JOINT STUDY

LANDUSE MAP

L DART ENERGY CBM PROPOSED WORKING AREA


EN E R G

NER A
MI
ID

AN
A
AY

BONTANG - BENGALON AREA


SU M
B ER D

EAST KALIMANTAN
BACKGROUND GEOLOGICAL MAP
The Bontang Bengalon study area is located in the middle part
of Kutei Basin, and considered as part of the Upper Kutei Basin. It is 117°17’30’’ 117°33’00’’ 117°48’30’’ NORTH BLOCK SOUTH BLOCK
B Tmme Period Epoch Formation
NORTH BLOCK SOUTH BLOCK
divided into two areas, which are North and South block. The Toml
Toml
Tmma
Tmt

Quartenary
Teom Holocene

location of North block is around Sangatta and South block

0°48’30’’

0°48’30’’
Tmt C Pleistocene

surrounds Bontang. Tok


Tok Tmbp
Tmpb
Pliocene Tmpk Tmpg

Dart Energy has a plan to develop CBM in Bontang Bengalon, Tmme

Late
East Kalimantan. Therefore, exploration and production of Coal Bed Tmbp
Tmme

Miocene
Tmp
Tmt
Area (km square) Area Percentage
Methane in Bontang Bengalon Area is proposed. The study area
Tmp Middle Tmpb Tmma
Landuse
Early
Tmbe North Block South Block North Block South Block
covers an onshore area of approximately 671.169 km. CBM

Tertiary
Tmp
Tomm
Tmpb
Toml
Urban Area 2,43 46,93 0,61 17,33

Oligocene
Late
exploration in Kutei Basin is interesting because mostly consist of Tmma Tok Coal KP 175,26 27,53 43,78 23,91
delta plain deposits in Middle Miocene - Late Pliocene. Early

National Park - 64,75 - 10,17


Teom

0°33’00’’

0°33’00’’
Late
Tmpk

Eocene
OBJECTIVES
Early

SOUTH BLOCK SWEET SPOT AREA


Tmbp
EXCLUDE NATIONAL PARK, COAL KP, AND URBAN AREA
The objectives of this joint evaluation are : LEGEND :

SEISMIC LINE
1. Collecting and making inventory of geological and geophysical Alluvium
Anticline Form
data related to CBM Working Area. Tmbp
Kampungbaru Formation
Balikpapan Formation
2. Processing, evaluating and interpretating data which will be Tmpb Tmbp
Syncline Form
Menumbar Formation
conducted based on “good engineering practice” to find out the Tendehantu Formation
Thrust Fault
potential CBM resources in the CBM Working Area. Maluwi Formation
0°17’30’’

0°17’30’’
3. Generating CBM development scenario as well as economic Bebuluh Formation
B C Geological Profile
Pulaubalang Formation
evaluation. Pamaluan Formation
Maau Formation
Lembak Formation
Tmbe

D E Kedango Formation
DATA AVAILABILITY Mangkupa Formation

509000 529000 549000 569000 589000


107800
107800

inal

0°02’00’’

0°02’00’’
0 15 km
Orig

5000 10000 m
MV

Sweet Spot Balikpapan (300-1000m) Urban Area


09_

117°17’30’’ 117°33’00’’ 117°48’30’’ Sweet Spot Balikpapan (1000-1500m) Coal KP


_05

Sekurau-1
151
SP0

87800
87800

KR
-1
D E
-4_

KR 2000 m
SOUTH BLOCK 2000 m
-19
KR

1000 m Tmp Qal Tmpb Tmbe Tmp Tmpb Tmbe Tmp Tmp Tmbp Tmpb Tmpb Tmbp Tmpk 1000 m
PS
KR - 0 m 0 m
-21 3
PS- -1000 m -1000 m
KR 7 Tutung-1
S-8 -31

5 0 5 10 km
BALIKPAPAN ZONE BALIKPAPAN ZONE
67800

67800

Sangatta BU -1
-12

B NORTH BLOCK C
KR

2000 m 2000 m
Tomm Tmp Teom Tok Qal
1000 m Tok Toml Tmpb Tmbp Tmme Tmma Tmme Tmt Qal 1000 m
0 m 0 m
-1000 m -1000 m
47800

47800
-2

5 0 5 10 km
KR

100 m
100 m

COAL DETERMINATION BASED ON WELL DATA


-14
F-4
F-1-03

500 m
27800

27800

Sweet Spot Pulaubalang (300-1000m) Urban Area


300 m
Sweet Spot Pulaubalang (1000-1500m) Coal KP

Runtu-1
(m) 0 1000 m
F-4-11
Cross-plot Analysis Result

TOP STRUCTURE MAP


Coal Seam of Sangatta Batu Utak-1 NORTH BLOCK SWEET SPOT AREA
F-1-1
Top Bottom Thickness Total Thickness EXCLUDE COAL KP AND URBAN AREA
7800

7800

F-4-12
(m) (m) (m) (m)
F-
1-0

56.1 60.8 4.7


2

F-1-02
111.4 113.4 2
RS
-06 0 82803 ft 141.1 141.8 0.7
Tanjung Wira-2 -93
197.4 200.4 3 PULAUBALANG ZONE
278.8 280.5 1.7
14.3 PULAUBALANG ZONE
67
-12200

