You are on page 1of 9

KWH

B ACPDB
C
GRAVEL

G
+0.50

LE
-4
M
35
A D

Akses Road ±0.00


SST 35M 4 LEG SST 35M 4 LEG

Vertical Cable Tray 20 CM Vertical Cable Tray 20 CM

POLE ACTUAL PLAN POLE ACTUAL PLAN


Triangel Keylock

GENE RAL C ONT RACT OR CME &E LEK TRI CA L


SY STE M ENGINE ERI NG
B C

A D

ANTENNA PROPOSED
SECTORAL-4
AZIMUTH -
ELV. +15.00M

A B C D
KWH

B C

A D

Akses Road ±0.00


CONNECTION VIEW (F)
(NTS)

E E

E
E

E E

You might also like