Professional Documents
Culture Documents
Engineering Graphics and Design 1/2 Grade 10 TASK 7.1 November Examination 2021
Engineering Graphics and Design 1/2 Grade 10 TASK 7.1 November Examination 2021
GRADE 10
TASK 7.1
MEMORANDUM
Page 1 of 7 © Impaq
November Examination Memorandum 2021
G10 ~ Engineering Graphics and Design P1/2
STUDENT
NUMBER
MARKS
MARKS
ACHIEVED
Question 1 30
Question 2 38
Question 3 38
Question 4 44
TOTAL 150
Page 2 of 7 © Impaq
QUESTION 1: MEMO
COMPONENT SYMBOL DESCRIPTION QUESTION 1 (d): ELECTRICAL CIRCUIT DIAGRAM
_
1.5V + CELL GIVEN INFORMATION:
QUESTION 1: ANALYTICAL (CIVIL)
Figure 4 shows the a simple electrical circuit that is
connected in series, as well as a table with the
SWITCH international symbols for some of the electrical and
electronic components.
RESISTOR INSTRUCTION:
LAMP
ANSWER QUESTION 1(d) IN THE PROVIDED SPACE
LIGHT EMITTING
DIODE (LED)
FIGURE 4
_ _
1.5V + 1.5V +
FREEHAND
FREEHAND
FREEHAND
½ Mark 1 Mark
ASSESMENT RUBRIC
Mark Mark achieved Mod
NGL NATURAL GROUND LEVEL
1 Question 1(a) 6
DOOR AND FRAME
DPC DAMP PROOF COURSE 2 Question 1(b) 8
FFL FINISHED FLOOR LEVEL 3 Question 1(c) 3
4 Question 1(d) 13
TOTAL 30
QUESTION 2: MEMO
QUESTION 2: SOLID GEOMETRY
GIVEN INFORMATION:
INSTRUCTIONS:
5
2 2 Project a right view.
Project a sectional top view.
5
2 Project the true shape of the section on cutting
plane A-A.
2 2
4 All constructions/projections must be shown.
2 2 All hidden detail must be shown.
2 2
[38]
2
4
Y
2 2
2 2
X1 Y1
1 5
Y2 1 1
1 4
1 1
4
1 1 1
X3
1 1
1
1 1
1
3 ½ Mark 1 Mark
Y3
ASSESMENT RUBRIC
Mark Mark achieved Mod
3 4
1 Sectional top view 15
2 Right view 15
3
3 True shape 5
3 4 Hatching 2
5 Name 1
TRUE SHAPE OF SECTION 5
TOTAL 38
QUESTION 3: MEMO
QUESTION 3:
TOP VIEW PERSPECTIVE DRAWING
GIVEN INFORMATION:
PP - PICTURE PLANE.
D=DOOR
HL - HORIZON LINE.
W5
W=WINDOW GL - GROUND LINE.
SP – STATION POINT.
W4 INSTRUCTIONS:
W3
Align the Worksheet with the HL or
W2 D1 W1 PP.
PP
Determine and label the vanishing
point showing all constructions.
Complete the one-point
perspective drawing showing all
constructions / projections.
No hidden detail required.
1
VP
1
HL
2 2 2
2
1 22
2
2 2 2 2
4
3 3
2
3 3 3 2
SP 4 4 4 3 ½ Mark 1 Mark
3 3
3 3 3 3 ASSESMENT RUBRIC
D1 3 34 4
Mark Mark achieved Mod
W5
W3
4 3 3 3 3
3 3 3
W4 W2 W1 4 1 VP and projections 5
3 3
3 GL 2 Roof 13
FRONT VIEW
3 Windows 12
4 Walls 8
TOTAL 38
WINDOW SCHEDULE
QUESTION 4: CIVIL DRAWING
1 000
1 500
the outside of the walls except when stated
X otherwise.
W2
(X)
D1 LINE INDICATES THE CENTRE LINE Incomplete foundation and wall detail.
ROOM 1 A window schedule and a door schedule.
OF AN INSIDE WALL.
(W1)
WINDOW INSTRUCTIONS:
6 500
A A FLOOR FINISH
All doors and windows.
ROOM 2 TILES All hatching detail.
ROOM 1: 1 000
ROOM 2: WOOD Label the rooms by showing the room designations
and the floor finishes.
1 350
Start at point A.
1 000
D2
A Draw the SECTIONAL ELEVATION on cutting plane A-A
1 400 to scale 1:10. Add the following features to the drawing:
4 600 The complete foundation and slab detail.
(W2) All hatching detail.
WINDOW Start at point B.
Label the following:
The sectional elevation.
Use the correct abbreviations when labelling the
following features according to standards: NATURAL
GROUND LEVEL, DAMP PROOF COURSE and
INCOMPLETE FOUNDATION
DOOR SCHEDULE FINISHED FLOOR LEVEL.
AND EXTERNAL WALL DETAIL
220 General
All substructures hatching may be drawn in freehand.
800 2 000 All drawings must comply with the guidelines and
graphical symbols contained in the SANS 10143.
500
PANEL
2 100
(D1) (D2)
DOOR SLIDING DOOR
250
B
700
QUESTION 4: MEMO ½ Mark 1 Mark
ASSESMENT RUBRIC - FLOOR PLAN
Mark Mark achieved Mod
1 Walls 10
2 Windows and doors 8
3 Hatching 8
4 Labels 4
TOTAL 30
FOUNDATION TO FLOOR
Mark Mark achieved Mod
5 Foundation 7
1
3
1 6 Hatching 3
3
7 Headings 4
2 1
1 6 TOTAL 14
5
ROOM 1
2 2 2 1
5 BIG TOTAL 44
TILES
2
1
2 3
3 1
1 1 7
1
DPC 5 5
5 6
5
3
7
5 5
NGL
1
1
ROOM 2 2
WOOD 2
6 6 6
5 5
2
5
1
1
5 6 5
3
1 2 2 1
3 1 2 2 1 3
1 2 2 1
A 5
B