You are on page 1of 2

Development controls

a. Total Lot Area


= 99, 832 sqm.

b. Lot Type
Inside lot

c. Minimum Setbacks Required in the Lot


RROW: 9 meter
Front Setback: 5 meters
Rear Setback: 2 meters
Side Setback: 2 meters

d. Building Occupancy
Division H-

e. Site Zoning Classification


Group H – Assembly for less than 1000 (Cultural and/ or Recreational)

f. Most stringent Allowable Maximum Building Footprint (AMBF)


AMBF = TLA – (area of front setback + area of left side setback + area of right setback + area of
rear setback
AMBF = 99, 832 – ((5 x 289) + (2 x 800.40) + (2 x 200.07))
AMBF = 99, 832 – (1,445 + 1600.8 + 400.1)
AMBF = 99, 832 – 4066.94
AMBF = 95, 765.06 sqm.

g. Most stringent Minimum Total Open Space on the Lot in square meters
TOSL = ISA + USA
TOSL = 19, 966.40 + 9983.20
TOSL = 29, 949.60 sqm
h. Maximum prescribed Impervious Surface Area in square meters
ISA = 20% TLA
ISA = 20% x 99, 832
ISA = 19, 966.40 sqm

i. Most stringent Minimum Unpaved Surface Area in square meters


USA = 10% TLA
USA = 10% x 99, 832
USA = 9, 983.20 sqm

j. Most stringent Maximum Allowable Construction Area in square meters


a. MACA = PSO + ISA
MACA = 80% + 19, 966.40
MACA = 19, 967.20 sqm
b. PSO from table
MACA = 80% TLA + ISA
MACA = 80% x 99, 832 + 19, 966.40
MACA = 79, 865.60 + 19, 966.40
MACA = 99, 832 sqm

You might also like