Professional Documents
Culture Documents
DESIGN DRAWING
NAMA KEGIATAN
PEMBANGUNAN INFRASTRUKTUR
DESA POTENSIAL POTO TANO
NAMA PEKERJAAN
DED PENATAAN DRAINASE
PERMUKIMAN POTO TANO
LOKASI PEKERJAAN
KEC. POTO TANO
V 0 2 4 6 8 10 m
Skala 1 : 100
0 40 80 120 160 200 m
H
Skala 1 : 1000
9.910 0+025
9.420 0+050
9.180 0+075
9.110 0+100
8.930 0+125
8.520 0+150
8.370 0+175
8.420 0+200
8.340 0+225
8.260 0+250
8.240 0+275
8.270 0+300
8.450 0+325
8.910 0+350
9.380 0+375
9.610 0+400
8.519 9.520
8.418 9.420
8.263 9.265
8.103 9.110
7.808 8.815
7.519 8.520
7.478 8.478
7.436 8.436
7.394 8.395
7.353 8.353
7.311 8.311
7.269 8.270
7.610 8.621
7.960 8.969
8.310 9.320
8.660 9.670
ELEVASI RENCANA/DESIGN
CV. ARTHA DINAMIKA
ELEVASI DASAR SALURAN
BETON U-DITCH
BETON COR/PENUTUP
WAHIDIN, ST
DIREKTUR
MENGETAHUI / MENYETUJUI
PEJABAT PEMBUAT KOMITMEN
ISMU RAHMAN, ST
NIP. 19790121 201001 1 015
MENGETAHUI / MENYETUJUI
V 0 2 4 6 8 10 m
Skala 1 : 100
0 40 80 120 160 200 m
H
Skala 1 : 1000
9.870 0+625
9.910 0+650
9.720 0+675
9.180 0+700
8.430 0+725
8.210 0+750
8.170 0+775
8.380 0+800
8.610 0+825
9.080 0+850
9.370 0+875
9.230 0+900
8.240 0+925
JARAK PATOK / JARAK LANGSUNG
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00
ELEVASI EXISTING
8.865 9.870
8.635 9.640
8.405 9.410
8.161 9.180
7.676 8.695
7.210 8.210
7.204 8.204
7.198 8.198
7.192 8.192
7.187 8.187
7.181 8.181
7.175 8.175
7.170 8.170
ELEVASI RENCANA/DESIGN
BETON U-DITCH