You are on page 1of 3

DATE OF OBSERVATION:

RISK LEVEL LOW MEDIUM HIGH 1/6/2022 Access and Egress

HIGH Confined Space


Electrical Safety
Emergency Preparedness

TYPE OF OBSERVATION: UNSAFE ACT


CONCERN DISCIPLINE CIVIL Fire Prevention
Hand Tools

OBSERVED COMPANY CONTRACTOR /


Dr. CONCRETE
SUBCONTRACTOR

OBSERVATION It was observed that scaffold is being erected by


uncertified persons who assgined as helper for the Housekeeping
project

OCCUPATIONAL HEALTH & SAFETY


Hygiene / Welfare

Lifting Operations
IMMEDIATE ACTIONS TAKEN BY The PH was informed and Issue was communicated
OBSERVER with HSE Bahaa. Manual Handling

Material / Equipment Trans

Office Safety

Permit to Work
RECOMMENDATIONS / SUGGESTIONS TO It is not allowed for helpers to work on higher levels.
IMPROVE HSE Only certified scaffolders can involve into the erection Personel Protective Equipm
activities. DR. CONCRETE will re-submit manpower list
along with updated certifications. Pressure Testing / Blowing

Procedures / Instructions /

Radiography

REPORTED BY / COMPANY / POSITION: Mohammed Khalid Road Safety / Traffic Mana

HAZARD CLASSIFICATION: Scaffolding / Work Platforms Scaffolding / Work Platform

AREA: CAPCON BEFORE AFTER Signs and Barriers

LOCATION: CAPCON OFFICE Slips, Trips, Falls

PH / PRA: Jabbar Abd / Fatih Aribas STATUS: CLOSE DATE OF CLOSURE: 1/7/2022
Working at Heights
Work Place Conditions (Du

Biodiversity (Flora/Fauna)

ENVIRONMENT
Emissions (Air, Dust, Noise
Land Disturbance
Investigation Level for
Consequence
Potential Consequence

Harm to Environment Damage to Impact on


Incident Severity
People Effect Assets Reputation
Very unlikely Unlikely Possible

Slight injury or
Slight impact
Health effects
Slight damage.
Negligible Some public
Negligible (First Aid) No disruption to
Effect awareness
operation

Minor injury or
Local environmental Minor damage
Health effects Limited Impact
damage. Within the Brief disruption
Low (Medical Treatment Some public
fence and within (cost10K€-100K€,
of Work Restricted concern
systems 1day downtime)
Case)

Major injury or Contamination Local damage


Health effects Considerable Impact
Damage sufficient to Partial shutdown
Medium Regional public
attack the (cost 100k€-500k€),
concern
environment. 1-7 days shutdown
(Lost Time Injury)

Major damage
Limited loss of
Single fatality or Partial operation
discharges of known
High Permanent Total loss( cost 500k€- National impact
toxicity. Affecting
Disability 3M€) 2weeks
neighbourhood.
shutdown

Extensive damage
Major environmental
Substantial or total
damage. Extended
operation loss (cost
Major Multiple fatalities measures to restore International impact
3M€-10M€), more
the contaminated
than 2weeks
environment.
shutdown

LOW MEDIUM HIGH


Investigation Level for

Potential Consequence

Likely Very Likely