01 01 Heat system
01 Main building project √ √ √ √ √
00 01 Foundation and foundation engineering √ √ √ √
02 Earth (stone) excavation and backfilling √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
Table
01 Earth excavation √ √ √ √ 5.3.1, and
Table 5.3.2
03 Backfill √ √ √ √
Table
01 Backfill √ √ √ √ W
5.3.3
03 Main building foundation project √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
1 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
2 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
03 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
02 Main steel structure √ √ √ √
Fabrication (installation) and welding
01 √ √ √ √
of steel components
Fabrication (installation) and welding Table
01 √ √ √ √
of steel components 5.13.1
02 Ordinary fixture connection √ √ √ √
Table
01 Ordinary fixture connection √ √ √ √
5.13.3
03 High-strength bolt connection √ √ √ √
Table
01 High-strength bolt connection √ √ √ √
5.13.4
3 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
4 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
07 Wall masonry √ √ √ √
Table
5.11.1-
01 Masonry works √ √ √ √ W
Table
5.11.5
03 Various floor structure √ √ √ √
01 Steel structure of each floor platform √ √ √ √
01 Steel beam welding √ √ √ √
Table
01 Welding of steel structure √ √ √ √
5.13.1
Processing of steel beam parts and
02 √ √ √ √
components
Processing of steel structure parts and Table
01 √ √ √ √
components 5.13.5
03 Assembly of steel beam √ √ √ √
Table
01 Assembly of steel structure √ √ √ √
5.13.9
04 Installation of steel beam √ √ √ √
Table
01 Installation of steel beam √ √ √ √ W
5.13.16
05 Coating steel beam √ √ √ √
6 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Anticorrosion steel beam √ √ √ √
5.13.24
Table
02 Fire protection steel beam √ √ √ √
5.13.25
Welding of steel components (steel
06 √ √ √ √
ladders, platforms and railings)
Table
01 Welding of steel component √ √ √ √
5.13.1
Processing of steel components (steel
07 √ √ √ √
ladder platforms and railings) and parts
Processing of steel structure parts and Table
01 √ √ √ √
components 5.13.5
Steel components (steel ladders,
08 √ √ √ √
platforms and railings) assembly
Assembly of steel ladders, platforms Table
01 √ √ √ √
and railings 5.13.13
Installation of steel components (steel
09 √ √ √ √
ladders, platforms and railings)
Installation of steel components (steel Table
01 √ √ √ √
ladders, platforms and railings) 5.13.19
7 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
8 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
9 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
04 Crane beam structure √ √ √ √
01 Steel structure crane beam √ √ √ √
01 Steel beam welding √ √ √ √
Table
01 Welding of steel structure √ √ √ √
5.13.1
Processing of steel beam parts and
02 √ √ √ √
components
Processing of steel structure parts and Table
01 √ √ √ √
components 5.13.5
03 Assembly of steel beam √ √ √ √
Table
01 Assembly of steel structure √ √ √ √
5.13.9
04 Installation of steel beam √ √ √ √
Table
01 Installation of steel beam √ √ √ √ W
5.13.17
10 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
11 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
12 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Installation of profiled sheet √ √ √ √
5.29.15
02 Formwork √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.10.9
Table
02 Concrete construction √ √ √ √ W
5.10.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.10.11
Decoration and renovation project of
06 √ √ √ √
main building
01 Floor and ground √ √ √ √
01 Quality of foundation earth √ √ √ √
13 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
Quality of foundation earth √ √ √ √
5.17.1
02 Cushion √ √ √ √
Table
Cushion √ √ √ √ 5.17.2.1-
5.17.2.6
03 Middle processing layer √ √ √ √
Table
Middle processing layer √ √ √ √ 5.17.3.1-
5.17.3.4
04 Surface layer √ √ √ √
Table
5.17.4.1-
Surface layer √ √ √ √
Table
5.17.4.24
02 Plastering √ √ √ √
01 General plastering √ √ √ √
Table
01 General plastering √ √ √ √
5.18.1
Table
03 Doors and windows √ √ √ √
5.13.3
14 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
15 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Installation of door and window glass √ √ √ √
5.20.6
04 Suspended ceiling √ √ √ √
01 Whole surface ceiling √ √ √ √
Table
01 Whole surface ceiling √ √ √ √
5.21.1
02 Plate surface ceiling √ √ √ √
Table
01 Plate surface ceiling √ √ √ √
5.21.2
05 Veneer (brick) √ √ √ √
01 Veneer installation √ √ √ √
Table
01 Veneer installation √ √ √ √ 5.23.1.1
-5.23.1.5
