Professional Documents
Culture Documents
KERAJAAN MALAYSIA
PERBENDAHARAAN MALAYSIA
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
KANDUNGAN
PK 2 KAEDAH PEROLEHAN KERAJAAN ................................................ 4
1. Tatacara Perolehan Kerajaan ....................................................... 4
(i) Perancangan Perolehan .................................................. 4
(ii) Peruntukan/Pembiayaan.................................................. 5
(iii) Larangan Pecah Kecil ...................................................... 5
(iv) Syarat Sub-Kontrak Atau Serah Hak............................... 6
(v) Syarat Pegangan Ekuiti Syarikat Semasa Tempoh
Kontrak ............................................................................. 6
(vi) Penyediaan Spesifikasi ................................................... 7
(vii) Penggunaan Kontrak Pusat/Kontrak Pusat Sistem Panel
.......................................................................................... 8
2. Kontrak Pusat................................................................................ 8
3. Kontrak Panel Berpusat ............................................................... 9
4. Kaedah Pelantikan Syarikat Bagi Perkhidmatan Multimodal
Transport Operator (MTO) .......................................................... 10
5. Pembelian Terus Bagi Perolehan Bekalan/Perkhidmatan dan
Kerja-Kerja Requisition .............................................................. 11
6. Lantikan Terus ............................................................................ 14
7. Sebut Harga ................................................................................. 14
(i) Peraturan Sebut Harga .................................................. 15
(ii) Perolehan Di Kalangan Syarikat Bertaraf
Pembuat/Pembekal ........................................................ 15
(iii) Pelawaan Sebut Harga ................................................... 15
(iv) Dokumen Sebut Harga ................................................... 18
(v) Penjualan Dokumen Sebut Harga ................................. 19
(vi) Tatacara Menguruskan Sebut Harga ............................ 19
(vii) Tempoh Sah Laku Sebut Harga .................................... 21
(viii) Penerimaan Sebut Harga ............................................... 21
(ix) Penilaian Sebut Harga ................................................... 23
(x) Jawatankuasa Penilaian Sebut Harga, Keahlian dan
Tugas Jawatankuasa ..................................................... 23
(xi) Asas Penilaian Sebut Harga .......................................... 26
(xii) Penyediaan Kertas Taklimat Sebut Harga .................... 26
(xiii) Jawatankuasa Sebut Harga ........................................... 27
8. Tender .......................................................................................... 29
(i) Had Nilai Tender ............................................................. 29
(ii) Perihal Umum ................................................................. 29
(iii) Dokumen Tender ............................................................ 32
(iv) Penjualan Dokumen Tender .......................................... 40
(v) Tempoh Sah Laku Tender ............................................. 41
(vi) Deposit Tender ............................................................... 42
(vii) Pengiklanan .................................................................... 43
(viii) Anggaran Harga Jabatan ............................................... 45
(ix) Bantahan Ke Atas Spesifikasi Tender Yang Menjurus
Kepada Sesuatu Jenama ............................................... 46
(x) Pembukaan Tawaran Tender ......................................... 47
(xi) Urus Setia Tender .......................................................... 48
M.S. 1/88
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
M.S. 2/88
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
LAMPIRAN............................................................................................ 88
M.S. 3/88
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
hendaklah digunakan.
2. Kontrak Pusat
(ii) Harga bagi item Kontrak Pusat adalah mengikut harga kontrak yang
ditetapkan.
M.S. 8/88
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
(iv) Senarai item di bawah Kontrak Pusat adalah seperti di Lampiran 2.0.
M.S. 9/88
Pekeliling Perbendaharaan Malaysia PK 2.1
PINDAAN
LAMPIRAN
M.S. 88/88
Pekeliling Perbendaharaan Malaysia PK 2.1 Lampiran 2.0
Jadual 1
TELEFON
NAMA SPESIFIKASI/ KADAR
BIL ITEM PEGAWAI MOF
SYARIKAT HARGA
03-8882
Lampiran A – Lampiran
1. Perkhidmatan Poslaju Lampiran 1 8861/3231/4669
F
Lampiran 1 – Lampiran
6. Perisian Microsoft (MLA 3.0) Lampiran 6 8861/4025/4085
20
Lampiran A – Lampiran
7. Kertas A4 Putih 80 gsm Lampiran 7 3242/8861/3231
D
M.S. 2
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
Lampiran 4
LATAR BELAKANG
No Akaun:
111231000201
AGENSI PENGGUNA
HARGA
4. Harga adalah dalam Ringgit Malaysia tidak termasuk semua jenis cukai yang
dikenakan oleh Kerajaan Malaysia.Kadar harga bagi membekal, memasang, menguji
dan mentauliah Alat Pemadam Api Mesra Alam AEROHUB® Aerosol Fire
106
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
Suppression System adalah ditetapkan mengikut isi padu bilik/ kawasan ‘normally
unoccupied’ sebanyak RM370.00 per meter padu termasuk aksesori dan rekabentuk.
