DAILY PROGRESS REPORT (HYDROMECHANICAL WORKS)

PENSTOCK WELDING

Project: SUPER NYADI HYDROPOWER PROJECT


Location: NAICHE, LAMJUNG

Date:

START TIME……………………………… END TIME…………………………………………

WELDERS:

Welding Process: SMAW

Welding Parameters: As Per WPS

Pipe number Pipe Pipe Welding Total length FAULT FOUND IN PER WELD Visual inspection DPT UT
(As written Diameter thickness completed After welding JOINTS
in pipe) * (joints) NO YES (specify the fault) ** PASS FAIL** PASS FAIL** PASS FAIL**

* Pipe number given at site for better quality check and easy installation ** visual presentation of Faults inserted below