You are on page 1of 1

25

D16
25
O 8 - 15 Sloof 25/45 D16
Plat Baja t=8mm
3 - D 10 mm
O 8 - 15
A

4
15 15 15 15 15 15 25
4 - D 10 mm
2 - D12 D 10mm 25 O 8 - 10 mm

4
3 - D 10 mm
2 - D12 4 4
Muka Tanah - 0.30 1

45

45
O 8 - 150 25
O 8 mm - 10 cm
2 - D12
1.50
SECTION 1-1
2 - D12
B O 8 mm - 10 cm
S ALA 1 3

SECTION A-A
S ALA 1 3 D 10mm
Tanah Urug

1.20

2.00
O 8 mm - 15 cm

25 3 - D 10 mm
5 - D12
2

4
25 O 8 - 10 mm
2 - D12

4
3 - D 10 mm

45
O 8 - 150 4 4

25

5 - D12

SECTION 2-2

40
Tapak
40 x 1.20 x 1.20
SECTION B-B 6.00 3.00 D 10mm S ALA 1 3
10
S ALA 1 3
1.20 LANTAI KERJA t = 10 cm
O 8 mm - 15 cm

3 - D 10 mm
CONCRETE PILE

4
25 cm x 25 cm 4 - D 10 mm
25 O 8 - 10 mm

4
3 - D 10 mm
16 - 15

O 8 mm - 10 cm 4 4

25
120
SECTION 3-3
D 10mm
1.50 S ALA 1 3
16 - 15

DETAIL PEMBESIAN PONDASI(P.1) 3


S ALA 1 2
Plat Baja t = 8mm
120

DENAH PENULANGAN PONDASI(P.1) DETAIL TIANG PANCANG/FILLE


S ALA 1 3
S ALA 1 2

You might also like