AT 13/14 GRID FROM C TO D STAIR CASE IS NOT COVERED AT
109LVL DUE WHICH THE RAIN WATER WILL GO INSIDE THE NOT REQUIRED AS PER ELECTRICAL 1 0215 R4 SHEET 2 OF 4 FLOOR AT 100.8 REQUIREMNT NO DETAILS IS SHOWING IN DRAWING OF DRAIN IN BATTERY NOT REQUIRED AS PER ELECTRICAL 2 0215 R3 SHEET 1 OF 4 ROOM REQUIREMNT
TRANSFORMER FOUNDATION DETAILS
SHALL BE SEPARATELY RELEASE ,HOWEVER ,FLOORING TO BE NO DETAILS OF TRANSFORMER FOUNDATION IS SHOWING IN CASTED IN TRANSFORMER ROOM IS 3 0215 R3 SHEET 1 OF 4 DRAWING. ALREADY HATCHED.
4 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF SHIFT OFFICE ROOM IS NOT AVAILABLE
5 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF AHU ROOM IS NOT AVAILABLE
6 0215 R5 SHEET 4 OF 4 FINISHING SCHEDULE OF ECMS/LMS ROOM IS NOT AVAILABLE
ALL ARE INCORPORATED, YOU MAY FINISHING SCHEDULE OF BATTERY CHARGER RACK ROOM IS REFER,INCASE OF MISSING ,LET US KNOW. 7 0215 R5 SHEET 4 OF 4 NOT AVAILABLE THE FLOOR WHICH WAS HOLD AND MARKED AS ** HAS BEEN 8 0215 R3 SHEET 1 OF 4 CASTED. THE FLOOR AT 104.00 LVL FROM GRID 2-13/A TO C THE 9 0215 R3 SHEET 1 OF 4 FINISHING SCHEDULE IS NOT SHOWING. SHALL BE PROVIDED, SEPARATELY DWG 10 GARLAND DRAINS WILL BE PROVIDED OR NOT SHALL BE ISSUED DOOR WINDOW DRAWING SHALL BE 11 0215 R3 SHEET 1 OF 4 IN STAIR CASE W1 IS SHOWING THAT WILL BE OPENABLE OR FIX ISSUED SHORTLY ABOVE CUTOUTS FOR AIR INTAKE LOUVERS THE CHHAJJA WILL 12 0215 R3 SHEET 1 OF 4 BE PROVIDED OR NOT REFER DWG
OTHER MISCELLENEOUS AND UPDATED DRAWING RELATED TO BAGGING SUBSTATION AS ASKED SHALL BE ISSUED SHORTLY