Delivery Lead Time

The document summarizes the delivery lead time for rails from voestalpine VAE SA. It outlines the key steps in the process: (1) Order placement and acknowledgement within 2 days, (2) Ordering of input material from the rolling mill within a week, (3) Rolling mill production takes 2 months, (4) Shipping takes 2-3 months after production, (5) Clearing and offloading takes 1-2 weeks, (6) Delivery to the factory within a week, (7) Inspection on arrival takes 1-2 days, (8) Storage until dispatch, (9) Notification to client when ready for collection, (10) Total lead time is
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
303 views2 pages

Delivery Lead Time

The document summarizes the delivery lead time for rails from voestalpine VAE SA. It outlines the key steps in the process: (1) Order placement and acknowledgement within 2 days, (2) Ordering of input material from the rolling mill within a week, (3) Rolling mill production takes 2 months, (4) Shipping takes 2-3 months after production, (5) Clearing and offloading takes 1-2 weeks, (6) Delivery to the factory within a week, (7) Inspection on arrival takes 1-2 days, (8) Storage until dispatch, (9) Notification to client when ready for collection, (10) Total lead time is
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

voestalpine VAE SA (Pty) Ltd

23 Anvil Road, Isando No. 12 Lakeview Crescent, Kleinfontein


PO Box 774, Isando, 1600 Benoni, 1500
South Africa South Africa
T. +27 11 928 3700 T. +27 11 421 4284
F. +27 11 928 3900 www.ngs projects.co.za
www.voestalpine.com/vaesa

The Secretariat / Tender Office


Metrorail Adjudication Committe
Passenger Rail Agency of South Africa
Shosholoza Junction
6th Floor, Cnr Leyds and Simmonds
Braamfontein
Johannesburg

RFP: 11/11/2022/GAU-(PER)

DELIVERY LEAD TIME : RAILS

Order Placement

The client sends a Purchase Order with the complete item description, quantity required and price.

Order Acknowledgement and Confirmation

When we receive the order, we will send acknowledgement of the order within 2 days

Ordering of Input Material

The order for the rails is placed with the Rolling Mill.
There must be minimum required quantities before order placement.
This is completed within a week of receiving the order.
The production of rails takes about 2 months based on the total order volumes.

Shipping / Delivery of Material

When the rolling mill receives the order, they schedule the production.
The shipping takes 2-3 months
Once the rolling is completed the rails are loaded and ready to be shipped.

Clearing and Offloading

Rails take another 1-2 weeks for clearing and offloading.


Delivery to Factory

Rails take a week to be delivered to the factory.

Inspection of Goods

On arrival, good are inspected to confirm they comply with specifications. This takes 1 – 2 days.

Manufacturing

No additional process for rails.

Storage of Finished Goods

Rails are kept in the storage yard to await despatch.

Notice to client that material is ready for collection

Client is notified that rails are ready for collection or despatch.

Client Inspection

Client may come and inspect finished goods if desired.

Despatch

Items are despatched.

The total lead time for the delivery of rails is 5 – 6 months from date of order.

Yours Sincerely

Sizwe Mkhize Thabo Nkhati


Business Development Officer (VAE) Project Manager (NGS)