You are on page 1of 4

CEEQ-IMSF-60/D:01-04-23/R:00

CRESCENT ELEVATORS & ESCALATORS TRADING CO. LLC.,

QA INSPECTION CHECK LIST FOR TRACTION WITH M / C ROOM

JOB NO

PROJECT NAME

LOCATION

PROJECT ENGINEER

QA INSPECTOR

DATE

STAGE - 2
COMPLETION
SL.NO CAR & COUNTER FRAME ASSEMBLY INSP RE - INSP
DATE
1 Car sling in level
All car sling appropriate bolts, nuts tightened with TW + PW
2
+ SW
3 Progressive safety block assy clearance

4 Car frame fixed with centre of guide rail

5 Synchronize rod fixed correctly

6 Safety lever bracket pulling position

7 Each car shoe play is 1mm (+ 0mm, - 0mm)

8 Cwt shoe fixed and each shoe play is 1mm (+ 0mm, - 0mm)

9 Counter frame fixed with centre of guide rail

ROPING & CABIN ASSEMBLY

1 Rope anchorage bolts lock nut / split pin provided

2 Rope ends properly tied with cotton tapes

3 Rope turning position in 2 : 1 roping

4 Rope cut out covered properly

5 Rope tension is correct

6 Brake plunger lock nut provisions

7 Anchorage bolt position & hitch plate position

8 Rope clip position & all clips fixed in all ropes


Rope guard fixed with minimum gap for car & cwt sling
9
pulley & machine sheave
10 Platform in level

Page 1 of 4
CEEQ-IMSF-60/D:01-04-23/R:00

11 Fixing of vibrating rubber is correct in platform

12 All bolts in cabin tightened

13 Squareness of cabin & platform corner

14 Cabin panel to panel flushness is correct

15 Car steady brackets were fixed without plum out

16 Vibrating rubber pads were provided in steady clamp

17 Gap is available in between rope clips

18 Ceiling fixed properly

19 TLS cam plumbness is correct

20 Limit switches fixed with 10mm clearance to ramp angle

21 Limit Switch roller centre is matched with TLS cam

22 Fixing of limit bracket is correct & properly tightened

23 Bottom of door to sill clearance 4mm (+ 1mm, - 0mm)

24 Door to frame clearance 4mm (+ 1mm, - 0mm)

25 All door bearing bolts tightened with free door movements


Landing toe guard fixed & arrested properly, plumbness is
26
correct
27 Car door centre and landing door centre matched

28 Noise level of door spring

29 Landing doors fixed properly

30 Door frame side & top plastering

31 Car door unit plumbness is correct

32 Centre of car track & centre of car sill is matched

OSG ASSEMBLY

1 OSG fixed without any shake and in level

2 Rope cutout covered properly

3 Rope cut outs made for using test groove

4 Rope clips properly fixed

5 Rope not touching the cutouts

6 OSG guard fixed properly

7 OSG location is matched with connecting plate

8 OSG tension weight fixed without obstruction


OSG tension weight have 200mm clearance from pit flooring
9
level
CONTROLLER ASSEMBLY

Page 2 of 4
CEEQ-IMSF-60/D:01-04-23/R:00

1 Controller fixed, straight and without shake

2 Fixing of controller & ARD with out obstacles

3 Controller trunking inlet straightness

4 Trunking joints done properly

5 Fixing of trunking covers with out shake

6 Controller flexible pipes done properly with correct glands

7 Condition of controller lockable arrangements

8 Spare holes closed

9 ARD fixed with out any shake

10 ARD flexible pipes done properly with correct gland

BUFFER ASSEMBLY

1 Buffer spring fixed properly with B + N + SW

2 Oil buffer fixed and oil poured up to level

3 Buffer is properly seated and fixed with buffer block

4 Buffer block constructed with out shake

5 Buffer position is correct

WIRINGS

1 Main switch wiring completed

2 Controller wiring completed

3 Machine and brake wiring completed

4 Limit switches in lift shaft wiring

5 Landing gate lock wiring completed

6 Appropriate lugs were provided in all field wires

7 FMS wiring completed

8 HOP & COP wiring completed

9 Car top wiring completed

10 50mm to 100mm gap is provided in between cables

11 Travelling cable & cable bracket is fixed with proper location


OSG safety switch & tension weight safety switch wiring
12
completed
13 ARD wiring completed

CLEANING

1 Machine room equipment cleaning

2 Shaft equipment cleaning

3 Car top cleaning

Page 3 of 4
CEEQ-IMSF-60/D:01-04-23/R:00

4 Repainting of equipment

5 Pit cleaning

QA INSPECTOR SIGNATURE QA ENGINEER SIGNATURE


Remarks concern with customer
1
2
3
4
5
6

Remarks concern with CEEQ


1
2
3
4
5
6

Page 4 of 4