You are on page 1of 1

2

1 2 3 4 5 1TB02012-012D03-UNA-S1-ZZ-DWG-ST-30001 6 7

34275

2325 6950 9350 5700 7550 2400

2475
250 THK. RC UPSTAND 75
85 1840
(TYP.) TOC +4.650
5050

75

500
C04 C04 C04 C01
500

2575

2575
C02
1799

1799

1880
200Wx50DEEP
C04 C01 C01 C01 1675 OPENING
B C03
C03 C03
2200

C04

RF-B03
RC200 C03
C01

RF-B06
SSL +3.840
C C02 C03 250 THK. RC UPSTAND
200Wx50DEEP (TYP.) TOC +4.650
2775

OPENING
C03
C01 C03

RF-B02A
606

C03 C03 400

RF-B05
C04 C03
RC200

200Wx50DEEP SSL +4.300


24750

4860

OPENING RC200

SSL +4.300 C04 C04


C03 C03

C03 200Wx50DEEP

RF-B04
OPENING
E C04 200Wx50DEEP
C04

2190
OPENING
RF-B02
4790

C04 C04 250 THK. RC UPSTAND


RF-B07
200Wx50DEEP (TYP.) TOC +4.190 C06 C04 C03
1 OPENING
2325 75
RF-B02

1TB02012-012D03-UNA-S1-ZZ-DWG-ST-30001

3224 RC200
F C04 SSL +3.840
C03
C04 200Wx50DEEP
OPENING
626

250 THK. RC UPSTAND


5075

250 THK. RC UPSTAND C04 (TYP.) TOC +4.190


(TYP.) TOC +4.650
RF-B01

200Wx50DEEP 400 200Wx50DEEP


OPENING OPENING

775
696

200Wx50DEEP C06 C08


G OPENING
C07 C06
1875

C06
400

C05
RC300
RF-B08
2240 RC220 SSL +3.890
SSL +3.840
C02 C05

1500 200Wx50DEEP 75 2135


OPENING
250 THK. RC UPSTAND
(TYP.) TOC +4.190

3D VIEW -1

ROOF LEVEL
1 : 100

NOTES:-
1. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT PROJECT DRAWINGS AND
SPECIFICATIONS.
2. ALL STRUCTURAL MEMBERS ARE CENTRAL ABOUT GRID UNLESS NOTED OTHERWISE.
3. THE +0.00 LEVEL FOR EACH BUILDING CORRESPONDS TO THE FINISHED GROUND FLOOR LEVEL FOR THAT
SPECIFIC BUILDING, REFER TO THE ARCHITECTURAL DRAWINGS FOR THE RELATION BETWEEN THIS LOCAL
BUILDING LEVEL AND THE CORRESPONDING MASTERPLAN DATUM LEVEL.
4. REFER TO THE BUILDING SERVICES DRAWINGS FOR THE FLOOR SHAFTS, PENETRATIONS, BUILDERSWORK,
SUMPS, DRAINS, PETROL INTERCEPTORS, MANHOLES, CHAMBERS, AND ALL OTHER SERVICES.
5. OPENING SMALLER THAN 200mm ARE NOT SHOWN IN THE STRUCTURAL GENERAL ARRANGEMENT
DRAWINGS AND SHALL BE REFERED FROM BUILDING SERVICES DRAWINGS.
6. REFER TO THE SPECIALIST DRAWINGS FOR OTHER SERVICES, INCLUDING UTILITIES, SECURITY, KITCHEN,
VT, FLS, ICT, AV, AND ALL OTHER SPECIALIST DRAWINGS.
7. REFER TO THE STRUCTURAL GENERAL NOTES AND STANDARD DETAILS DRAWINGS FOR THE STRUCTURAL
DETAILING TO BE CONSIDERED ALONG WITH THE GENERAL ARRANGEMENT DRAWINGS AND
REINFORCEMENT DETAILS.
8. FOR COLUMN, BEAM & FOUNDATION SCHEDULES REFER DRAWING NO.
1TB02012-012D03-UNA-S1-ZZ-DWG-ST-60001.
9. FOR SLAB REINFORCEMENT REFER DRAWING NO. 1TB02012-012D03-UNA-S1-GF-DWG-ST-40001 AND
1TB02012-012D03-UNA-S1-R1-DWG-ST-40002.
10. FOR LAYOUT OF UPSTAND REFER TO ARCHTECTURAL DRAWINGS.
11. REFER TO THE STRUCTURAL LOADING PLAN DRAWING FOR THE LOADING ALLOWANCES CONSIDERED IN
THE STRUCTURAL DESIGN (DEPENDING ON BUILDING USAGES AND OCCUPANCIES), NOTING THAT NO
CONSTRUCTION TRUCKS SHOULD BE ALLOWED ON THE BUILDINGS ROOF SLAB UNLESS NOTED OTHER
WISE ON THE STRUCTURAL LOADING PLAN.
12. FOR EXTERNAL TERRACES SLAB ON GRADE DETAILS, REFER TO LANDSCAPE DRAWINGS.
13. FOR GENERAL DETAILS RELATED TO PLINTH REINFORCEMENT REFER TO DRAWING NUMBER
1TB02012-012D03-UNA-XX-XX-DWG-ST-00019.
14. FOR SETTING OUT AND DIMENSIONS OF PLINTH REFER TO RELEVANT MEP DRAWINGS.

You might also like