02 Facing brick pasting √ √ √ √
Table
01 Pasting of interior wall facing bricks √ √ √ √
5.24.1
Main building construction equipment
08 √ √ √ √
installation project
01 Indoor water supply system √ √ √ √
01 Installation of indoor water supply √ √ √ √
16 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
17 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
sanitary ware
Installation of water supply fittings for Table
01 √ √ √ √
sanitary ware 5.31.8
Installation of water drainage pipes for
03 √ √ √ √
sanitary ware
Installation of water drainage pipes for Table
01 √ √ √ √
sanitary ware 5.31.9
04 Indoor heating system √ √ √ √
Installation of indoor heating pipes and
01 √ √ √ √
fittings
Installation of indoor heating pipes and Table
01 √ √ √ √
fittings 5.31.10
Installation of indoor auxiliary heating
02 √ √ √ √
equipment and radiator
Installation of indoor auxiliary heating Table
01 √ √ √ √
equipment and radiator 5.31.11
Water pressure test and debugging of
04 √ √ √ √
indoor heating system
Water pressure test and debugging of Table
01 √ √ √ √ W
indoor heating system 5.31.13
05 Anti-corrosion and thermal insulation √ √ √ √
18 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Anti-corrosion and thermal insulation √ √ √ √
5.31.21
05 Outdoor water supply pipe network √ √ √ √
Installation of outdoor water supply
01 √ √ √ √
pipes
Installation of outdoor water supply Table
01 √ √ √ √
pipes 5.31.14
02 Outdoor pipe trench and well chamber √ √ √ √
Table
01 Outdoor pipe trench and well chamber √ √ √ √
5.31.17
06 Outdoor drainage system √ √ √ √
01 Installation of outdoor drainage pipes √ √ √ √
Table
01 Installation of outdoor drainage pipes √ √ √ √
5.31.16
02 Outdoor pipe trench and well chamber √ √ √ √
Table
01 Outdoor pipe trench and well chamber √ √ √ √
5.31.15
07 Outdoor heating pipe network √ √ √ √
Installation of outdoor heating pipes
01 √ √ √ √
and fittings
01 Installation of outdoor heating pipes √ √ √ √ Table
19 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
20 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
21 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
5.32.7
Installation of fan and air pretreatment
04 √ √ √ √
equipment
Table
Installation of fan and air pretreatment 5.32.8-
01 √ √ √ √
equipment Table
5.32.11
Anti-corrosion and thermal insulation
05 construction (air duct system and √ √ √ √
equipment)
Anti-corrosion and thermal insulation
Table
01 construction (air duct system and √ √ √ √
5.32.17
equipment)
02 Smoke control system √ √ √ √
01 Production of air duct and accessories √ √ √ √
Table
5.32.1, and
01 Production of air duct and accessories √ √ √ √
Table
5.32.3
02 Production of air duct components and √ √ √ √
22 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
fire extinguishers
Production of air duct components and Table
01 √ √ √ √
fire extinguishers 5.32.4
03 Installation of air duct system √ √ √ √
Table
5.32.5-
01 Installation of air duct system √ √ √ √
Table
5.32.7
Installation of fan and air pretreatment
04 √ √ √ √
equipment
Table
Installation of fan and air pretreatment 5.32.8-
01 √ √ √ √
equipment Table
5.32.11
Anti-corrosion and thermal insulation
05 construction (air duct system and √ √ √ √
equipment)
Anti-corrosion and thermal insulation
Table
01 construction (air duct system and √ √ √ √
5.32.17
equipment)
03 Air conditioning system √ √ √ √
23 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
01 Fan installation √ √ √ √
Table
01 Fan installation √ √ √ √
5.32.7
Installation of ventilation and air
02 √ √ √ √
conditioning equipment
Table
Installation of ventilation and air 5.32.8-
01 √ √ √ √
conditioning equipment Table
5.32.10
03 Anti-corrosion and thermal insulation √ √ √ √
Table
5.32.15,
01 Anti-corrosion and thermal insulation √ √ √
and Table
5.32.16
04 Engineering system debugging √ √ √ √
Table
01 Engineering system debugging √ √ √ √ W
5.32.17
10 Architecture electric √ √ √ √ √
Indoor electrical lighting installation
01 √ √ √ √
project
24 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
25 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
26 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.33.12
Installation of lightning protection
02 √ √ √ √
down conductor and lightning arrester
Installation of lightning protection Table
01 √ √ √ √
down conductor and lightning arrester 5.33.13
Installation of equipotential bonding
03 √ √ √ √
surge protector for buildings
Installation of equipotential bonding Table
01 √ √ √ √
surge protector for buildings 5.33.15