5. Kadar harga bagi membekal, menguji dan mentauliah Alat Pemadam Api
1MY227 Clean Agent Fire Suppression System adalah ditetapkan mengikut isi padu
bilik/ kawasan ‘normally occupied’ sebanyak RM370.00 per meter padu termasuk
aksesori dan rekabentuk.
6. Kos-kos yang tidak termasuk di dalam kadar harga kontrak pusat di atas, jika
perlu, seperti berikut:
SKOP KONTRAK
b. Skop kontrak hanya terpakai untuk projek bangunan baharu Kerajaan yang
ditawarkan secara konvensional. Projek baharu secara reka dan bina tidak
tertakluk kepada Kontrak Pusat ini. Bagi bangunan Kerajaan sedia ada,
107
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
penggantian sistem sedia ada adalah berdasarkan keperluan “as and when
required”;
d. Alat pemadam api mesra alam 1MY227 Clean Agent Fire Suppression
System adalah untuk ‘normally occupied’. ‘Normally occupied’ bermaksud
bilik/kawasan yang ada penghuni atau yang kerap kali dimasuki seperti bilik
stor, bilik fail, bilik server dan bilik kebal.
SKOP KERJA
KAEDAH PELAKSANAAN
108
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
b. Projek penggantian bagi bangunan sedia ada akan dipantau oleh JKR atau
Kementerian/Agensi.
TEMPOH JAMINAN
10. Tempoh jaminan bagi Alat Pemadam Api Mesra Alam AEROHUB® Aerosol
Fire Suppression System dan 1MY227 Clean Agent Fire Suppression System adalah
dua belas (12) bulan dari tarikh penyerahan dan disah terima oleh Agensi/JKR.
11. Penyelenggaraan selepas tamat tempoh jaminan tidak termasuk di dalam skop
kontrak ini. Walau bagaimanapun, Agensi dengan peruntukan sendiri boleh
menggunakan khidmat Kontraktor sekiranya sistem tersebut memerlukan
penyelenggaraan.
ANGGARAN KEPERLUAN
13. Sekiranya Agensi tidak mematuhi arahan pada perenggan 12, Kontraktor tidak
boleh dipersalahkan jika berlaku kelewatan pelaksanaan kelak.
15. Agensi akan membuat pesanan setelah urusan reka bentuk dan lain-lain
perkara berkaitan selesai.
109
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
17. Agensi adalah dikehendaki memberi alamat yang lengkap serta nama pegawai
dan nombor telefon masing-masing kepada Kontraktor supaya perolehan dapat dibuat
dengan lancar dan tepat ke tempat yang ditetapkan.
19. Agensi dan Kontraktor dikehendaki menetapkan tempoh siap projek. Sekiranya
Kontraktor gagal menyiapkan projek dalam tempoh yang telah dipersetujui bersama
tanpa alasan yang munasabah, maka pihak Kontraktor boleh dikenakan Denda Atas
Kelewatan (Liquidated Ascertained Damages) berdasarkan formula berikut:
(Harga Perolehan X Base Rate (BR) Bank Negara) x Bilangan Hari Lewat
365 hari
PEMERIKSAAN
22. Semua peralatan yang dipasang mestilah baharu, tulen, berada dalam
keadaan baik dan memuaskan. Sekiranya peralatan tersebut didapati rosak atau
cacat semasa penyerahan, peralatan tersebut hendaklah ditolak dengan serta-merta
secara bertulis. Kontraktor hendaklah diminta menggantikannya dengan peralatan
yang baharu tanpa sebarang kos tambahan.
