____] contract documents has been found. Nothing in this approval shall be construed as revising, in any-way, the requirements for }
opal a) HB | SHOP DRAWING
cio Ofaull ab p>) PARSONS\s/"7 nnn
Revo.
Contract No. & Title: | IR 172- LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL
KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE)
‘Subject: SHOP DRAWING SUBMITTAL FOR HARDSCAPE SETTING OUT - SHEET 5
Location/Area: ZONE-2
Center Dew Csiro Detect Ciecnia
(| Ci Pumting Tring Pennings wae Omer
Discipline: -
Diiandsape Wicca Tisotscape Direation Tteecom
Csuvering Tlavanttyserveyng | Cl Geotechnical Thoth pec Serre Our
roi ‘Approv
SN Drawing No. Rev. Drawing Title woz |
1 ZAHIRI72LD-HS-ST-0005 00 | Shoo draning Submit for Haréscape Seting out Layout
sheet’
2 ZAWARIT240-HS-ST-0005!1 00 | Shop araning Suomi for Harscape Seting out Coordinates
sheet 5
AID AL HUSSAINLLC
; 10 FEB 2004 : z
a | INSMITTAL T
CONTRACTOR'S CERTIFICATION.
Reviewed and approved for conformance with the contract documents by:
410,02.2024
Conirééfor's Representative Date
ENGINEER'S REVIEW ACTION CODES: cea
A Approved E Incomplete; Returned Without Review
B_ [__] Approved as noted AA [_] For Authority Approval
c Revise & Resubmit NA [_] Approval Not Required
D [_] Rejected cN Cancelled
| The following Shop:Drawings:prepared:-by-M/s.Zaid.Al-Hussain.LLG for the above mentioned. projectihas heen-exami
the resulting action as Indicated. Approval of the submittal indicates only that no deviation from specific requirements of the
a fully Integrated and operable System as specified. Neither does an-approvat provide authorization to deviate from Contract
Documents without specific designated approval for each such deviation.
Resident Engineer (Name) ‘Signature (Date)
Engineer's Representative
ATTACH ADDITIONAL SHEETS AS NECESSARY