11 Smart building project √ √ √ √ √
01 Smart integrated system √ √ √ √
01 Equipment and software installation √ √ √ √
Table
01 Equipment and software installation √ √ √ √
5.34.2
02 System debugging and running √ √ √ √
Table
01 System debugging and running √ √ √ √ W
5.34.3
02 Information access system √ √ √ √
01 Cable laying √ √ √ √
Table
01 Cable laying √ √ √ √
5.34.1
27 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
28 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
29 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
30 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
31 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
32 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
33 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
34 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
35 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Steel bar installation √ √ √ √ H
5.12.8
07 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
08 Steel grating installation √ √ √ √
Table
01 Steel grating installation √ √ √ √
5.13.19
01 01 04 00 Boiler construction √ √ √ √ √
01 Foundation and foundation engineering √ √ √ √
02 Earth (stone) excavation and backfilling √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
Table
01 Earth excavation √ √ √ √ W 5.3.1, and
Table 5.3.2
36 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
03 Backfill √ √ √ √
Table
01 Backfill √ √ √ √ W
5.3.3
03 Boiler foundation project √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
02 Concrete construction √ √ √ √ W Table
37 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
05 Secondary grouting √ √ √ √
Table
01 Secondary grouting √ √ √ √ W
6.7.8
07 Elevator project √ √ √ √ √
00 01 Incoming equipment acceptance √ √ √ √
Table
01 Incoming equipment acceptance √ √ √ √
5.36.1
02 Civil work handover inspection √ √ √ √
Table
01 Civil work handover inspection √ √ √ √ W
5.36.2
03 Driver host installation √ √ √ √
Table
01 Driver host installation √ √ √ √
5.36.3
04 Rail installation √ √ √ √
Table
01 Rail installation √ √ √ √
5.36.4
05 Installation of door system √ √ √ √
01 Installation of door system √ √ √ √ Table
38 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.36.5
Car and counterweight (balance weight)
06 √ √ √ √
installation
Car and counterweight (balance weight) Table
01 √ √ √ √
installation 5.36.6
07 Installation of safety parts √ √ √ √
Table
01 Installation of safety parts √ √ √ √
5.36.7
Installation of suspension device,
08 accompanying cable, and compensation √ √ √ √
device
Installation of suspension device,
Table
01 accompanying cable, and compensation √ √ √ √
5.36.8
device
09 Electrical installation √ √ √ √
Table
01 Electrical installation √ √ √ √
5.36.9
10 Complete elevator installation √ √ √ √
Table
01 Complete elevator installation √ √ √ √ W
5.36.10
01 01 05 Main building underground facilities √ √ √ √ √
39 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
project
01 Turbine underground facilities √ √ √ √
01 00 Electric feed pump foundation √ √ √ √
01 Positioning and elevation control √ √ √
01 Positioning and elevation control √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
03 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.7.1
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
40 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
41 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 10.15.3
06 Secondary grouting √ √ √ √
secondary grouting for equipment
01 √ √ √ √ W Table 6.7.8
foundation
03 00 Circulating sump and pump foundation √ √ √ √
01 Positioning and elevation control √ √ √
01 Positioning and elevation control √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
03 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
10.15.1
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
02 Steel bar installation √ √ √ √ H Table
42 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
10.15.2
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 10.15.3
06 Secondary grouting √ √ √ √
secondary grouting for equipment
01 √ √ √ √ Table 6.7.8
foundation
04 00 Other equipment foundation √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
03 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.7.1
04 Steel bar √ √ √ √
43 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.12
06 Secondary grouting √ √ √ √
secondary grouting for equipment
01 √ √ √ √ W Table 6.7.8
foundation
05 00 Trench works √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.8.1
03 Steel bar √ √ √ √
