Plant/Center Operating Unit Team Operation Model/Type Takt Time Cycle Time Units/Shift Created By Date Page

Insert Components Variable Variable __1_ of _1__


Key Points Times (sec)
No. Job Elements (Safety, Quality, Cost, Techniques) Walking Path (spaghetti diagram)
(use symbols where appropriate) total VA NVA RNVA Wait Man Auto Walk

1, Final Insertion 39,64 39,64 39,64

2, Protective Cover 18,22 18,22 18,22

3, Private Label Decal (Option) 17 17 17

Tools,
Testing
Equipment,
Utilities

09DCPS-R002 (6/19/08)
Creator Date Managers Signature

Job Element Sheet ORIGINAL

Job Element Name JES # Department Takt Time Model Type


REV 1
Final Insertion
SWC # Part Name Process Line Team Element Time Page
REV 2
39,63 1 of 1
In process Quality C
Key stock
Safety
check
Critical item REV 3

Major Step Key Point Video # Oper Type VA NVA RNVA Wait Man Auto Walk Key Point Reason Symbol
1 Insert Component V 9,2 9,2
2 Insert LEDs V 30,43 30,4
Creator Date Managers Signature

Job Element Sheet ORIGINAL

Job Element Name JES # Department Takt Time Model Type


REV 1
Protective Cover
SWC # Part Name Process Line Team Element Time Page
REV 2
18,22 1 of 1
In process Quality C
Key stock
Safety
check
Critical item REV 3

Major Step Key Point Video # Oper Type VA NVA RNVA Wait Man Auto Walk Key Point Reason Symbol
1 Cover with ESD Tape R 18,2 18,2
Creator Date Managers Signature

Job Element Sheet ORIGINAL

Job Element Name JES # Department Takt Time Model Type


REV 1
Private Label Decal (Option)
SWC # Part Name Process Line Team Element Time Page
REV 2
17 1 of 1
In process Quality C
Key stock
Safety
check
Critical item REV 3

Major Step Key Point Video # Oper Type VA NVA RNVA Wait Man Auto Walk Key Point Reason Symbol
1 Get Private Label Decal V 10 10
2 Apply Provate Label Decal V 7 7