You are on page 1of 1

NBC FORM NO.

E - 12 Republic of the Philippines


City/Municipality of _____________________
Certificate of Operation: Province of __________________________________

Generators / UPS OFFICE OF THE BUILDING OFFICIAL

Name of Owner/Lessee

Certificate of Operation:
Generators / UPS
Located at/along

A certificate was submitted by _________________________________________ a duly


(Name) No.
licensed (): ( ) professional electrical engineer/ ( ) registered electrical engineer/ ( ) registered Fee Paid
Official Receipt No.
master electrician hired by the owner who undertook the electrical inspection and that the
Date Paid
installation is in order.
PRC License No.__________, Issued____________ with validity_____________ Date Issued

Date
This Certificate of Operation: Generators / UPS is issued/granted pursuant to pertinent provision of the latest
Date
Verified as to the following Philippine Electrical Code, the National building Code and its Implementing rules and Regulations.
kVA / Watts___________________________________________________________
Description/Manufacturer __________________________________________
Incoming / Outgoing Voltage ________________________________________ Name of Owner/Lessee_____________________________________________________________________
No. of Phases _________________________________________________________ Located at/along __________________________________________________________________________
Size / No. of Incoming Cables ________________________________________ kVA / Watts_________________________________________________________________________________
No. & Size of Incoming Cables ________________________________________ Description/Manufacturer________________________________________________________________
No. & Size of Outgoing Cables________________________________________ Incoming / Outgoing Voltage______________________________________________________________
No. & Size of Grounding Wires________________________________________ No. of Phases_______________________________________________________________________________
Verified on ____________________________________________________________ Size / No. of Incoming Cables______________________________________________________________
Expires on_____________________________________________________________ No. & Size of Incoming Cables______________________________________________________________
Inspection Fee Paid ___________________________________________________ No. & Size of Outgoing cables _____________________________________________________________
Official Receipt No .__________________________________________________ No. & Size of Grounding Wires _____________________________________________________________
Date Issued ___________________________________________________________
The owner/lessee shall properly maintain the electrical equipment/machinery to ensure its safe operation.
The above described electrical installation covered by electrical Permit No change, addition or upgrading/alteration deviating from the original electrical plans shall be made without appropriate
No.________________________ issued on _________________has been found substantially permit.
satisfactory complied, therefore the “Certificate of Operation: Generators / UPS” is hereby The aforementioned Generators / UPS may now be operated for a period of one (1) year from the date of inspection.
recommended for issuance. The owner/lessee of the building/structure shall notify in writing the office of the building official for the granting/issuance
of a Certificate of Operation: Generators / UPS for a period of one (1) year from the date of issuance of this certificate and
yearly thereafter.
A certified copy hereof shall be posted within the premises of the building and shall not be removed without authority from
Electrical Inspector Chief, Electrical Section the building official.
(Signature Over Printed Name) (Signature Over Printed Name)
Date______________________ Date______________________

_________________ _________________ _________________ _________________


PRC REG. NO. VALIDITY PRC REG. NO. VALIDITY

BUILDING OFFICIAL
Chief, Chief, (Signature Over Printed Name)
Inspection and Enforcement Division Processing and Evaluation Division Date______________________
(Signature Over Printed name) (Signature Over Printed Name)
Date_____________________ Date______________________