110
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
PEMBAYARAN BIL
24. Pembayaran bil yang dikemukakan oleh Kontraktor hendaklah dibuat mengikut
tatacara semasa yang ditetapkan dan masih berkuatkuasa. Bagi pesanan yang telah
disempurnakan oleh Kontraktor dengan memuaskan beserta Perakuan Siap Kerja, bil
mengenainya hendaklah dijelaskan dalam tempoh empat belas (14) hari dari tarikh bil
itu diterima.
26. Model Alat Pemadam Api Mesra Alam AEROHUB® Aerosol Fire Suppression
System yang dibenarkan adalah SS-20 dan jenama 1MY227 Clean Agent Fire
Suppression System adalah 1MY227. Spesifikasi teknikal bagi peralatan yang
berkaitan dan lukisan pemasangan adalah seperti di Lampiran A.
PENGGUNAAN KONTRAK
27. Semua Agensi hendaklah menggunakan 1PP ini sepenuhnya dan tidak
dibenarkan memperoleh daripada punca lain tanpa kelulusan Bahagian Perolehan
Kerajaan, Kementerian Kewangan atau Pegawai Kewangan Negeri mengikut mana
yang berkenaan.
111
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
HAL-HAL LAIN
28. Jika terdapat sebarang kemusykilan dan aduan mengenai prestasi Kontraktor,
Agensi boleh merujuk kepada:
112
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
Lampiran A
1. TECHNICAL SPECIFICATION
1.1 GENERAL
The fire extinguishing and detection system shall include but not limited
to the following:
The control functions and indication on the Fire Extinguishing Panel shall
be in accordance to the MS 1745: Part 2: or BS EN 54-2: 1997 + A1:
2006 and of type approved by Fire and Rescue Department Of Malaysia.
113
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
ii. Aerosol fire extinguishing agent that does not leave a residue upon
evaporation;
iii. Aerosol fire extinguishing agent that does not react, corrode and
damage the apparatus, equipment and system in place and certified
by manufacturer; and
1.3.1 General
iv. Calculate the quantity of agent required for the hazard and
fuel type within the enclosure. Factors such as non-
closeable openings, forced ventilation, low altitude, low
temperature and other conditions may affect the quantity of
agent required; and
1.4 ENCLOSURE
The system shall operate from an output voltage of 240V AC, 50Hz
supplied to the power charger module within the fire extinguishing panel.
This voltage is transformed and rectified within the panel to 24V DC. A 24V
DC SLA standby battery need to be provided in case of mains voltage
failure. This battery will automatically and instantaneously be switched into
use as soon as the mains supply fails. Such a failure shall be indicated
both visually and audibly at the panel. The battery shall be trickle-charged
during normal operating conditions.
The system shall consist of two or more combination heat and smoke
detectors. In order to discharge the extinguishing agent automatically, both
smoke and heat detectors must be activated (double knock). This mode
of operation obviates the possibility of false discharge due to one detector
operating to conditions which are regarded as normal.
The batteries shall be of heavy duty Sealed Lead Acid (SLA). The
battery supply shall be capable of supplying a minimum alarm load for a
period of at least an hour.
The following Warning and Instruction Signs shall be firmly attached to the
specified locations by the installer on the completion of Aerohub®
installation in unoccupied areas, where people may enter the enclosure.
1.10 WIRING
The wiring from the equipment terminal strips to make up for the complete
installation within each Fire Suppression System shall be done by the
Contractor.
120
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
Cable marker shall be provided for all the underground cable with
suitable distance. The underground cable shall be laid on a 50
mm (2”) thick compact sand bed and at least 900 mm below
ground level c/w a layer of hard baked brick along its routes.
Cable connections shall be made to a socket integral with the
back-plate. All underground cables shall be provided for by
others.
The power supply to the site shall be provided for by the Client, If the
power supply is not available, the testing and commissioning of the fire
extinguishing and detection system shall be conducted using a battery
supply.
1.12 PAINTING
All items to be painted shall be first cleaned and prime coated. The final
colour shall be applied in two coats. The paints shall be red colour and
gloss-finish type.
122
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
123
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
2. Demco
3. Hub
5. Kawapi
6. Industronic
7. Or Equivalent
b Contact Load 0.5 Amp Max.
c Quantity Provided As Requirement
12.0 Curtain Device
1. SRI
2. Demco
a Manufacturer / Brand 3. Hub
5. Kawapi
6. Or Equivalent
b Operating Voltage Nominal: 24 Vdc
c Quantity Provided As Requirement
126
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
127
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
128
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
129
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
1. TECHNICAL SPECIFICATION
1.1 GENERAL
ii. Gaseous fire extinguishing agent that does not leave a residue
upon evaporation;
iii. Gaseous fire extinguishing agent that does not react, corrode and
damage the apparatus, equipment and system in place and
certified by manufacturer; and
The contractor at design stage shall consider and address possible fire
hazards within the protected area. The proposed total flooding system
shall provide the highest degree of fire protection for designated areas.