44 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Appearance and size deviation of
03 √ √ √ √ Table 6.8.6
concrete trench
05 Trench cover formwork √ √ √ √
Table
01 Formwork √ √ √ √
11.4.8
06 Trench cover reinforcement √ √ √ √
Table
01 Steel bar installation √ √ √ √
11.4.9
07 Trench cover concrete √ √ √ √
Table
01 Trench cover concrete √ √ √ √
11.4.10
08 Steel cover production √ √ √ √
45 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel cover production √ √ √ √
11.4.11
09 Cover installation √ √ √ √
Table
01 Cover installation √ √ √ √
11.4.12
02 Underground facilities for boiler √ √ √
01 00 Blower foundation √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
03 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.7.1
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
46 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.12
06 Secondary grouting √ √ √ √
01 Secondary grouting of foundation √ √ √ √ W Table 6.7.8
02 00 Induced fan foundation √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
03 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.7.1
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
47 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
48 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.12
06 Secondary grouting √ √ √ √
01 Secondary grouting of foundation √ √ √ √ W Table 6.7.8
04 00 Condensate tank foundation √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Cushion √ √ √ √
01 Cushion √ √ √ √ Table
49 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.17.2
03 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.7.1
04 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
05 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.12
06 Secondary grouting √ √ √ √
01 Secondary grouting of foundation √ √ √ √ W Table 6.7.8
05 00 Pit project √ √ √ √
01 Cushion √ √ √ √
50 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
10.15.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
10.15.2
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 10.15.3
05 Concrete anticorrosion √ √ √ √
Table
01 Pit concrete anticorrosion √ √ √ √ 5.30.1-
5.30.7
51 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
06 00 Trench works √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.8.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Appearance and size deviation of
03 √ √ √ √ Table 6.8.6
concrete trench
05 Trench cover formwork √ √ √ √
Table
01 Formwork √ √ √ √
11.4.8
52 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
53 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
04 Backfill √ √ √ √
01 Backfilling √ √ √ √ Table 5.3.3
09 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.17.2-1-
5.17.2-6
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
03 Concrete structure appearance and size √ √ √ √ Table
54 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
deviation 5.12.11
10 Equipment foundation and channel √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.17.2-1-
5.17.2-6
02 Device foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Equipment foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Equipment foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Appearance and size deviation of Table
03 √ √ √ √
equipment foundation 5.12.12
55 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
56 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
2 Main structure √ √ √ √
1 Concrete structure √ √ √ √
1 Formwork √ √ √ √
Fabrication of fair-faced concrete Table
1 √ √ √ √
formwork 5.12.4
2 Installation of fair-faced concrete √ √ √ √ Table
57 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
formwork 5.12.5
2 Steel bar √ √ √ √
Table
1 Steel bar processing √ √ √ √
5.12.6
Table
2 Steel bar installation √ √ √ √ H
5.12.8
3 Concrete construction √ √ √ √
Table
1 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
2 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
3 √ √ √ √
deviation 5.12.11
02 Rear flue bracket for dust collector √ √ √ √ √
01 Foundation and foundation engineering √ √ √ √
01 Unsupported earthwork √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
Table 5.3.1-
01 Earthwork (stone) excavation √ √ √ √
5.3.2
58 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
04 Backfill √ √ √ √
01 Backfilling √ √ √ √ Table 5.3.3
09 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.17.2-1-
5.17.2-6
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
03 Concrete structure appearance and size √ √ √ √ Table
59 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
