X Information Request for work
1 Subject : Request for software updating IMO requirements to the new IEC compliant version.
IEC 62923-1, IEC 62923-2, IEC 61162-450 ED.2
2 Product name : IMO onboard requirements for navigation and communication equipment
3 Model number : following table 1
4 Details
4.1 General
After August 30, 2021, new installation/retrofit ships will need to comply with the latest standards
to be equipped with the applicable equipment. Please update to the version shown in the table below.
IEC 62923-1, IEC 62923-2 : Bridge alert management(BAM)
IEC 61162-450 ED.2 : Digital interfaces – Ethernet interconnection
4.2 Information
Table 1 shows the standards and versions that apply to each equipment. When updating the software,
please check the contents of the individual Technical Information before proceeding.
Table 1
No Product name Model IEC62923 IEC61162 Software Technical Work
Version Information Time*1
1 VHF JHS-800S ✔ ✔ - in progress -
2 MF/HF JSS- ✔ - - in progress -
2150/2250/2500
3 NAVTEX NCR-333 ✔ - - in progress -
1
8 Log JLN-741 ✔ - - in progress -
JLN-900 and JFE-400/700 have been shipped with the compliant version since the first model, so
there is no need to update them.
*1 The work time is an estimate of the time required for updating, changing settings, and checking.
*2 Implemented AMS (Alert Management System) license on Conning display to run as BAM
Keep the old BAM and update the peripherals to the new version.:
Even if the AMS in Table 1 No. 16 is operating with the old standard BAM on an existing ship,
it is possible to upgrade the equipment listed in Table 1 to operate with the new standard.
In this case, the Alert Sense configuration file (BAM file) set in the AMS needs to be updated to
comply with the new standard. When updating the software, please check if the ship is equipped
with AMS before visiting the ship and prepare a BAM file according to the new standard. Please
ask for a new BAM file from the contractor who requested to you.
BAM file
The BAM system can be run without updating the BAM file. In this case, you will be notified of
2
the occurrence of alerts, but the table of the list of alerts that can occur on each equipment may
not be displayed correctly.
User Interfaces:
For equipment whose user interface has been changed to comply with the new standard, the
instruction manual has been revised. For details, please refer to the technical information of each
equipment.
2) IEC 61162-450
Compatibility:
Since it is upwardly compatible with the old standard, communication is possible even if they are
mixed.
However, the image transmission protocols between VDR and RADAR/ECDIS are not
compatible with the old and new standards. It is necessary to match the compatible standards.
3
b-2) For repair, maintenance and periodic inspections
The latest software of the VDR and AIS includes functional improvements, so it is necessary
to update the software to the new IEC compliant version when visiting a ship for repair,
maintenance, or periodic inspection. It is not required for other equipment to update the
software to the new IEC compliant version when visiting a ship for repair, maintenance, or
periodic inspection. However, this does not apply if functional improvements are included in
future software releases of each equipment.
Necessity of update to the new IEC compliant version
VDR/S-VDR ECDIS RADAR Conning/AMS Other
equipment *1
Target VDR/S-VDR Need No Need No Need No Need No Need
of ECDIS No Need No Need No Need No Need No Need
repair RADAR No Need No Need No Need No Need No Need
Conning/AMS No Need No Need No Need No Need No Need
Other No Need No Need No Need No Need Need
equipment *1 (AIS only *2)
*1 VHF, MF/HF, NAVTEX, AIS, Inmarsat-C, Satellite Log, Doppler Speed Log, GPS, GPS
Compass, BNWAS in Table 1
*2 When updating the software, please turn off the BAM setting on the AIS equipment. This will
keep the alert output as it was before the update, so that the Alert Sense configuration File
(BAM file) set in the AMS does not need to be updated. Please refer to the technical
information of AIS for more details.
4) Equipment in preparation
For equipment for which numbers are not listed in the Technical Information in Table 1,
preparations are underway to comply with the new standard.
The certification Agency (TUV) has issued a letter indicating that the equipment is undergoing
certification. Please use this letter as a substitute until the certificate is issued.
5) Work details
When installing the applicable equipment in a new ship on or after August 30, 2021, please
download the latest version of the software shown in Table 1 from "MS WEB" and update the
software according to the technical Information and work procedures.
As the certificate has been updated, please download it from "MS WEB" and replace the old
certificate kept on the ship.
The instruction manual for each equipment has also been updated. Please prepare the documents
before visiting the ship.
4
TÜV SÜD DANMARK ApS • Strandvejen 125 • 2900 Hellerup • Denmark
MED Certification Updates – Bridge Alert Management IEC 62923-1:2018 & IEC 62923-2:2018
Dear Mr Tanabe,
This letter is to confirm that TÜV SÜD Danmark have received applications for the update of the following
Marine Equipment Directive Module B Certifcates to incorporate the Bridge Alert Management (BAM)
requirements of IEC 62923-1:2018 and IEC 62923-2:2018.
JRC have performed in-house testing of the BAM functionality and are awaiting verification from by a third
party, TÜV SÜD Product Service test laboratory. Due to a large number of manufacturers requiring this
service there is a delay in processing the testing and certification which has now caused this to be taking
place after the implementation date for these requirements of 29th August 2021 as defined within
(EU)2021/1158.
Yours sincerely
Michelle Hardy
TÜV SÜD Danmark Technical Certifier
BABT-AL031-i02