What was the total cost of Job#920 as of the end of June 2019?

Applied Overhead
Direct Materials 3,350
Direct Labor 650
Applied Overhead 3,780
7,780

What was the cost of goods manufactured for June 2019?


Direct Materials Used 17,350
Direct Labor 6,300
Applied Manufacturing Overhead 3,780
Total Manufacturing Cost 27,430
Add: WIP, beginning -
Total cost of goods 27,430
Less: WIP, ending 9,450
Cost of Goods Manufactured 36,880

If actual overhead for June was P4,350, by how much is the underapplied overhead?
Underapplied overhead is 570
Applied Overhead 3,780