NO DRAWING NO ISSUES

AT 13/14 GRID FROM C TO D STAIR CASE IS NOT COVERED AT


109LVL DUE WHICH THE RAIN WATER WILL GO INSIDE THE NOT REQUIRED AS PER ELECTRICAL
1 0215 R4 SHEET 2 OF 4 FLOOR AT 100.8 REQUIREMNT
NO DETAILS IS SHOWING IN DRAWING OF DRAIN IN BATTERY NOT REQUIRED AS PER ELECTRICAL
2 0215 R3 SHEET 1 OF 4 ROOM REQUIREMNT

TRANSFORMER FOUNDATION DETAILS


SHALL BE SEPARATELY
RELEASE ,HOWEVER ,FLOORING TO BE
NO DETAILS OF TRANSFORMER FOUNDATION IS SHOWING IN CASTED IN TRANSFORMER ROOM IS
3 0215 R3 SHEET 1 OF 4 DRAWING. ALREADY HATCHED.

4 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF SHIFT OFFICE ROOM IS NOT AVAILABLE


5 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF AHU ROOM IS NOT AVAILABLE

6 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF ECMS/LMS ROOM IS NOT AVAILABLE


ALL ARE INCORPORATED, YOU MAY
FINISHING SCHEDULE OF BATTERY CHARGER RACK ROOM IS REFER,INCASE OF MISSING ,LET US KNOW.
7 0215 R5 SHEET 4 OF 4 NOT AVAILABLE
THE FLOOR WHICH WAS HOLD AND MARKED AS ** HAS BEEN
8 0215 R3 SHEET 1 OF 4 CASTED.
THE FLOOR AT 104.00 LVL FROM GRID 2-13/A TO C THE
9 0215 R3 SHEET 1 OF 4 FINISHING SCHEDULE IS NOT SHOWING.
SHALL BE PROVIDED, SEPARATELY DWG
10 GARLAND DRAINS WILL BE PROVIDED OR NOT SHALL BE ISSUED
DOOR WINDOW DRAWING SHALL BE
11 0215 R3 SHEET 1 OF 4 IN STAIR CASE W1 IS SHOWING THAT WILL BE OPENABLE OR FIX ISSUED SHORTLY
ABOVE CUTOUTS FOR AIR INTAKE LOUVERS THE CHHAJJA WILL
12 0215 R3 SHEET 1 OF 4 BE PROVIDED OR NOT REFER DWG

OTHER MISCELLENEOUS AND UPDATED DRAWING RELATED TO BAGGING SUBSTATION AS ASKED SHALL BE ISSUED SHORTLY