deviation 5.12.11
2 Main structure √ √ √ √
1 Concrete structure √ √ √ √
1 Formwork √ √ √ √
Fabrication of fair-faced concrete Table
1 √ √ √ √
formwork 5.12.4
Installation of fair-faced concrete Table
2 √ √ √ √
formwork 5.12.5
2 Steel bar √ √ √ √
Table
1 Steel bar processing √ √ √ √
5.12.6
Table
2 Steel bar installation √ √ √ √ H
5.12.8
3 Concrete construction √ √ √ √
Table
1 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
2 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
3 √ √ √ √
deviation 5.12.11
01 03 Ash removal system √ √ √ √ √
60 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 00 Slag removal facility project √ √ √ √ √
5.27.17
01 Foundation and foundation engineering √ √ √ √ √
02 Slag bin foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
02 Concrete construction √ √ √ √ W Table
61 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
03 Slag remover foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Foundation pile anchor reinforcement Table
02 √ √ √ √
welding 5.12.7
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
02 Concrete construction √ √ √ √ W Table
62 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
Water supply and water treatment
00 05 √ √
system
17 00 Unit drainage tank and pump room √ √
01 Foundation and foundation engineering √ √ √ √
01 Unsupported earthwork √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
Table 5.3.1-
01 Earthwork (stone) excavation √ √ √ √
5.3.2
04 Backfill √ √ √ √
01 Backfilling √ √ √ √ W Table 5.3.3
09 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.17.2-1-
5.17.2-6
63 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
03 Steel bar installation √ √ √ √ H
5.12.8
04 Foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
10 Equipment foundation and channel √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.17.2-1-
5.17.2-6
02 Device foundation formwork √ √ √ √
64 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Formwork installation √ √ √ √
5.12.1
03 Equipment foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Equipment foundation concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Appearance and size deviation of Table
03 √ √ √ √
equipment foundation 5.12.12
06 Foundation concrete anticorrosion √ √ √ √
Table
01 Foundation concrete anticorrosion √ √ √ √
5.30.3
02 Main structure √ √ √ √
01 Concrete structure √ √ √ √
01 Formwork √ √ √ √
01 Fabrication of fair-faced concrete √ √ √ √ Table
65 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
formwork 5.12.4
Installation of fair-faced concrete Table
02 √ √ √ √
formwork 5.12.5
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
03 Concrete construction √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
02 Masonry works √ √ √ √
05 Infill wall masonry √ √ √ √
Table
01 Infill wall masonry √ √ √ √
5.11.5
03 Building decoration √ √ √ √
03 Waterproofing of exterior walls √ √
66 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Waterproof coating √ √ √ √
Table
01 Waterproof coating √ √ √ √
5.19.2
01 06 Electrical system √ √ √ √ √
01 Structures our of row A √ √ √ √ √
00 01 Foundation and foundation engineering √ √ √ √
01 Earth (stone) excavation and backfilling √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
Table
01 Earth excavation √ √ √ √ 5.3.1, and
Table 5.3.2
03 Backfill √ √ √ √
Table
01 Backfill √ √ √ √ W
5.3.3
02 00 Main transformer foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
67 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
11.3.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 11.3.6
03 00 Station transformer foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table
68 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
11.3.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 11.3.6
04 Inlet-outlet line structure √ √ √ √
01 Architecture foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
11.3.1
69 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 11.3.6
02 Architecture production and installation √ √ √ √
01 Steel structure fabrication and welding √ √ √ √
Table
01 Steel structure fabrication and welding √ √ √ √
5.13.1
02 Common fastener connection √ √ √ √
Table
01 Common fastener connection √ √ √ √
5.13.3
03 High-strength bolt connection √ √ √ √
01 High-strength bolt connection √ √ √ √ Table
70 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.13.4
Processing of steel structure parts and
04 √ √ √ √
components
Processing of steel structure parts and Table
01 √ √ √ √
components 5.13.5
09 Steel frame installation √ √ √ √
