Professional Documents
Culture Documents
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR.
ACT - TECHNICAL FACILITATOR MUNICIPAL ENGINEER BDC - TWG CHAIRPERSON PUNONG BARANGAY PDO IV - ENGINEERING UNIT
P A C I F I C O C E A N
N
BIRI
T
E
E
R
T
S
O
I N
D
LAOANG
R
A
PAMBUJAN
N
PALAPAG
R
CATARMAN
E
LAVEZARES
SAN JOSE
B
BOBON MONDRAGON SAN ROQUE
ALLEN ROSARIO
N
A
MAPANAS
S
VICTORIA
CAPUL
N SAN ANTONIO
CATUBIG
LAS NAVAS
LAPINIG
SILVINO LUBOS
LOPE DE VEGA
SAN VICENTE
TO BRGY.
EVACUATION TO BRGY. VICTORIA
VICTORIA
CENTER TO BRGY.
BARANGAY SANTA RITA
HALL
SEA
START OF SP END OF SP
POBLA
STA 0+000 STA 0+040
THIS SITE TO Brgy. Hall
TO PUROK 4
CION -
(Purok 6)
POBLA
SEA
BRGY.
ELEMENTARY
CION -
CABAC
BRGY.
TO MAIN ROAD
SCHOOL
CABAC
UNGAN
UNGAN
SEA
RD.
RD.
SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY MAP OF N. SAMAR
A1
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. VICINITY MAP
KALAHI CIDSS - NCDDP ROAD SITE DEVELOPMENT PLAN
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
1 5
VARIES
16mm Ø TRASVERSE
BARS ,
600mm IN LENGTH
SPACE AT 300mm VARIES
B
2.50 METER
PROPOSED CONCRETE PAVEMENT
5.00 METER
2.50 METER
PROPOSED CONCRETE PAVEMENT
3
2
1
0
FINISH BOTTOM -1
LINE OF CANAL
-2
-3
STA. 0+000 STA. 0+010 STA. 0+020 STA. 0+30 STA. 0+040
SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY ROAD PLAN TOP VIEW A2
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR.
KALAHI CIDSS - NCDDP ROAD STRAIGHT LINE DIAGRAM
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
AND ROAD PROFILE 2 5
C
L
16mm Ø RSB, 600mm IN LENGTH
SPACE AT 300mm EVERY 4 meter
OF CONCRETE PAVEMENT
5.0 m
0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m 0.30m
0.25m 0.25m
2.0 % 2.0 %
0.10m 0.20 m
NGL NGL
EXISTING/OLD PCCP
EXISTING UNDISTURBED SOIL
VARIES
0.20 m
100mm THICK EXISTING/OLD PCCP
EXISTING UNDISTURBED SOIL
(Sta. 0 + 000 to Sta. 0 + 040)
A2 LONGITUDINAL SECTION (SECTION A)
1 2 SCALE NTS
SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY A3
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. LONGITUDINAL SECTION (A)
KALAHI CIDSS - NCDDP ROAD CROSS SECTION (B)
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit
3 5
Republic of the Philippines
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT (DSWD)
Kapit Bisig Laban sa Kahirapan
Comprehensive and Integrated delivery of Social Services
COMMUNITY SUB-PROJECT
Sub-Project Location: Barangay Kinaguitman, Allen, N. Samar
Basic Information:
Sub-Project Title : REHABILITATION OF BARANGAY ROAD
5 FT
3 FT
Sub-Project Title : REHABILITATION OF BARANGAY ROAD 2" SEGEO SCRIPT SIZE TEXT
Total Sub-project Cost : PHP 384,726.00 1 1/5" ARIEL FONT SIZE TEXT
KALAHI CIDSS GRANT : PHP 381,351.00
BLGU Contribution : PHP 3,375.00
Sub- Project Duration : 19 WORKING DAYS 1 1/5" ARIEL FONT SIZE TEXT
Target Date of Completion : _________________
Actual Started Date : ________________
SP TITLE (AS - PLAN): PREPARED BY: RECOMMENDING APPROVAL BY: APPROVED BY: CONCURRED BY: NOTED BY: SHEET CONTENT: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF SOCIAL WELFARE AND
DEVELOPMENT REHABILITATION OF BARANGAY PROJECT BILLBOARD
A4
ENGR. GERALDINE A. GALING ENGR. EDMUNDO O. MENDOZA CANDELARIA G. FLORALDE HON. ALFONSO M. RARERA JR. BILLBOARD DETAILS
KALAHI CIDSS - NCDDP ROAD BILLBOARD PERSPECTIVE
ADDITIONAL FINANCING LOCATION: BRGY. KINAGUITMAN, ALLEN, N. SAMAR ACT - Technical Facilitator Municipal Engineer BDC-TWG Chairperson Punong Barangay Project Development Officer IV, Engineering Unit TEXT SIZE DETAILS 4 5
ISOMETRIC
PERSPECTIVE