WORK SCHEDULE AND PLANNING - REALIZATION & PROPOSED AMENDEMENT - 01

DED for 2ND Hinode Bridge in Comoro River and Access Road,
Target Interim Design Report ( 30 % ) Draft Design Report ( 30 %) Final Design Report ( 30 % )
`
WORKS SCHEDULE AND PLANNING - REALIZATION

Penanggung Jawab Sch March '24 April '24 May '24 June'24 July'24
Item Description

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20
Real
A Name Core all Detail Engineering Design
Coordinator Bridge Design, Highway, Qty, Geotech ,
1 Ir. Mulia Purba,MA, MT Hidrology, Geodetic,Etc Sch

Control and support Sructure Bridge , Highway, Geotechnic


Real/ Ext.
Control and support Qty /bidding Document
Control support Hidrology , River Traning

Control support Topo Lidar /Groun survey, Envireonment

prepare Inception,Interim, Draft Final 0Final Report


2 Ir. Feridon Chaidir Design 2nd Hinode Bridge Sch

- Standart /Acuan2, Referensi /code, material, SNI, LRFD


Real/ Ext.
Top Structure - Creteria Design , Modeling Bridge Element, ,
Pembebanan2 , gempa , respons spectra,, kombinasi
- Analysis Design, control moment, shear, defelction
-Modeling Bridge Element, Control Top Stucture,LRB,Pier,
report DED
Bottom Structure - Soil Fondation SPT, Calculation, Bottom Structure,
borepile,Lpile,group and fondation Structure,
analysis,Abutment , Footing,coloum pier
foot protection block at pier protection., Footing
Cad Structure /Quantity Rebar Bending, Deviator, Tendon layout, Tendon,
Prepare Drawing Bridge
3 Ir. Herryanto Pavement/ Highway Sch
- Design Creteria , Analyse Traffic ,Pavement Design Real/ Ext.
- Adjust Geometric Typical Standar design for Widening
- Adjust Wideining to pavement, Drainage ,clear zone,
Design Drainage, etc
1.Traffic Survey 1. Traaffic count ,Travel Speed,
2. Trafiic calculation , Analyse
3 Result Traffic Survey.
embankmet , Flexible pavement, overlay, drainase,
2.Pavement Design foothpath , traffic sign
3. Highway Design Civil 3 D, (Alignment Hor, Ver, Long) , cross sections
Widening , pavement,overlay, Drawing , volume , etc
4 Ir. Amri Sudarwibowo Quantity BQ , bidding Document Sch
Anania Barros Basic price, material, Cost Analyse Real/ Ext.
Q'ty Accses road , combine Structure, drainase,Ulilities
Prepare Final B/Q , Specification, Special Specification
prepare bidding Document
5 Ir, Francisxus Sriyoto Geotechnical/Material Sch
Soil Investifation Control Drilling Bore hore , NSPT value, all test corebox Real/ Ext.
Control Sondir test , value , CBR test
Calculate bore pile bearing capacity fondation
Report Soil Investigation
CBR evaluation for pavement design
review existing Design pavement
6 Ir. Hendry Andreyas,MT Hidrology Sch

Map Topo , Cachmaent Area, Railfall data ,Survey Flood on


Comoro River 250 m from bridges , review hirology data
( rainfall, cross section river, height flood, catchment )
Real/ Ext.
review river traning existing , and analyis next river traning
Identififation Area prone to flood and iundation
Drainase Access road, drawing, calculation, dimention,
Design Drainase
7 Ir. Daniel Yogiana Topo Graphi / Lidar /Ground Survey work Sch
1. Topo /Lidar Arrange BM, GCP, topo Lidar , Ground Survey Real/ Ext.
Arange Countor , Coordinate, Elevation
2. Ground Survey BM, CP, Level for Cross Section ( Use TS and Level )
Process data Survey , Input to Civil 3 D
8 Ir. Lestari, MT Social /Environment /Larap Sch
Arr Environment affected due to Corridor Widening Real/ Ext.
resident, AP, A Appraisal Coor with Stake Holders
LARAP and Report