Using Computer in Planning, Analysis, and Control – MPD445 Semester 232 Lab No. 6:
Project planning and performance analysis
Student Name: ‫احمد عبدالحميد محمد عوض قنديل‬ Student No.: 12

Exercise #1:
Consider the following set of activities:

a) Draw the CPM network for this problem.


b) Create a spreadsheet to calculate and summarize the earliest and latest start and
finish times, the slack for each activity, and the critical activities.
c) What is the earliest time that the project can be completed?
d) Use Microsoft Project to verify the critical path for this project.

Solution
Dr. Sayed Ali Zayan 1
Faculty of Engineering at Shoubra 4th year Production (Design) Using Computer in Planning,
Analysis, and Control – MPD445 Semester 232
Exercise #2:
Aerobatic, Inc. custom designs and manufactures light aircraft. The activities involved
in this process are summarized in the following table.

a) Draw the activity network for this problem.


b) Create a spreadsheet to calculate and summarize the earliest and latest start and
finish times, the slack for each activity, and the critical activities.
c) What is the earliest this project can be finished?
d) Use Microsoft Project to verify the critical path for this project.