You are on page 1of 1

N 8 9 10 11 12 13

28000
4000 6000 6000 6000 6000

EXISITNG EXTENSION
EXISTING BUILDING
SLAB

1615 1000
C

B/2

STAIR CORE

3755
B/1

3630
WP2
B

3095

3095
1700 2600 1700 825 1700 2600 1700 825

5100

5100
5

7
EF

EF
6000

3 3
28000

2800

2800
* EF9 * EF10 * EF11 *EF12 NOTES:

8
EF
1005

1005

EF
A/2 1. REFER DRAWING 1000-15-Z1-5005 FOR GENERAL CONCRETE NOTES.
2. ALL COORDINATES AND LEVELS ARE IN METERS TO OYU TOLGOI GRID

1800

1800
105

105
SLAG CONVEYOR TRENCH (OTG) SYSTEM.
5741-15-R1-1115 FOR DETAILS 3. ALL WORKS SHALL BE IN ACCORDANCE WITH THE RELEVANT PROJECT
SPECIFICATIONS, INCLUSIVE OF THE FOLLOWING:
6000

0000-15-SPE-0003 STRUCTURAL CONCRETE AND REINFORCING


0000-10-SPE-0001 EARTHWORKS AND ROADWAYS.
4. ALL BACKFILL AROUND CONCRETE STRUCTURES SHALL BE TYPE II
STRUCTURAL FILL AS PER 0000-10-SPE-0001 COMPACTED TO MINIMUM
100% STANDARD PROCTOR DENSITY AND WITHIN +/-2% OPTIMUM
MOISTURE CONTENT.
A/1

4
EF
5. HEAVY ROLLER COMPACTION SHALL NOT BE USED WITHIN 2m OF

EF
A)

A)
1800

1800

1800
CONCRETE STRUCTURES.

(S

(S
6. PROVIDE ISOLATION JOINT AROUND ALL PEDESTALS AND EQUIPMENT
FOOTINGS PENETRATING THROUGH GROUND FLOOR SLAB.
6000

2
LEGEND
EF

EF
A)

A)
(P

(P
TOC DENOTES TOP OF CONCRETE
1550 1450 1200 1450 TOP DENOTES TOP OF PEDESTAL
DENOTES WORKPOINT FOR SETOUT REFER TO DRG 5741-15-R1-1100
WP FOR DETAILS.
A EF9 DENOTES EQUIPMENT FOOTING No. COMBINED WITH GROUND SLAB
WP1 * TO DRG 5741-15-R1-1113 FOR DETAILS.
EF1 DENOTES EQUIPMENT FOOTING No. ISOLATED FROM GROUND SLAB.
FOR BOILER HOUSE FOOTING DETAILS REFER TO DRG 5741-15-R1-1111 TO 5741-15-R1-1113 FOR DETAILS.
REFER TO DRG 5741-15-R1-1106 SHT 5 OF 6 (PA) DENOTES PRIMARY AIR FAN
(SA) DENOTES SECONDARY AIR FAN
DENOTES ISOLATION JOINT REFER TO NOTE 6.

EQUIPMENT FOOTING PLAN


(SCALE: 1:100 mm)

0 2000 4000 6000 8000 10000mm


SCALE 1:100 (A1)
2000

CONSTRUCTION ISSUE
JACOBS ENGINEERING SINGAPORE PTE LTD
(Registration number 199803266M),
a company incorporated in Singapore and

CAUTION - PROJECT DRAWING - NOT AS BUILT


having its registered office at 50 Raffles
Place #32-01 Singapore Land Tower,
Jacobs Document No. Singapore, 048623 (the offshore Contractor)

SN1809-5741/SC.DGA/1110 Web: www.jacobs.com

DES. DES. PRODUCED BY DESIGNED BY DRAWN BY


REV. DATE REVISION DESCRIPTION APPROVED REV. DATE REVISION DESCRIPTION APPROVED REFERENCE DRAWING No. REFERENCE DRAWINGS OYU TOLGOI UNDERGROUND PROJECT
CHK. CHK. M. EDINGTON S.GORDON
DR
ANCILLARY FACILITIES - CENTRAL HEATING FACILITY
SG PROJECT NO CHECK DESIGN CHECK DRAWING
0 07/07/17 ISSUED FOR CONSTRUCTION
KK EB
5741-15-R1-1150 BOILER HOUSE - GROUND FLOOR SLAB GENERAL ARRANGEMENT
SN1809 K.KOOPS
CENTRAL HEATING PLANT - BOILER HOUSE
W.SCORER
1 15/09/17 AMENDED AS CLOUDED
SG
FH
DR
5741-15-R1-1100 GENERAL ARRANGEMENT ОЮУ ТОЛГОЙ ХХК CONTRACT NO LEAD ENGINEER APPROVAL DATE
EQUIPMENT FOOTINGS GENERAL ARRANGEMENT
SC
SG DR D.RANKIN 07/07/17
2 20/10/17 AMENDED AS CLOUDED
FH BP Disclaimer: Drawings, plans, models, designs or any other information displayed, contained in, made available or disclosed in or by this
document (or its part or attachment) is owned by Oyu Tolgoi LLC and may be a proprietary of Oyu Tolgoi LLC and hence they are for the
DRAWING SIZE AREA PROJECT ENGINEER ENGINEERING MANAGER

SG DR internal use of Oyu Tolgoi LLC only. Making a copy or reproduction thereof in any form or giving an access or possession of them to any other
A1 -- E.BROADBENT
3 19/10/17 HOLDS REMOVED party without Oyu Tolgoi LLC's written consent or permission shall be strictly prohibited. Any violation (actual or attempted) of these terms

FH BP and prohibitions shall be subject legal liabilities and Oyu Tolgoi LLC reserves its rights and entitlements to all available legal remedies.
Мэдэг дэл: Энэхүү баримт бичиг (эсхүл т үү ний хэсэг , хавсралт )-т үз үү лсэн, харуулсан, аг уулаг дсан, мөн PLOT SCALE PROJECT MANAGER APPROVAL DATE
энэхүү баримт бичг ээр ил тавьсан з ураг , т өлөвлөг өө, заг вар, диз айн болон бусад аливаа мэдээллийг
Оюу Толг ой ХХК өмчлөх бөг өөд Оюу Толг ой ХХК-ийн өмч мөн. Иймээс эдг ээр мэдээлэл нь з өвхөн Оюу Толг ой
ХХК-ийн дотоод хэрэг цээнд з ориулаг дсан бөг өөд Оюу Толг ой ХХК-ийн бичг эн з өвшөөрөлг үйг ээр эдг ээр -- 07/07/17
мэдээллийг аливаа хэлбэрээр хуулбарлах, хувилан олшруулах эсхүл эдг ээр мэдээлэлд нэвт рэх эрхийг аливаа
бусад этг ээдэд өг өхийг хатуу хориг лоно. Эдг ээр нөхцлийн (бодитоор з өрчсөн эсхүл з өрчихийг оролдсон) CAD FILE NAME CLIENT APPROVAL DATE SCALE DRAWING NUMBER REV.
аливаа зөрчилд хуулийн хариуцлаг а хүлээлг эх бөг өөд боломжит бүх хууль эрх з үйн арг а хэмжээ авах эрхээ
Оюу Толг ой ХХК хадг ална .
-- -- AS SHOWN 5741-15-R1-1110 3