Under Ground cables Work Schedule

1. Showing the actual drilling 2.5 m so are cut 2.60 m in the asphalt

2. Drilling depth of 1.4 m to 1.6 m

3. Fossil JDC be long 18:00 and 15:00 display so that the JDC set out along the chamber be 17:00
Display 2.5 m and be Aditha bed of concrete

4. We work trial holes (hole prototype) and to explore the existing water services - Contacts -
Electricity

5. Sand brushes under the cables after drilling and clouds before sand bedding from 10 cm to 17 cm

6. Sand brushes over the cables after the drawing is from 10 to 15 cm

7. the total height of the sand in the excavation of 30 to 40 cm

8. tiles have Balata rate of 2.5 per 1 meter cables and have three slabs offer a red and green slab of
Viper

9. is placed 10 cm above the sand tiles

10. The brushes clasped Green steel wire mesh two laps View lap of 1 m

Where are their beds side-by-side along the fossil

11. Reclamation is a given layer thickness mode so that after placing reclamation remaining 30 cm
before u asphalt

12. The warning tape put

13. Keep the Reclamation final layer up to the asphalt before u b 8 cm

14. asphalt is put on twice or two layers so that the wait after the first class if comforting happened in
the asphalt are processed in Altanih class

15. Mnhol Alpaor is placed in any side next to JDC so cozy rooms by Aktar of 22:00 and Almnhol so
that it is equal to the asphalt surface of the lid and is placed the (linkbox) as follows

BC put all Skhn

DC put all Skhanin so that each at least two BC put one DC

ES is placed in the station

LS placed in Gantre Gantre in the case was close to the station means Iksen just one, but if it was far
from the station Gantre put CURRENT TRANSFORMER
16. After the work we are doing the JDC EARTHING so we put valuable copper in the four corners of
the Joint Distribution Committee and Nouselhm each by Bear Cooper 240 and pull them through the
cable to the following link Crosbondenj Buckeyes are withdrawn with Albonding cable outside of the
Joint Distribution Committee and is Albonding cable installation, Alcrosbondenj cable inside the Surat
Corregat Pipe Joint Distribution Committee from first to reach following link Buckeyes and to protect
the cable Albonding

17. Mnhol fiber is placed on the side of fossil cables and not above cables and Mnhol fiber is placed
every 300 or 400 meters as standard on and in every corner in the cable path is Mnhol Viper put
Withdrawal is the SUBDUCT preferably withdrawn after the sand or tile so that it is processing any
problem in the clouds before placing reclamation and asphalt and a number 4 so that it is pulling fiber
in one and two of them remain a reserve for the future and be the beginning of casting Dakt and its
end is Mnhol fiber and after he was pulled the wire located linking originally casting Dakt are tied up
with rope and the shadow of an existing cord while pulling cable fiber so that it is withdrawing casting
Dakt Pfurk Lift or Bshiwal four with some and then linking them with a well some of them either
Alaepr are withdrawn manually to avoid Thtkh and take into account the withdrawal of fiber that
there will be LOOP length from 10 to 15 m Ahtaiti of cable fiber is placed on Brackett inside Mnhol
Alpaor and that maintenance receptor and these LOOP Ctaath of cable fiber is coated with too
Corregat Pipe and so as to protect water from rain that falls later in Mnhol fiber and are Mnhol
Mozilla mode so that not Almnhol cover also equal to the surface of the asphalt preferably Almnhol
situation after the withdrawal of casting Dakt