MINE PLANNING & PROJECT PLANNING
OPENCAST MINING
• GEO-MINING CONDITIONS
• TECHNOLOGICAL OPTIONS & MINING METHODS
UNDERGROUND MINING
• TECHNOLOGICAL OPTIONS & MINING METHODS
• UNDERGROUND METHODS
• OPENCAST METHODS
• HYBRID METHODS (HIGHWALL MINING)
STAGE 1
STAGE 2
STAGE 3
CHOICE OF MINING METHOD, TECHNOLOGY AND RATED CAPACITY
GEO-MINING CONDITIONS
• TOPOGRAPHY
• SEAM THICKNESS AND DISPOSITION
• STRUCTURAL COMPLEXITY
• UG WORKINGS/FIRE etc.
• STRIPPING RATIO
• RATE OF ADVANCE & DEEPENING
LOGISTIC LIMITATIONS
ENVIRONMENTAL CONSIDERATIONS
FUND AVAILABILITY
INFORMATION FLOW AND PROCESS IN OPENCAST PLANNING
Geographical Features
Base Geological Report
& Surface constraints
Study of GR &
Surface features in details
Estimation of Mineable
Reserve
Finalization of PR
DATA INPUT FOR TOPOGRAPHICAL DATA
OPENCAST MINE PLANNING •Physiography
•Drainage
•Surface Features
METEREOLOGICAL DATA
LAND USE DETAILS
GEOLOGICAL DATA
•Regional Geology
•Borehole Logs
•Floor Structure (Each Seam)
•Roof Structure (Each Seam)
•Seam Isochores
•Overburden Isopach Maps
•Interburden Isopach Maps
•Geological Structure
•Seam Structure Data/Quality data
HYDROLOGY & HYDROGEOLOGICAL DATA
OTHER DATA
•Accessibility
•Power
•Water
OPENCAST PROJECT AND MINE PLANNING
DEPOSIT APPRAISAL
DELINIATION OF MINE BOUNDARIES
ESTIMATION OF MINEABLE RESERVES
ESTIMATION OF OB AND AV. STRIPPING RATIO
OPENCAST
METHOD OF MINING & SEQUENCE OF MINING MINE PLANNING & DESIGN
EQUIPMENT SELECTION & SCHEDULING
PRODUCTION SCHEDULING
DUMP & RECLAMATION PLANNING
ANCILLARY EQUIPMENT PLANNING
MINE UTILITIES & FACILITIES PLANNING (MATERIAL HANDLING, POWER, WATER)
LAND REQUIREMENT & CIVIL CONSTRUCTION PLANNING
ENVIRONMENTAL MANAGEMENT PLANNING AND MINE CLOSURE
SAFETY AND CONSERVATION
MANPOWER PLANNING
PROJECT IMPLEMENTATION SCHEDULE
CAPITAL & OPERATING COST ESTIMATES
FINANCIAL ANALYSIS & SENSITIVITY ANALYSIS
OPENCAST METHODS
ADVANTAGES:
CHALLENGES:
• ENVIRONMENTAL ISSUES.
• WEATHER AFFECTS ON OPERATIONS.
• LAND ACQUISITION.
• REHABILITATION & RESETTLEMENT.
• EXTERNAL DUMP SPACE.
• ENVIROMENTAL & FORESTRY CLEARANCES.
• INCREASED DEPTHS (> 300 m) OF MINES IN FUTURE).
