- PEDIDO REPLANTEO(AC) -

SI
FASE INTERNA(B) = ORANGE RADIO;
AND
PO01_NUM PO(EI) = No. po
AND
PO01_ITEM(EK) =SD- Technical Site Survey and Output Survey report according to
Huawei requirement for wireless site only ( TSS Includes Completed Site Survey
Template, site visit included);
Ó
SI FASE INTERNA (B) = VDF RADIO;
AND
PO01_NUM PO(EI) = No. po
AND
PO01_ITEM(EK) =SD- Technical Site Survey and Output Survey report according to
Huawei requirement for wireless site only ( TSS Includes Completed Site Survey
Template, site visit included)
Ó SI
FASE INTERNA (B) = VDF RADIO;
PO01_NUM PO(EI) = No. po
AND
PO01_ITEM(EK) =SD- Basic Package VDF Site Engineering Design Part 1-1;
Ó SI
FASE INTERNA(B) = ORANGE VANOS;
PO01_NUM PO(EI) = No. PO;
PO01_ITEM(EK)=SD- Technical Site Survey and Output Survey report according to
Huawei requirement for MW site only (TSS Includes Completed Site Survey Template,
Site visit included);
ENTONCES
"PO OK"; SINO; "PDTE. PO"

- PEDIDO ADIC. REPLANTEO -


SI
FASE INTERNA(B) = ORANGE RADIO
Ó
VDF RADIO Y ESTADO REPLANTEO (AM) = PTE. 2º VISITA;
PO04_NUM PO(GH) = No. po Y PO04_ITEM(GJ) = SD- Additional Site Survey to
include new technology. Including required visits;
Ó
SI FASE INTERNA = ORANGE VANOS Y ESTADO REPLANTEO (AM) = PTE. 2ª VISITA;
PO04_NUM PO(GH) = No. po Y PO04_ITEM(GJ) = SD- Additional Site Survey to
include new technology. Including required visits;
Ó
SI PO05_NUM PO(GY) = No. po
AND
PO05_ITEM(HA) = SD- Additional Site Survey to include new technology. Including
required visits;
ENTONCES:
"PO OK"; SINO "PDTE. PO"

- PEDIDO AR -
SI
FASE INTERNA (B) = ORANGE RADIO
AND
PROPIETARIO(X) = ORANGE;
PO01_NUM PO(EI) = No. po
PO01_ITEM(EK) =SD- Technical Site Survey and Output Survey report according to
Huawei requirement for wireless site only ( TSS Includes Completed Site Survey
Template, site visit included)
AND
PO06_NUM PO(HP) = No. po Y PO06_ITEM(HR) = SD- Site Assesment for OSP Site with
Power measurement - associated to Site Survey
Ó
PO06_ITEM(HR) = SD- Site Assesment for OSP Site with Power measurement -
associated to Site Survey
Y PO07_NUM PO(IG) = No. po Y PO07_ITEM(II)= SD- Additional Site Survey to
TILTs;
ENTONCES:
"PO´S OK"; SINO
SI FASE INTERNA (B) = ORANGE RADIO
AND
PROPIETARIO(X) NO = ORANGE;
PO01_NUM PO(EI) = No. po
AND
PO01_ITEM(EK) =SD- Technical Site Survey and Output Survey report
according to Huawei requirement for wireless site only ( TSS Includes Completed
Site Survey Template, site visit included)
AND
PO07_NUM PO(IG) = No. po Y PO07_ITEM(II)= SD- Additional Site
Survey to TILTs;
ENTONCES:
"PO´S OK";SINO " PTE PO. ASOCIADO;
SINO
SI FASE INTERNA (B) = VDF RADIO;
PO01_NUM PO(EI) = No. po
PO01_ITEM(EK) =SD- Technical Site Survey and Output Survey report according to
Huawei requirement for wireless site only ( TSS Includes Completed Site Survey
Template, site visit included)
Ó
SI FASE INTERNA (B) = VDF RADIO;
PO01_NUM PO(EI) = No. po
PO01_ITEM(EK) =SD- Basic Package VDF Site Engineering Design Part 1-1;
Ó
SI FASE INTERNA(B) = ORANGE VANOS;
PO01_NUM PO(EI) = No. PO;
PO01_ITEM(EK)=SD- Technical Site Survey and Output Survey report according to
Huawei requirement for MW site only (TSS Includes Completed Site Survey Template,
Site visit included);
ENTONCES:
"PO OK"; SINO; "PDTE. PO"

