1
3 HDMI, USB & Data Class 9
3 Data Computer Lab
3 Data Teacher Room
3 Data Entrance Lobby
3 Data Lab 2
3 Data Prep
3 Data Lab 1
4 Data Manager Asst
4 Data Elec Room
4 Data HR Dept
4 Data Computer Lab
5 Data Library
5 Data Open Court
5 Data Manager office
5 Data Class 27
5 Data Class 28
5 Data Class 29
5 WIFI Corridor Class 7
5 WIFI Corridor Teacher Room
6 WIFI Corridor Class room 3
6 WIFI Corridor Class room 9
6 WIFI Corridor Class room 27
N39
ATA RACK 42U-02 Final Drawing TELEP
Port No Quantity Patch Panel No
GF-D-03,04 2 1
GF-D-05,06 2 1
GF-D-07,08 2 1
GF-D-09,10 2 1
GF-D-11,12 2 1
GF-D-13,14 2 1
GF-D-15,16 2 1
GF-D-17,18 2 1
GF-D-19,20 2 1
GF-D-21,22 2 2
GF-D-23,24 2 2
GF-D-01,02 2
GF-D-25,26 2
GF-D-27,28 2
GF-D-29,30 2
GF-D-31,32 2
GF-D-33,34 2
GF-D-35,36 2
GF-D-37,38 2
GF-D-39,40 2
GF-D-41,42 2
GF-D-43,44 2
GF-D-45,46 2
GF-D-47 48 2
GF-D-69,70 2
GF-D-71,72 2
GF-D-62,63,64,65,66,67 6
GF-D-61 1
GF-D-52,53,54,55,56,57,58,59 8
GF-D-51,52 2
GF-D-49,50 2
GF-D-94,96 2
GF-D-93,94 2
GF-D-90,91,92 3
GF-D-73,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89 17
GF-D-99,100,101,102 4
GF-D-103,104,105,106 4
GF-D-97,98 2
GF-D-113,114 2
GF-D-115,116 2
GF-D-117,118 2
GF-D-119 1
GF-D-120 1
GF-D-121 1
GF-D-122 1
GF-D-123 1
116
Site 3
119
N39
TELEPHONE RACK 12U-02 Final Drawing
Load Location Port No Quantity
Telephone Manager office GF-T-24 1
Telephone Manager Asst GF-T-22,23 2
Telephone Elec Room GF-T-21 1
Telephone HR Dept GF-T-20 1
Telephone Computer Lab GF-T-19 1
Telephone Teacher Room GF-T-11,12,13,14,15,16,18 7
Telephone Lab 2 GF-T-7,8,9,10 4
Telephone Prep GF-T-5,6 2
Telephone Lab1 GF-T-1,2,3,4,17 5
Telephone Library GF-T-25,26,27 3
Telephone Open court GF-T-28,29 2
Item Description Unit School Total
Nos
CCTV Camera
11 11 11 11 44
44
Nos 1 1 1 1 4
NVR 1 1 1 1 8
Nos 1 1 1 1 4
Screen 1 1 1 1 4
Nos 1 1 1 1 4
Work station 1 1 1 1 4
cable Rolls 3 3 3 3 12
Total Price
for 4
Item Description Unit Price Schools Item
Network WDR 4MP IR Bullet Camera, 1/3.0"
CMOS, 3.6mm Motorized, 1IR LEDs, PoE, IP66,
CCTV Camera H.265/H.264/Smart Codec,Smart
(HBW4PER1V) tripwire and face detection analytics
Installation &
3000 12000 Configuration
Total Total
Price for 4 Price for 4
Description Unit Price Schools Item Description Unit Price Schools
HIKVISION NVR 16
NVR Dahua 16ch CHANNEL NON POE
2bay POE 1800 7200 NVR BUSINESS /4HDD 950 3800
WD HDD Purple 8TB 950 7600 Hard Disk (4 Nos) WD HARD DRIVE 8TB 745 2980
HIKVISION POE SWITCH
16P BUSINESS
POE Switch 825 3300
SHARP SMART TV FULL
LED Screen 40 Inch 850 3400 Screen HD 42" 1250 5000
cable pulling,
installation,
Per point 150 6600 configuration 350 15400
3M CAT6A UTP
CAT6A Cable NETWORK CABLE ROLL
Beldin Cat6 Cable 30 550 6600 1150 15400
HDMI 30m high qualit 350 1400
Cable pulling 300 13200 Done Done
5 480 5 480
35 4900 35 4900
100080 65340
Al Alameya Diamond Control Future Estab High System
Honeywell Dahua Hikvision
Total Price
for 4
Schools
60632
5500
9768
11432
0
0
0
632
2288
6496
22860
0
45716
0
26643.76
11320
0
0
0
0
203287.76
Quantity
Total
S.No Item Unit for 4 Price
Price
Schools
1 CCTV Camera Nos 44 600 26400
2 Back Box for Camera Nos 44 125 5500
3 NVR Nos 4 1600 6400
4 Hard Disk for NVR Nos 8 1400 11200
5 PoE switch Nos 4 2425 9700
6 Switch 8 Port Nos 16 1294 20704
7 Patch Panel Nos 4 170 680
8 Patch cord nos 94 45 4230
9 RJ-45 Module Nos 94 35 3290
10 Cable Mangement Nos 4 80 320
11 Screen Nos 4 2500 10000
12 Bracket for Screen Nos 4 150 600
13 HDMI Cable 30m Nos 4 500 2000
14 PVC Conduit Pcs 24 5 120
15 EMT Conduit Pcs 35 22 770
16 CAT6A Cable (305m) Roll 12 1450 17400
17 Cable Pulling Point 44 300 13200
18 Cable Testing & Labelling Point 44 200 8800
19 System Install & Config Point 44 600 26400
Total without VAT 167714
S.No System Location
1 CCTV General
2 CCTV General
3 CCTV Guard Room
4 CCTV Car Gate
5 CCTV Pump room
6 CCTV main building
7 LC main building
8 Lighting boundary wall
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Task Comment
Receive Quotations
Quotation ki tabdili and sending to Ameen
conduit & location for camera
conduit & location for camera before civil work
conduit & location for camera before plaster
location and conduiting for cameras at 7 points
checking the conduits if enough for all the cables
exposed conduit on wall between canteen & Guardroom