OPENCAST METHODS
STRIP MINING
OPENPIT MINING
CONTOUR MINING/MOUNTAIN TOP REMOVAL
STRIKE MINING VRS DIP-RISE MINING
TERRACE MINING
HORIZONTAL SLICING
INCLINED SLICING
BACKFILL MINING
OPENCAST METHODS
GEO-MINING CONSIDERATIONS
MINERAL DEPOSITS
NON-STRATIFIED
STRATIFIED
IRON
COAL/LIGNITE/PHOSPHATE
ORE/BAUXITE/GOLD
STRATA PRESENCE OF
CONDITIONS AQUIFERS
BACKFILLED BY BACKFILLED BY
DIRECT CASTING TRANSPORT
ROUND THE PIT
OPENCAST METHODS
TECHNOLOGICAL
OPTIONS
TRANSPORTABLE NON-TRANSPORTABLE
SHOVEL-DUMPER COMBINATION
SCRAPER OPERATION
08/03/20 16
13 0 0 N
- 7 90 0E
140 0 N
15 0 0 N
16 0 0 N
170 0 N
18 0 0 N
19 0 0 N
2 0 0 0N
2 10 0 N
22 00 N
2 3 0 0N
24 0 0 N
25 00 N
2 6 0 0N
2 7 0 0N
OPENCAST METHODS
2800N
2 9 0 0N
3 0 0 0N
3 10 0 N
3 200N
3 3 0 0N
34 0 0 N
3 5 0 0N
3 6 0 0N
37 00 N
3 800N
3 9 0 0N
40 0 0 N
4 10 0 N
4 2 0 0N
43 00 N
- 8 0 0 0E
4 400N
MINES IN TALCHER COALFIELD
4 5 0 0N
46 0 0 N
DISPOSITION OF COAL SEAMS
4 700N
MULTIPLE SEAMS, MODERATELY INCLINED (7-15 DEGREES) AND STRUCTURALLY DISTURBED
OPENCAST METHODS
K O N A R K B L O C K
SECTOR-L
SECTOR-K SECTOR-J
SECTOR-H SECTOR-I
SECTOR-G
SECTOR-F
SECTOR-E
SECTOR-D
SECTOR-C
GOPALPRASAD WEST
GOPALPRASAD EAST
& EASTERN PART OF
BLOCK
SECTOR-B
SECTOR-A
NATARAJ BLOCK
TRUCKS/DUMPERS
DIESEL
DIESEL ELECTRIC
TROLLEY ASSISTED
HIGHWALL MINERS
PLANNING OF UNDERGROUND (UG) MINES
MINE SUPPORT
MINE VENTILATION
MINE PUMPING
Note:
For extreme geo-mining parameters like thick seams or steeply inclined seems,
special mining method such as blasting gallery, Longwall Top Coal Caving, Sub
level caving etc. are considered.
To support overlying structures, Bord & Pillar (With SDL or LHD) and sometimes
Longwall methods are used with sand stowing
GENERAL LAYOUT OF AN UNDERGROUND MINE
ADVANTAGES
CHALLENGES
Low Recovery
Hazards of gas, fire, inundation, etc
High Specific investment
Higher cost of production
OPENCAST MINING – ISSUES AND CHALLENGES
TECHNO-ECONOMIC CONSIDERATIONS
DEEPER MINES WOULD ENTAIL HIGHER STRIPPING RATIOS.
ACQUIRING LAND AND R&R ISSUES MAKING MINING A HIGH RISK BUSINESS.
REASONS:
IN THE 80’S AND 90’S, THE CAPACITY OF THE MINING PROJECTS WERE
PLANNED/CONSTRAINED BASED ON
REASONS:
TECHNO-ECONOMIC CONSIDERATIONS
DEEPER MINES WOULD ENTAIL HIGHER STRIPPING RATIOS.
STAGE 1
STAGE 2
STAGE 3
ACQUIRING LAND AND R&R ISSUES MADE MINING A HIGH RISK BUSINESS.
EXPLORATION STATUS
SURFACE CONSTRAINTS:
EXISTING MINES
ROADS/RAILWAY/POWERLINES
HABITATION AREAS
WATERBODY/NALLA/RIVERS
FLOOR BOUNDARY FIRE/UG WORKINGS etc.
TECHNO-ECONOMICS
SURFACE BOUNDARY
STAGE 1
TYPICAL OPENCAST MINE PLANNING LIFE CYCLE
FLOOR BOUNDARY
SURFACE BOUNDARY
STAGE 2
TYPICAL OPENCAST MINE PLANNING LIFE CYCLE
SURFACE BOUNDARY
STAGE 3
EXTENDED SURFACE BOUNDARY