You are on page 1of 1

MR.

Omary
No Chapter/ Question/Comment Answer
ITEM
a Soil The consultant shall perform six (6) numbers The depth of the drilling
investigation on of boreholes at the proposed 2nd Hinode borehole is determined based
the bridge bridge. The location of the boreholes shall be on the SPT results (N- value).
distributed equally at the location of If the N-value 50 is obtained
abutments and pier locations. before the depth is 30 meters
and the SPT is carried out 3
times, the result is still N-
value 50, then the borehole
drilling is stopped
(Completed).
The drilling should be terminated at the If the drilling bore hole depth
required depth i.e. 40m below ground level has not yet reached the N-50
as stated on the TOR value, the SPT drilling bore
hole test is continued to a
depth with a maximum depth
of 40 m.
SPT shall be conducted at every 1.5m The Consultant will follow as
intervals and any changes in soil starter, directed by the guidance the
collecting disturbed and undisturbed samples requirement soil investigation.
when encountered
- Reference energy effisien of
60 % (ASTHO 4633)
Soil The consultant shall open a trial pit at least The Consultant will follow as
investigation on 1.0m deep at the proposed access road at directed by the guidance the
the access road every 500m interval collecting samples for requirement soil investigation
sieve analysis, moisture content, atterberg
limit, four (4) days CBR test with swelling
measurement on the subgrade additional
consultant shall perform DCP test at every
250m interval on the existing pavement