You are on page 1of 1

v.

SCHOLARSHIP BENEFITS

1. Each scholar shall be entitled to the benefits prescribed by law and the entitlement must be strictly made in
accordance with government accounting and auditing rules and regulations.

2. The coverage of the scholarship benefits are as follows:


TWSP STEP PESFA UAQTEA TTSP Tsuper RCEF CFSP
Iskolar RESP
Free Skills Training
Free National Competency Assessment
Training Support Fund P160/day P160/day P160/day P9000/sem P160/day 350/day P160/day P160/day
Free Entrepreneurship Training PAFSE
Starter Toolkits
New Normal Assistance p 1 , 000
Workshop Uniform Allowance
Accident Insurance Coverage
Book/Learning Materials Allowance p500 p5,000
*For Tsuper Iskolar - TSF coverage is maximum of 35 days.

3. The approved standard fees based on the latest Schedule of Cost for TESDA Scholarship Programs l shall strictly be
applied. The TVI shall not exact any additional fees from the beneficiaries (e.g. ID, uniform, laboratory fees, etc.), and
shall not require the scholars to provide supplies and materials during the duration of the training.

4. For Qualifications, micro-credentials, and New/Emerging programs not covered by the approved Schedule of Cost:

4.1. A project proposal that includes the proposed costing shall be prepared and used as basis in determining the
approved program costing to be indicated in the Qualification Map.

4.2. Allowable funding for each training proposal under TWSP, TTSP, CFSP shall not exceed Php50,000.00 per capita
cost. The coverage shall be the following:
4.21. Training Cost
4.2.1.1. Trainer's Honoraria,
4.2.1.2. Utilities;
42.1.3. Training Supplies/Materials; and
4.2.1.4. Maintenance of Facilities/Tools/Equipment
4.22. Training Support Fund
4.3. In case the per capita cost exceeds Php50,000.00, the TVI or training provider shall cover the additional expenses.

4.4. The Comprehensive Guide in Computing for the Training/Program Costs (Annex A) shall be used as the basis for
the evaluation of project proposals. The final cost of the proposed training program shall be approved by the
Director General, based on the review and recommendation of the ROMO-SMD that will evaluate this
proposal.

You might also like