Department of Public Works and Highways Issue Date: April 25, 2017

Bureau of Design Doc. Code: DPWH-BOD-WPD-QMSF-05


Water Projects Division Revision No.: 2
Checklist for Water Engineering Projects Page No.: 1 of 5
DOTS Transaction Code: BOD. Ref. No.:
Project Description:
Office or
Consultant:

Location: Approved by:


Type of Structure:
Type of Documents: Plans Report Analysis Change Order Variation Order Others: _________

ITEMS COMMENTS

I. LIST OF REQUIRED DRAWINGS


Y N N/A
Is the cover sheet present?
Is the index of drawings present?
Are the location plan and vicinity map present?
Is the spoil site area indicated on plan? (Dredging)
Is the general notes present?
Are the legends, symbols, and abbreviations present?
Is the summary of quantities present?
Is the hydraulic design data present?
Is the geotechnical data (boring log) present?
Is the typical section present?
Are the plan and profile included?
Are the cross-sections included?
II. REQUIRED SUPPORTING DOCUMENTS
Y N N/A
Hydrologic (Discharge) Analysis for
Dikes/Embankment/Levees, Spurdikes, Revetments,
Groundsills, Small Dams, Sluiceways & Conduits,
Culverts, Detention Basins and Pumping Stations

Detailed Hydraulic (Water surface profile) Analysis for


Dikes/Embankment/Levees, Spurdikes, Revetments,
Groundsills, Sluiceways and Conduits, Culverts and
Detention Basins
Scour (Depth of scour) for Revetments,
Dikes/Embankment/Levees, Spurdikes, Dredging,
Groundsills and Outlet Structures

Slope stability analysis for Revetments,


Dike/Embankments/Levees, Earthfill and Rockfill
Dams, Detention Basins and Dredging Works

Seepage Analysis for Earthfill and Rockfill Dams,


Dikes/Embankment/Levees, Detention Basins and
Groundsills
Department of Public Works and Highways Issue Date: April 25, 2017
Bureau of Design Doc. Code: DPWH-BOD-WPD-QMSF-05
Water Projects Division Revision No.: 2
Checklist for Water Engineering Projects Page No.: 2 of 5
Y N N/A
Settlement Analysis for Dike/Embankment/Levees,
Dams, Pump House/Station, Sluiceway and Conduits
Sediment Transport Analyses for Dredging Works
Steel Sheet Pile Analysis
Design Analysis and Calculation for the
Dike/Embankment/ Levees and Appurtenant
Structures For Conduits/Drainiage Crossing and/or
Sluiceway
Overall Stability Analysis for
Dikes/Embankment/Levees and Dams
Structural Analysis for Revetments, Concrete Dams,
Pump House/Station and other Reinforced Concrete
Structures (i.e., Manholes and Access Chambers)
Detailed Quantity Calculations
Geotechnical/Soil Investigation
Copy of Terms of Reference (if prepared by
consultants)
III. READY CHECK FOR WATER ENGINEERING DESIGN PLANS

A. Title Sheet

Are the following indicated?


Y N N/A
Title of the project
Project length and limits (cross check its veracity in
the plan and profile)
Location
Signatories/recommending officials and their
corresponding signatures

B. Index of Drawings
Y N N/A
Are index of sheets/drawings complete and in order?
C. Location Plan/Vicinity Map

Are the following indicated?


Y N N/A
Location (province or city) of the project
Vicinity map
D. General Information Sheets
Y N N/A
Are the general notes indicated applicable to the
project?

Department of Public Works and Highways Issue Date: April 25, 2017
Bureau of Design Doc. Code: DPWH-BOD-WPD-QMSF-05
Water Projects Division Revision No.: 2
Checklist for Water Engineering Projects Page No.: 3 of 5

Are the Hydraulic Design Data completely provided?


Are the reference of the specifications and special
provisions indicated?
E. Legends/Symbols and Abbreviations
Y N N/A
Are the legends, symbols and abbreviations
applicable to the project?