- PEDIDO AR SKYLON -
SI
FASE INTERNA (B) = VDF RADIO
AND
PROPIETARIO(X) = TOWERCO Ó VANTAGE (TOWERCO) Ó VANTAGE Ó VODAFONE
AND
PO00_NUM PO(DR) = No. po
AND
PO00_ITEM(DT) = SD- Skylon site survey report for VDF;
ENTONCES:
"PO OK"; SINO; "PDTE. PO"

- PEDIDO ADIC. ACTA -


¿¿??
NECESITA NUEVO ESTADO DE AR

- PEDIDO CAP -
SI
FASE INTERNA (B) = ORANGE RADIO;
PO02_NUM PO(EZ) = No. PO
AND
PO02_ITEM(FB) = SD- Site drawing for wireless site;
Ó SI
FASE INTERNA (B) = VDF RADIO;
PO02_NUM PO(Ez) = No. po
AND
PO02_ITEM(fb) =SD- Site drawing for wireless site
Ó SI
FASE INTERNA (B) = VDF RADIO;
PO01_NUM PO(EI) = No. po
AND
PO01_ITEM(EK) =SD- Basic Package VDF Site Engineering Design Part 1-1;
Ó SI
FASE INTERNA(B) = ORANGE VANOS;
PO01_NUM PO(EI) = No. PO;
PO01_ITEM(EK)=SD- Technical Site Survey and Output Survey report according to
Huawei requirement for MW site only (TSS Includes Completed Site Survey Template,
Site visit included);
ENTONCES:
"PO OK"; SINO; "PDTE. PO"

- PEDIDO ADICIONAL CAP -


SI
FASE INTERNA(B) = ORANGE RADIO Ó VDF RADIO;
PO04_NUM PO(GH) = No. po
AND
PO04_ITEM(GJ) = SD- Site Drawings over previous existing drawings;
Ó SI
PO05_NUM PO(GY) = No. po
AND
PO05_ITEM(HA) = SD- Site Drawings over previous existing drawings;
ENTONCES:
"PO OK"; SINO "PDTE. PO"

- PEDIDO CVE -
SI
FASE INTERNA(B) = ORANGE RADIO Ó VDF RADIO;
PO04_NUM PO(GH) = No. po
AND
PO04_ITEM(GJ) = SD- Assessment and calculation of current masts (load
calculation). Site visit is included.;
Ó SI
PO05_NUM PO(GY) = No. po
AND
PO05_ITEM(HA) = SD- Assessment and calculation of current masts (load
calculation). Site visit is included.;
ENTONCES:
"PO OK"; SINO "PDTE. PO"

- PEDIDO ASBUILT -
SI
FASE INTERNA(B) = ORANGE RADIO
AND TIPO ACTIVIDAD CAMPO(B) NO = ASB;
PO03_NUM PO(FQ) = No. po
AND
PO03_ITEM(FS) = SD- As-Built Drawings for wireless site (No site visit
required) ;
Ó SI
SI FASE INTERNA(B) = ORANGE RADIO
AND
TIPO ACTIVIDAD CAMPO(B) = ASB;
PO03_NUM PO(FQ) = No. po
AND
PO03_ITEM(FS) = SD- Site drawing for wireless site;
Ó SI
SI FASE INTERNA(B) = VDF RADIO;
PO03_NUM PO(FQ) = No. po
AND
PO03_ITEM(FS) = SD- Basic Package VDF Site Engineering Design Part 2;
ENTONCES:
"PO OK"; SINO "PTE PO"

- PEDIDO SD TRACKING -
SI
FASE INTERNA(B) = VDF RADIO;
PO06_NUM PO(HP) = No. po
AND
PO06_ITEM(HR) = SD- Inventory management type M;
ENTONCES:
"PO OK"; SINO "PDTE. PO"