The installation shall be designed and installed for extinguishing of fire in
accordance with approved standards. The quantity of extinguishing agent
shall be sufficient to ensure rapid extinction of any fire in the protected
areas and with adequate spare capacity. The agent shall be discharged
within a nominal discharge time of not exceeding 60 seconds upon
activation of the cylinders valve.
131
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
All devices shall be designed for the service encountered and shall not
be readily rendered inoperative or susceptible to accidental operation.
They shall be located, installed or suitably protected against mechanical,
chemical or other damage, which may render them inoperative.
1.4 ENCLOSURE
Fire Suppression Control Panel works like normal fire control panel
to receive and send signals to activate fire suppression system.
133
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
The system shall operate from an output voltage of 240V AC, 50Hz
supplied to the power charger module within the fire extinguishing panel.
This voltage is transformed and rectified within the panel to 24V DC. A 24V
DC SLA standby battery need to be provided in case of mains voltage
failure. This battery will automatically and instantaneously be switched into
use as soon as the mains supply fails. Such a failure shall be indicated
both visually and audibly at the panel. The battery shall be trickle charged
during normal operating conditions.
The system shall consist of two or more combination heat and smoke
detectors. In order to discharge the extinguishing agent automatically, both
smoke and heat detectors must be activated (double knock). This mode
of operation obviates the possibility of false discharge due to one detector
operating to conditions which are regarded as normal.
Each system shall have a permanent name plate specifying the agent,
number, gross weight/filling weight/nominal agent volume and the
pressurization level of the cylinders. All cylinders supplying the same
manifold outlet for distribution of agent shall be interchangeable and of one
selected size and charge where applicable.
The batteries shall be of heavy duty Sealed Lead Acid (SLA). The
battery supply shall be capable of supplying a minimum alarm load for a
period of at least an hour.
The following Warning and Instruction Signs shall be firmly attached to the
specified locations by the installer on the completion of system installation
in occupied areas, where people may enter the enclosure.
135
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
1.10 WIRING
The wiring from the equipment terminal strips to make up for the
complete installation within each Fire Suppression System shall be done
by the Contractor.
Cable marker shall be provided for all the underground cable with
suitable distance. The underground cable shall be laid on a 50
mm (2”) thick compact sand bed and at least 900 mm below
ground level c/w a layer of hard baked brick along its routes.
Cable connections shall be made to a socket integral with the
back-plate. The above shall be provided for by others.
The power supply to the site shall be provided for by the Client, If the
power supply is not available, the testing and commissioning of the fire
extinguishing and detection system shall be conducted using a battery
supply.
1.12 PAINTING
All items to be painted shall be first cleaned and prime coated. The final
colour shall be applied in two coats. The paints shall be red colour and
gloss-finish type.
137
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
2. TECHNICAL SPECIFICATION
138
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
1. Apollo
2. Context Plus
3. Hub
a Manufacturer/ Brand
4. Demco
5. Everyday
6. Or Equivalent
b Model Of Operation Thermistor
Nominal: 12/24 Vdc
c Operating Voltage Minimum: 8.5 Vdc
Maximum: 35 Vdc
d Alarm Indication Red L.E.D
e Effective Coverage Area 7m(L) X 7m(W) X 6m(H)
f Quantity Provided As Requirement
8.0 Alarm Bell
1. Apollo
2. Context Plus
3. Hub
a Manufacturer / Brand
4. Demco
5. Kawapi
6. Or Equivalent
b Operating Voltage Nominal: 24 Vdc
c Sound Output 95db
d Quantity Provided As Requirement
9.0 Twins Flashing Light
1. Sri
2. Demco
3. Hub
a Manufacturer / Brand
5. Kawapi
6. Industronic
7. Or Equivalent
b Operating Voltage Nominal: 24 Vdc
c Type L.E.D
d Quantity Provided As Requirement
140
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
141
Pekeliling Perbendaraan Malaysia PK 2 Lampiran 2.0
142