Professional Documents
Culture Documents
主题
VNX2 其他过程
选择
VNX2 其他过程: 开机/关机过程
系统开机/关机过程: 5200、5400、5600、5800、7600 供电过程
VNX2 关机/开机(VNX8000 除外): 块开机过程
报告问题
如果您在此流程中发现任何错误或对此应用程序有相关意见,请发送电子邮件至 SolVeFeedback@dell.com
使用、复制及分发本出版物中描述的任何软件需要相应的软件许可证。
本文档可能包含某些与戴尔当前语言指导准则不一致的词语。戴尔计划在后续版本中更新文档,以相应地修
改这些词语。
本文档可能包含来自第三方内容的语言,这些内容不受戴尔控制,并且与戴尔当前针对其自身内容的准则不一致
。如果相关的第三方更新此类第三方内容,本文档将进行相应修改。
Page 1 of 5
目录
初步活动任务......................................................................................................................3
阅读、理解并执行以下任务...........................................................................................................................3
VNX 5200, 5400, 5600, 5800, 7600 Block System Power Up ................................................4
VNX 5200, 5400, 5600, 5800, 7600 Block system power up........................................................................4
Page 2 of 5
初步活动任务
此部分可能包含您在执行此流程之前必须完成的任务。
阅读、理解并执行以下任务
Table 1 表 1 与此活动相关的注意事项、警告、备注和/或知识库解决方案的列表
2. 这是指向热门服务主题的链接。这些主题可能与此活动相关,也可能无关。这只是一次主动尝试,目的
是让您了解可能与本产品相关的所有知识库文章。
注:在任何给定时间,此产品都可能没有热门服务主题。
Page 3 of 5
VNX 5200, 5400, 5600, 5800, 7600 Block System Power Up
Complete the following procedure to safely perform a planned power up of your VNX 5200, 5400, 5600,
5800, 7600 Block system.
Note: As part of a robust disaster recovery plan, it is recommended that you test the planned power down
and power up of your VNX prior to an event necessitating these actions. Print off and follow this
procedure to test the power up process on your VNX.
Note: If you performed an emergency power down of your VNX system, review the planned power down
procedure and ensure that you prepare the VNX for power up by disconnecting the necessary VNX
components from rack power, as described in the planned power down procedure for your VNX model,
before beginning this power up procedure.
Follow the instructions below for your VNX 5200, 5400, 5600, 5800, 7600 for Block system:
1. [ ] Verify that the master switch/circuit breakers for each cabinet power strip are ON.
2. [ ] Verify that the power cable for each DPE power supply (PS A and PS B) is not connected to the
cabinet power strips.
3. [ ] Verify that the power cables for any additional DAEs are plugged into the appropriate cabinet
power strips on either side of the rack in a manner ensuring high availability and the power cable
retention bails are in place.
4. [ ] Power on the disk processor enclosure (DPE) and boot the VNX OE for Block by connecting the
power supply power cords for PS A and PS B to the cabinet power strips in a manner ensuring high
availability and the ensure the power cable retention bails are in place.
5. [ ] Wait 10 minutes for the storage processors to boot. Use the front LEDs to verify the boot status
of the DPE. When booted, the
power LED on each SP will be lit steady green
enclosure power LED will be lit steady blue
Page 4 of 5
The storage system can take 10-12 minutes to complete a typical power up. Fault LEDs flash amber
during BIOS and the power on self-test (POST), flash blue as the operating system boots, then turn
off. The front fault LED and other storage array LEDs commonly stay on for several minutes while the
system batteries are charging.
Note: If amber LEDs on the front or back of the storage system remain on for more than 10 minutes,
ensure that the system is correctly cabled, and then refer to the Troubleshooting Trees on the EMC
Support page for the storage system. If you cannot determine any reasons for the fault, contact your
authorized service provider.