F. Summary of Quantities
Y N N/A
Are the Item No., Description of Items of Work
involved, Unit, and Remarks properly indicated and in
accordance with the latest D.O. for the Standardized
Pay Items of Works for Civil Works Construction for
Infrastructure Projects?

Are the quantities indicated vis-à-vis the submitted


quantity calculations, the same?
Are the tabulation of old and new quantities
presented? (revised quantities separately indicated in
case of revised plans or “As-Staked” plans)

G. Typical Section Sheets

Are the following correctly indicated?


Y N N/A
Ordinary Water Level (OWL)
Maximum Experienced Flood Level (MEFL)
Design Flood Level (DFL)
Freeboard Clearance
Elevation of proposed top of structure
Elevation of proposed berm of dike/revetment
Elevation at the top of cut-off wall/pile cap at the foot
of revetment
Pavement and shoulder cross slope
Side slope/s
Right-of-way (ROW) limits
Dimensions of the cut-off wall at the bottom of
revetment
Width of the top of structure (min. to max.)
Length of sheet piles
Section modulus of sheet piles
Location, size, type and spacing of weepholes as well
as the type and dimensions of filter pockets at the
proposed revetment

Department of Public Works and Highways Issue Date: April 25, 2017
Bureau of Design Doc. Code: DPWH-BOD-WPD-QMSF-05
Water Projects Division Revision No.: 2
Checklist for Water Engineering Projects Page No.: 4 of 5
Y N N/A
Type of fill materials for void or eroded portions
behind the proposed revetment (if boulder fill, verify
sizes)
Type of embankment material and degree of
compaction
Size of stones for foot protection works
H. Details

Verify if the following are correctly indicated.


Y N N/A
Weepholes
Top of Structure (Anchoring of Revetment)
Pile Cap
Sheet Pile
Anchor rod or beam, anchor pile
Connection with existing structures
Training works (spurdikes and guidebanks)
Stairways/Access for maintenance
End of Slope Protection Works
Drainage, inlet and outlet structure
Others as may be necessary
I. Plan
Verify if the following are correctly indicated.
Y N N/A
Stationing/Limits
Contour lines with elevations using standard intervals
(1m. Interval for flat sections and 5m. Interval for
mountainous sections)
Location of boreholes
Direction of stream flow
Centerline
Location, description and elevation of benchmarks
Azimuths, Distances, and PI No. and check the
orientation of the azimuth and accuracy of distances
between PI's.
Directional sign/informatory sign (northing)
Existing structures (bridges, private and public
structures/utilities)
Elements of horizontal curves including its limit and
check if they are accurately indicated on plans
Matchline at every sheet
Right-of-way (ROW) limits
Department of Public Works and Highways Issue Date: April 25, 2017
Bureau of Design Doc. Code: DPWH-BOD-WPD-QMSF-05
Water Projects Division Revision No.: 2
Checklist for Water Engineering Projects Page No.: 5 of 5

J. Profile

Verify if the following are indicated.


Y N N/A
Stationing/Limits
Ordinary Water Level (OWL)
Maximum Experienced Flood Level (MEFL)
Design Flood Level (DFL)
Freeboard Clearance
Elevation of proposed top of structure
Elevation at the top of cut-off wall/pile cap at the foot
of revetment
Existing left and right banks
Design riverbed
Existing riverbed
Invert elevations for drainage structures
Drainage slope

K. Detailed Cross-Sections

Verify if the following are indicated.


Y N N/A
Stationing/Limits
Ordinary Water Level (OWL)
Maximum Experienced Flood Level (MEFL)
Design Flood Level (DFL)
Freeboard Clearance
Side slope/s
X and Y coordinates and required dimensions
Elevation of proposed top of structure
Existing left and right banks
Design riverbed
Existing riverbed
Tabulated quantity of Items of Works involved

Reviewed by:
Position:
Date:

Concurred by:
Position:
Date: