You are on page 1of 3

KSK AND PARTNERS SDN BHD SECTION 2A : EMERGENCY DEPARTMENT AND UNIT HASIL

Item Description Unit Qty Rate (RM) Amount (RM)

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR


LEVEL

Allow for making good existing ground slab and ready to


receive new works

A To ground slab Sum

New works

B Excavate oversite to reduce level average 150mm deep m3 194


and remove surplus excavated material, deposit and spread
in making up level where directed and remainder load and
cart away from site

Excavate commencing from the lowest basement platform


level, get out, part return, fill in , ram , deposit and spread in
making up levels where directed within the site, remainder
load and cart to Contractor's own dump

C Excavate pit for footing; maximum depth not exceeding m3 415


4.00m deep

D Excavate trench for ground beam not exceeding 2.0m deep m3 66


commencing from formation level

50mm thick lean concrete Grade 15 as described :-

E Pad footing m3 14

F Ground beam m3 7

G Ground floor slab m3 41

Vibrated reinforced concrete Grade C30/37 as described in :-

H Pad footing m3 103

J Column stump m3 48

K Ground beam m3 60

L Ground floor slab; 150mm thick m3 145

Steel bar reinforcement as described :-

Pad footing

M In various diameter kg 28,840

To collection RM -

NAIKTARAF JABATAN PERUBATAN KECEMASAN


1/1 BINA)
HOSPITAL CANSELOR TUANKU MUHRIZ, PPUKM (REKA DAN
Item Description Unit Qty Rate (RM) Amount (RM)

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR


LEVEL (CONT'D)

Steel bar reinforcement as described :- (Cont'd)

Column Stump

A In various diameter kg 12,000

Ground beams

B In various diameter kg 12,000

Ground Slab; 150mm thick

C In various diameter kg 32,808

Steel fabric reinforcement to B.S 4483 or B.S 1221A as


described;-

D In ground slab m2 1,256

Sawn formwork as described :-

E Sides of pad footing m2 432

F Sides of column stump m2 280

G To sides of ground beam m2 419

H Ditto; ground floor slab ; 150mm thick m 163

Anti Termite

Allow for the application of anti-termite treatment to all


building area as required; all in accordance with approved
practices to:-

J Ground slab m2 1,256

K Apron slab m2 380

Prepare and apply approved waterproofing system or other


equivalent to horizontal and vertical areas all accordance to
manufacturer's instruction

L To ground slab m2 806

To collection RM -
KSK AND PARTNERS SDN BHD SECTION 2A : EMERGENCY DEPARTMENT AND UNIT HASIL

Item Description Unit Qty Rate (RM) Amount (RM)

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR


LEVEL (CONT'D)

COLLECTION PAGE ;

Page 1/1 -

Page 1/2 -

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR LEVEL


RM -
(Carried to Summary)

NAIKTARAF JABATAN PERUBATAN KECEMASAN


1/3 BINA)
HOSPITAL CANSELOR TUANKU MUHRIZ, PPUKM (REKA DAN