1) 8% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN ONLY)
- CONTRACT DOCUMENTS AND DRAWINGS
- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS
-COLORED PERSPECTIVES OF MAJOR AREAS SUCH AS EXTERIOR, INTERIORS OF
LIVING, DINING, KITCHEN,BEDROOMS, DINING AND OTHER IMPORTANT AREAS.
-STRUCTURAL
-ELECTRICAL
-SANITARY
- SITE SUPERVISION
- 6-8 TIMES SITE VISIT TO CHECK IF THE DESIGN IS BEING IMPLEMENTED
(CRITICAL STAGES)
2) 6.5% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN AND
CONSTRUCTION)
- CONTRACT DOCUMENTS AND DRAWINGS
- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS
-COLORED PERSPECTIVES OF MAJOR AREAS SUCH AS EXTERIOR, INTERIORS OF
LIVING, DINING, KITCHEN,BEDROOMS, DINING AND OTHER IMPORTANT AREAS.
-STRUCTURAL
-ELECTRICAL
-SANITARY
- SITE SUPERVISION
- SUPERVISE THE WHOLE CONSTRUCTION PERIOD (1-2 TIMES A WEEK)
3) 5% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN AND
CONSTRUCTION)
- CONTRACT DOCUMENTS AND DRAWINGS
- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS (FOR BUILDING PREMIT ONLY)
- LESS DETAILED DRAWINGS
- BLACK AND WHITE
-STRUCTURAL
-STRUCTURAL COMPUTAION
-ELECTRICAL
-ELECTRICAL LOAD ANALYSIS
-SANITARY