Professional Documents
Culture Documents
TVET Program
Pissa Campus
Hardware and Networking Service
Level-III
2016 E.C First Semester Final Exam
Competency covered:
Preventing and Eliminating MUDA.
Choose the best answer from the given alternatives and write the answer on the space
provided
A. In employee handbooks
B. On company websites
C. In job postings
D. In training manuals
5. What is the first step in reading and interpreting job specifications? A. Identify the key
requirements.
6. What should you do if certain aspects of the job specifications are unclear?
C. A.sk the hiring manager or HR representative for clarification. D. A.ssume they are not important
and focus on other parts of the job posting.
11. What is the Japanese term for "waste" in the context of Lean manufacturing?
13. What is the main benefit of value stream mapping in identifying muda? A. It reduces costs.
14. Which Lean principle focuses on developing standardized procedures for tasks?
17. A.ccording to the study mentioned, what average cost reduction did businesses achieve
through Lean implementation?
9. Which of the following is NOT a recommended method for identifying muda? A. Value
stream mapping
B. Gemba walks
D. Employee feedback
20. What is the overall importance of identifying and eliminating muda in a business?
23. Which technique involves asking "why?" five times to identify the root cause of a
problem?
A. Cause-and-effect analysis
B. Brainstorming
C. Five whys
D. Root cause analysis
24. When developing solutions, what factor should be considered in terms of its negative
consequences?
A. The cost of the solution
B. The feasibility of the solution
C. The impact of the solution
D. The effectiveness of the solution
25. What is the goal of Value Stream Mapping (VSM. in lean manufacturing?
A. Increase waste in a process
B. Identify and eliminate waste in a process
C. Develop a plan to create waste
D. Visualize a problem in a process
26. Which step in the 5S methodology involves cleaning everything up?
A. Seiri (sort.
B. Seiton (set in order.
C. Seiso (shine.
D. Seiketsu (standardize.
27. What is the central idea of Kaizen?
A. Implementing large, one-time changes
B. Continuous improvement through small, incremental changes
C. Maintaining the status quo
D. Ignoring problems until they become critical
28. Who typically conducts Gemba walks?
A. Customers
B. Managers and supervisors
C. Employees
D. External consultants
29. What is the primary goal of a Gemba walk?
A. Increase employee workload
B. Identify areas where waste is occurring
C. Blame employees for inefficiencies
D. Create a plan to add more steps to a process
30. Why is employee feedback considered valuable in identifying waste?
A. Employees are experts in Lean methodology
B. Employees are always right about process inefficiencies
C. Employees are the ones doing the work and have firsthand knowledge
D. Employee feedback is the cheapest method of problem identification
GAGE University College
Hardware and Networking Service
Level-III
2016 E.C First Semester Final Exam
Time allowed 1 Hr.
Answer Sheet
Name__________________________ID__________________
1.______ 11.______ 21._______
2.______ 12.______ 22._______
3.______ 13.______ 23._______
4.______ 14.______ 24._______
5.______ 15.______ 25._______
6.______ 16.______ 26._______
7.______ 17.______ 27._______
8.______ 18.______ 28._______
9.______ 19.______ 29._______
10______ 20.______ 30._______