-12200

450 368.6 369 0.4


K-5

557400 567400 577400 587400

407.9 408.7 0.8 00


.0
00
468.5 469.5 1 27

0
0
0
0.
509000 529000 549000 569000 589000

0
12

85300
85300
Mudlog 100 m
4 2 0 0. 0 0 0
Depth (m) Thickness Cutting
Top Bottom (m) Description
Seismic Data Information Well Data Information 29.5 30.0 0.5 black, mod.hard-hard, blocky
Seismic Total Length 55.0 60.0 5.0 black, hard, blocky

Lines (km) Well Name Total Depth (m) 110.0 111.0 1.0 black, hard, brittle

75300
75300
900 141.5 142.0 0.5 black, hard, brittle
2000 m
F-1-02 33.541 Tanjung Wira -2 3000 152.0 155.0 3.0 black, hard, brittle
195.0 198.0 3.0 black, hard, brittle 300
F-1-03 26.581 Runtu-1 2301.24 241.0 242.0 1.0 black, hard, brittle

0
4 2 0 0 .0 0
00
280.0 280.5 0.5 black, hard, brittle

.0
00
F-1-1 37.210 370.0 370.5 0.5 black, hard, brittle 12

Sangatta BU-1 1299.99 408.0 410.0 2.0 black, hard, brittle 4000 m
F-4-11 31.071

00
465.0 466.0 1.0 black, soft, brittle, platy 1000

.0
1272.99
0

Sekurau-1

65300
65300
0
27
483.0 484.0 1.0 black, soft, brittle, platy Sweet Spot Pulaubalang (300-1000m) Urban Area
F-4-12 23.362 636.0 637.0 1.0 black, soft, brittle, vitreous lst amber 42
00
.0
00

F-4-14 30.712 Tutung-1 3472.89 763.0 764.0 1.0 black, mod.hard, amber i.p 0
0
0
N
Sweet Spot Pulaubalang (1000-1500m) Coal KP

0.
70
862.0 862.5 0.5 black, mod.hard, amber i.p 5

1300
K-567 11.074 0
Scale = 1:123786

10315 20631 30946 ft 2000

KR-1 7.980
• Previous reports : Coal Geology 0 1238 2476 3713 4951 6189 m

55300
Report from Pusat Survey Geologi,
55300

KR-12 22.436
557400 567400 577400 587400

KR-19
Pusat Sumberdaya Geologi, Dit. Crossplot analysis from Sangatta Batu Utak-1 well with assumption of GR : 5 - 45 API, LLD : 100 - 1300 ohmm.
20.025
KR-2
Inventarisasi Batubara KESDM and The result, thereafter, is being compared to the coal seam from mudlog report, and noted the depth of seams are match The seismic section signifies a geometry of parallel layer formation The seismic section signifies a configuration of broad synclines separating
37.989
other publication. deepening eastward. On the west side of the block, the seismic reflector thrust faulted-tight anticlines which also trends NNE - SSE on the west part
KR-21 17.720
• Field Observation & Sampling shows a dome geometry, which based on the regional geology, it is well and deepening going eastward, and relatively parallel layers.
KR-31 14.147 known as the Pinang Dome. Balikpapan Formation noticed to be outcropped to the surface on the west.
• Surface mapping report of
KR-4 30.388 Sangatta, Bontang Area and
PS-3 11.048 surroundings and some coal CBM
PS-7 14.630 analysis data. COAL CHARACTERISTIC GAS CONTENT GAS IN PLACE SUMMARY Gas in place is calculated using formula :
RS-06-93
TOTAL RECOVERABLE GAS GIP = A . h . ñb . G
10.241
RS-15-93
NORTH & SOUTH BLOCK Where, GIP = Gas content In Place h = coal thickness
11.306 Main Potential (300-1000m)
S-8 36.975 Thickness (m)
Density Gas Content
GIP (m3) GIP (scf) A = Acreage (area of interest) ñb = bulk density of coal
NORTH BLOCK

Coal Zone Area (Km2) (gr/cc) (m3/t)


Gross Base Base Base Base G = gas content of coal
Ash Volatile Fixed Total
509000 529000 549000 569000 589000 Moisture Calorific Balikpapan 97,33 35 1,4 7,85 37441178766 1,32222E+12
Content Matter Carbon Sulfur
107800

Code Formation Value Pulaubalang 27,17 4 1,4 4,47 680667130,8 24037535105


PROPOSED WORKING AREA VCH4 min VCH4 min VCH4 avg VCH4 avg VCH4 max VCH4 max Total (scf) 1,34626E+12 Main Potential (300-1000m)
RECOVERY FACTOR
(%wt) (%wt) (%wt) (%wt) (%wt) (Kcal/Kg) Formation
BONTANG-BENGALON KR
Sekurau-1
-1
(m3/t) (scf/t) (m3/t) (scf/t) (m3/t) (scf/t) Total (Tcf) 1,35
Coal Zone
GIP (scf)
13 WB Balikpapan 7,3 4,3 43,6 44,8 2,35 6621 Balikpapan 6,77 237,52 7,85 275,56 9,28 325,71
87800

