REPUBLIC OF THE PHILIPPINES

PROVINCE OF NORTHERN SAMAR


MUNICIPALITY OF ALLEN

DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT


KALAHI - CIDSS NCDDP
ACT - ALLEN

REHABILITATION OF BARANGAY ROAD


AS - PLAN

BRGY. KINAGUITMAN, ALLEN, NORTHERN SAMAR

DETAILED ENGINEERING DESIGN

PREPARED BY: RECOMMEDNDING APPROVED BY: CONCURRED BY: NOTED BY:


APPROVAL:

ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR.
ACT - TECHNICAL FACILITATOR MUNICIPAL ENGINEER BDC - TWG CHAIRPERSON PUNONG BARANGAY PDO IV - ENGINEERING UNIT
P A C I F I C O C E A N

N
BIRI

T
E
E
R
T
S
O
I N
D
LAOANG

R
A
PAMBUJAN

N
PALAPAG

R
CATARMAN

E
LAVEZARES
SAN JOSE

B
BOBON MONDRAGON SAN ROQUE
ALLEN ROSARIO

N
A
MAPANAS

S
VICTORIA

CAPUL
N SAN ANTONIO
CATUBIG

SAN ISIDRO GAMAY


A MAP OF NORTHERN SAMAR
1 3 SCALE NTS

LAS NAVAS
LAPINIG
SILVINO LUBOS
LOPE DE VEGA

SAN VICENTE

TO BRGY.
EVACUATION TO BRGY. VICTORIA
VICTORIA
CENTER TO BRGY.
BARANGAY SANTA RITA
HALL
SEA
START OF SP END OF SP

POBLA
STA 0+000 STA 0+040
THIS SITE TO Brgy. Hall
TO PUROK 4

CION -
(Purok 6)
POBLA

SEA

BRGY.
ELEMENTARY
CION -

SCHOOL TO MAIN ROAD ELEMENTARY

CABAC
BRGY.

TO MAIN ROAD
SCHOOL
CABAC

UNGAN
UNGAN

SEA

RD.
RD.

SEA TO BRGY. LAGUNDI


PROPOSED SUB-PROJECT LENGTH: 40 meters
TO BRGY. A VICINITY MAP A SITE DEVELOPMENT PLAN
LAGUNDI 2 3 SCALE NTS
3 3 SCALE NTS

SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY MAP OF N. SAMAR
A1
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. VICINITY MAP
KALAHI CIDSS - NCDDP ROAD SITE DEVELOPMENT PLAN
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
1 5
VARIES

16mm Ø TRASVERSE
BARS ,
600mm IN LENGTH
SPACE AT 300mm VARIES
B

2.50 METER
PROPOSED CONCRETE PAVEMENT

5.00 METER
2.50 METER
PROPOSED CONCRETE PAVEMENT

(Sta. 0 + 000 to Sta. 0 + 040) 16MM DIAMETER


LONGITUDINAL BARS
A2 ROAN PLAN (TOP VIEW) SPACE AT 600MM ON
1 2 SCALE NTS
CENTER
START OF SP END OF SP
STA 0+000 STA 0+040

3
2
1
0
FINISH BOTTOM -1
LINE OF CANAL
-2
-3

TOP OF PCCP 0.450 0.750 1.100 1.200


NGL 0.250 0.550 0.900 1.000

STA. 0+000 STA. 0+010 STA. 0+020 STA. 0+30 STA. 0+040

(STA. 0+000 - STA. 0+040)

A2 STRAIGHT LINE DIAGRAM AND ROAD PROFILE TOP OF PCCP


2 2 SCALE: NTS NATURAL GRADE LINE

SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY ROAD PLAN TOP VIEW A2
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR.
KALAHI CIDSS - NCDDP ROAD STRAIGHT LINE DIAGRAM
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
AND ROAD PROFILE 2 5
C
L
16mm Ø RSB, 600mm IN LENGTH
SPACE AT 300mm EVERY 4 meter
OF CONCRETE PAVEMENT
5.0 m

0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m
0.25m 0.25m
2.0 % 2.0 %

0.10m 0.20 m
NGL NGL
EXISTING/OLD PCCP
EXISTING UNDISTURBED SOIL

(Sta. 0 + 000 to Sta. 0 + 040)

A2 CROSS SECTION (SECTION B)


1 1 SCALE NTS

VARIES

16mm Ø RSB, 600mm IN LENGTH


SPACE AT 300mm EVERY
Every 4 meters PROSPECTIVE LENGTH THAT
NEEDS DOWEL/CUT - OFF
CONCRETE PAVEMENT
JOINT (4 METERS)

0.20 m
100mm THICK EXISTING/OLD PCCP
EXISTING UNDISTURBED SOIL
(Sta. 0 + 000 to Sta. 0 + 040)
A2 LONGITUDINAL SECTION (SECTION A)
1 2 SCALE NTS

SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY A3
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. LONGITUDINAL SECTION (A)
KALAHI CIDSS - NCDDP ROAD CROSS SECTION (B)
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
3 5
Republic of the Philippines
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT (DSWD)
Kapit Bisig Laban sa Kahirapan
Comprehensive and Integrated delivery of Social Services

COMMUNITY SUB-PROJECT
Sub-Project Location: Barangay Kinaguitman, Allen, N. Samar
Basic Information:
Sub-Project Title : REHABILITATION OF BARANGAY ROAD

Total Sub-project Cost : PHP 384,726.00


KALAHI CIDSS GRANT : PHP 381,351.00
BLGU Contribution : PHP 3,375.00

Sub- Project Duration : 19 WORKING DAYS


Target Date of Completion : _________________
Actual Started Date : ________________

SUB-PROJECT SIGNBOARD MADE BY TARPULINE PERSPECTIVE

5 FT

Republic of the Philippines 2" ARIEL FONT SIZE TEXT


DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT (DSWD) 3" ARIEL FONT SIZE TEXT
Kapit Bisig Laban sa Kahirapan 2 1/2" ARIEL FONT SIZE TEXT
Comprehensive and Integrated delivery of Social Services 2 1/2" ARIEL FONT SIZE TEXT
2" ARIEL FONT SIZE TEXT
COMMUNITY SUB-PROJECT
4" ARIEL FONT SIZE TEXT
Sub-Project Location: Barangay Kinaguitman , Allen, N. Samar
4" ARIEL FONT SIZE TEXT
Basic Information:

3 FT
Sub-Project Title : REHABILITATION OF BARANGAY ROAD 2" SEGEO SCRIPT SIZE TEXT
Total Sub-project Cost : PHP 384,726.00 1 1/5" ARIEL FONT SIZE TEXT
KALAHI CIDSS GRANT : PHP 381,351.00
BLGU Contribution : PHP 3,375.00
Sub- Project Duration : 19 WORKING DAYS 1 1/5" ARIEL FONT SIZE TEXT
Target Date of Completion : _________________
Actual Started Date : ________________

TEXT SIZE DETAILS

SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY PROJECT BILLBOARD
A4
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. BILLBOARD DETAILS
KALAHI CIDSS - NCDDP ROAD BILLBOARD PERSPECTIVE
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit TEXT SIZE DETAILS 4 5
ISOMETRIC

PERSPECTIVE

SUB - PROJECT MARKER DETAILS


SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY PERSPECTIVE
SUB-PROJECT MARKER A5
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR.
KALAHI CIDSS - NCDDP ROAD ISOMETRIC
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
DETAILS 5 5