DAFTAR UPAH

PROYEK : KLINIK JL GARUDA MINGGU : 29


PERIODE : : 08 - 14 September 2023 08-Sep 09-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep
NO USER JUM'AT SABTU MINGGU SENIN SELASA RABU KAMIS JUMLAH UPAH JUMLAH
NO JBT NAMA TOTAL
KTP/SIM ID HR L HR L HR L HR L HR L HR L HR L HR L HARIAN LEMBUR HARIAN L
1 MDR 3205171010760007 HEDI 1 2 1 1 2 1 2 1 2 1 2 6 10 150.000 22.000 900.000 220.000 1.120.000
2 WK. MD 320572107790003 HENDAR 1 2 1 1 1 2 1 2 1 2 1 2 7 10 130.000 18.600 910.000 186.000 1.096.000
3 TKG.BESI 3205171606960002 YAN YAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
4 GALI 3214061203900006 EMEN 1 2 1 1 2 1 2 1 2 1 2 6 10 100.000 14.300 600.000 143.000 743.000
5 GALI 3205021006970002 ANDRIANSYAH 1 2 1 1 1 2 1 2 1 2 1 2 7 10 100.000 14.300 700.000 143.000 843.000
6 LADEN 327305907930005 ERVIAN RIGYA SETIA 1 2 1 1 1 2 1 2 1 2 1 2 7 10 95.000 13.600 665.000 136.000 801.000
7 TKG.BATU 3205100808770009 DIDIN A 0 0 120.000 17.200 - - -
8 TKG.BESI 3205070406800007 DIDIN B 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
9 GALI 3205020101820073 Ahmad JANGKUNG 1 2 1 1 1 2 1 2 1 2 1 2 7 10 100.000 14.300 700.000 143.000 843.000
10 TKG.BESI 3205171710980003 WANDI SETIWAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
11 TKG.BATU 3205130404840001 A. HERI HOERUDIN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 100.000 14.300 700.000 143.000 843.000
12 TKG.BATU 3205110211690001 Ahmad UBAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
13 TKG.BATU 3205131507760002 SUHERMAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
14 LADEN 3273161102840004 ARDIANSYAH 1 2 1 1 1 2 1 2 1 2 1 2 7 10 95.000 13.600 665.000 136.000 801.000
15 LADEN 3273052108610003 IYUS RUSMANA 1 2 1 1 1 2 1 2 1 2 1 2 7 10 95.000 13.600 665.000 136.000 801.000
16 TKG.BATU 3205140106860006 ADIT ADIANSAH 1 2 1 1 2 1 2 1 2 1 2 6 10 120.000 17.200 720.000 172.000 892.000
17 GALI 3205022005030006 RIKI ASMANDAR 1 2 1 1 1 2 1 2 1 2 1 2 7 10 100.000 14.300 700.000 143.000 843.000
18 TKG.BATU 3204312808790003 TONO SUJASNO 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
19 GALI 3205022601060007 M. ROFI RAHMAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 100.000 14.300 700.000 143.000 843.000
20 TKG.BATU 3273211202670004 HAENUDIN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
21 TKG.BATU 3205331111710000 SUPARMAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
22 TKG.BATU 3205110409790004 ADE SOPYAN 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
23 TKG.BATU 3205331008730002 AGUS SUBAGJA 1 2 1 1 1 2 1 2 1 2 1 2 7 10 120.000 17.200 840.000 172.000 1.012.000
24 LADEN 3205332206700002 WAWAN S 1 2 1 1 1 2 1 2 1 2 1 2 7 10 95.000 13.600 665.000 136.000 801.000
25 LADEN 3205130510050001 RONI R 1 2 1 1 1 2 1 2 1 2 1 2 7 10 95.000 13.600 665.000 136.000 801.000
26 LADEN 3205332206700002 ANDI RUKANDI 1 1 2 1 2 1 2 1 2 5 8 95.000 13.600 475.000 108.800 583.800
27 TKG.BATU 3205331008730002 TEDI SUPRIADI 1 2 1 2 1 2 1 2 4 8 120.000 17.200 480.000 137.600 617.600
JUMLAH 24 48 24 0 22 0 26 52 26 52 26 52 26 52 174 256 JUMLAH 19.310.000 4.082.400 23.392.400

Bandung , 15 September 2023 Diperiksa Oleh , Mengetahui :

(ADJUN) ( KRISTIAN )
Admin Pelaksana Project Manager

CATATAN :

(PEKERJAAN PASANGAN BATA, PLESTERAN DINDING, PEMASANGAN KERAMIK KAMAR MANDI, PASANG GLASSBLCOK)