KR
-1
Base
-2

Upside Potential (1000-1500m)


KR 2

KR
Sweet Spot Balikpapan (300-1000m)
-1

-19 Urban Area


KR

2
Total area : 678.1 km KR
PS
-21 3
- 10 EB Pulaubalang 12,3 3,1 41,1 43,5 1,88 6210 Pulubalang 3,86 135,39 4,47 157,04 5,29 185,60 Density Gas Content Balikpapan 1.82846E+12
2 Tutung-1 Thickness (m) GIP (m3) GIP (scf) Sweet Spot Balikpapan (1000-1500m) Coal KP
South block : 272.6 km S-8
KR
-31
PS-7
PS-3
KR
-19
Coal Zone Area (Km2) (gr/cc) (m3/t)
KR
-2
PS-71
13 EB Pulaubalang 10,5 1,6 44,2 43,7 3,34 6283 Base Base Base Base Pulaubalang 75297687106
North block : 402.5 km2
67800

67800
1

KR

Total (scf) 1.90376E+12


rt_

-31
Pulaubalang 45,027 4 1,4 7,54 1902370278 67181578582
po
ex

CONCLUSIONS
al_

Sangatta BU -1
Total (scf) 67181578582
-12
igin

S-8
Total (Tcf) 1.90
KR

Or

Total (Tcf) 0,07


MV
9_
50
_0
51
47800

47800
01
P-2

Upside Potential (1000-1500m) 1. Bontang Bengalon area is promising area for CBM development.
KSR

Main Potential (300-1000m)


-4_
KR

Gas Content
Gross Thickness (m) GIP (m3) GIP (scf) GIP (scf) 2. Coal bearing formation are Balikpapan Formation and Pulaubalang Formation.
Moisture
Ash Volatile Fixed Total
Calorific
Coal Zone Area (Km2) Density (gr/cc) (m3/t) Coal Zone
Base 3. Balikpapan coal zone consist of average total thickness of 35 m for the north block and 22 m for
SOUTH BLOCK
-14

Code Formation Content Matter Carbon Sulfur Base Base Base Base
F-4
F-1-03

Value
27800

27800

Balikpapan 59,285 22 1,4 7,85 14335150292 5,06241E+11 Balikpapan 0


(%wt) (%wt) (%wt) (%wt) (%wt) (Kcal/Kg)
Pulaubalang 33,105 7 1,4 4,47 1451525726 51260152001 the south block. Pulaubalang coal zone consist of average total thickness of 4 m for the north
Runtu-1
Pulaubalang 88651847957
F-4-11 F-4-11 BE Balikpapan 11,8 2,1 43,1 43 0,1 5857 VCH4 min VCH4 min VCH4 avg VCH4 avg VCH4 max VCH4 max Total (scf) 5,57501E+11 block and 7 m for the south block.
-93

F-1-1
Total (scf) 88651847957
-15

Formation Total (Tcf) 0,56


4. The coal rank is mostly sub bituminous A – HV bituminous B with gas content ranges 197 – 257
F-1-1
RS

PS Runtu-1
F-4-12 BN Balikpapan 12,4 1,9 41,9 43,8 0,12 5970 (m3/t) (scf/t) (m3/t) (scf/t) (m3/t) (scf/t)
7800

7800

F-4-12
F-

Total (Tcf) 0.09


1-0

67

scf/ton for Balikpapan (base case) and 157 – 265 scf/ton for Pulaubalang coal (base case).
RS
2

K-5

-06
-93 F-1-02
K20 Balikpapan 13 2,8 39,3 44,9 0,18 5988 Balikpapan 4,85 170,25 5,63 197,44 6,65 233,31 Upside Potential (1000-1500m)
F-1-03

Tanjung Wira-2
-93
4-514

RS 0 82803 ft
5. GIP (base case) main potential at the north block is 1.35 Tcf whereas at the south block is 0.56
-06
-93
Pulubalang 6,51 228,53 7,54 264,81 8,91 312,72 Gas Content
F--1

K13 Balikpapan 11,2 1,7 42,6 44,5 0,11 6468


RS

Thickness (m) Density (gr/cc) GIP (m3) GIP (scf)


Coal Zone Area (Km2) (m3/t)
67

Tcf. Total GIP is 1.90 Tcf.


-12200

-12200
K-5

MD Balikpapan 6,1 1,7 43 49,2 0,69 7055 Base Base Base Base
509000 529000 549000 569000 589000 L4 Balikpapan 6,5 0,9 42,8 50,1 1,1 7156 Balikpapan 0 22 1,4 7,85 0 0 6. With moderate geological recovery factor of 60%, then the recoverable resources at the north
Pulaubalang 13,866 7 1,4 4,47 607970267,7 21470269374
Total (scf) 21470269374
block is 0.81 Tcf, whereas the south block is 0.33 Tcf. Total Recoverable Resource is 1.14 Tcf.
Total (Tcf) 0,02