You are on page 1of 1

A B C A B C

13475 13475

2000 9475 2000 2000 9475 2000

4000
B' 5475 4000
B' 5475

66

66
55

55
1000
CONNECT TO CONNECT TO CONNECT TO

2000
2000

2000

2000
LAUNDRY
ACCU LOCATION
ACCU LOCATION AREA = 04.00 SQM ACCU LOCATION

1000
AT BASEMENT AT BASEMENT AT BASEMENT
1 1

1160
BALCONY
AREA = 06.52 SQM

1' 1' D
7
DINING FCU-2 MASTER'S BR
AREA = 23.60 SQM
AREA = 21.08 SQM
2.00 HP
6195

6200
D

6795
AREA = 23.85 SQM
4
2 2 FCU-2

5185
ANTEROOM FCU-2
2.00 HPAREA = 25.59 SQM
2.00 HP

KITCHEN
AREA = 14.97 SQM
D
D
3 3 2
2
1655

FCU-1

1815
FCU-2

2.00 HP 250 CFM OFC


0.75 HP
BEDROOM 1 AREA = 04.59 SQM

EF-1 AREA = 21.50 SQM

16025
16025

16025

16025
DN
PANTRY

3530
AREA = 08.39 SQM
FCU-2

5480
23025

23025

23025

23025
2.00 HP
3770

3815
D
2 WIC
4 250 CFM
T&B
4 AREA = 09.67 SQM

1650
EF-1
AREA = 03.83 SQM

D
3
D
FCU-2
LIVING AREA 3
AREA = 51.03 SQM
2665

2525
2530
2.00 HP
WIC DN
250 T&B
CFM
UP D
DEN ROOM AREA = 07.52 SQM AREA = 09.86 SQM
AREA = 10.16 SQM
EF-1

4050
D 2
FCU-1 250 CFM
0.75 HP EF-1
T&B
FOYER
1740

1670
1670
AREA = 05.72 SQM
ACCU-1
AREA = 07.70 SQM
0.75 HP
5 1500
5
RAMP

3185
3185

5000
5000

5000

5000
3500

44
44

33
33

1815
1815

22
22

11

11
225 1775 4150 2470 2855 225 1775 4150 2470 2855

2000 B' 9475 2000 2000 B' 9475 2000

13475 13475

SECOND FLOOR PLAN


UPPER GROUND FLOOR PLAN SCALE 1:100 MTS
SCALE 1:100 MTS

OWNER PROJECT TITLE: OWNER / REPRESENTATIVE: SHEET CONTENTS:

SOLID CORE SCALE ENGINEEEING AND CONSULTANCY


RHOWELLE M. TIBAY PROPOSED (3) THREE-STOREY
RESIDENCE W/ BASEMENT
UPPER GROUND FLOOR
SECOND FLOOR
VENTILATION AND AIR-CONDITIONING
PABALAN CONST. CORP PHASE 2 CAMALI QUISAO
0005619
PLANS
# 64 JVP BUILDING, FELIX MANALO ST. PROVINCE OF RIZAL
PILILLA RIZAL WEST GROVE, SILANG CAVITE
CUBAO QUEZON CITY : 0

You might also like