Table
01 Steel frame installation √ √ √ √ W
11.2.9
Assembly of steel ladders, platforms Table
02 √ √ √ √
and railings 11.2.13
Table
03 Installation of steel components √ √ √ √
11.2.14
Accident oil pit, oil pool, and oil
05 00 √ √ √ √
discharge pipe
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Oil pool and pit template √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
03 Oil pool and pit reinforcement √ √ √ √
71 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Oil pool and pit concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.09
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.12.11
05 Oil drain pipe installation √ √ √ √
Table
01 Oil drain pipe installation √ √ √ √ W
5.31.16
Table
02 Anticorrosion of oil discharge pipe √ √ √ √ 5.30.1-
5.30.4
06 Firewall √ √ √ √
01 Earth (stone) excavation and backfilling √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
72 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Excavation √ √ √ √
Table
01 Earth excavation √ √ √ √ 5.3.1, and
Table 5.3.2
03 Backfill √ √ √ √ W
Table
01 Backfill √ √ √ √
5.3.3
02 Supper structure √ √ √ √
01 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.12.1
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
03 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
73 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
74 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
08 00 Cable channel √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
02 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.8.1
03 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
04 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Appearance and size deviation of
03 √ √ √ √ Table 6.8.6
concrete trench
05 Trench cover formwork √ √ √ √
Table
01 Formwork √ √ √ √
11.4.8
75 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
76 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
77 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.10.11
Concrete structure appearance size Table
03 √ √ √ √
deviation 5.10.12
05 Foundation concrete anticorrosion √ √ √ √
Table
01 Foundation concrete anticorrosion √ √ √ √
5.23.6
02 Main structure √ √ √ √ √
01 Concrete structure √ √ √ √
01 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
03 Concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
78 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Concrete construction √ √ √ √ W
5.10.11
Concrete structure appearance size Table
03 √ √ √ √
deviation 5.10.12
02 Steel structure √ √ √ √
01 Steel structure welding project √ √ √ √
Table
01 Welding of steel component √ √ √ √
5.11.1
02 Steel grid production project √ √ √ √
Table
01 Steel grid production √ √ √ √
5.11.6
Installation of steel components (wall
03 √ √ √ √
frames and purlins)
Installation of steel components (wall Table
01 √ √ √ √
frames and purlins) 5.11.18
04 Steel grid installation project √ √ √ √
Table
01 Steel grid installation √ √ √ √ H
5.11.20
05 Profiled sheet metal works √ √ √ √
Table
01 Profiled sheet metal √ √ √ √
5.11.21
79 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
80 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
81 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
82 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
01 Unsupported earthwork √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Precipitation and drainage √ √ √ √
Table
01 Precipitation and drainage √ √ √ √
5.3.11
03 Excavation √ √ √ √
01 Earth excavation √ √ √ √ Table 5.3.1
04 Backfill √ √ √ √
01 Backfilling √ √ √ √ W Table 5.3.2
02 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.12.7
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
03 Foundation reinforcement √ √ √ √
83 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
04 Foundation concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
02 Concrete construction √ √ √ √ W
5.10.11
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.10.12
5 Foundation concrete anticorrosion √ √ √ √
Table
01 Foundation concrete anticorrosion √ √ √ √
5.23.6
02 Main structure √ √ √ √ √
01 Concrete structure √ √ √ √
01 Formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 7.2.1
Table
02 Formwork removal √ √ √ √
5.10.6
02 Steel bar √ √ √ √
84 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
03 Concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
02 Concrete construction √ √ √ √ W
5.10.11
Concrete structure appearance and size
03 √ √ √ √ Table 7.2.7
deviation
04 Concrete anticorrosion √ √ √ √
Table
01 Concrete anticorrosion √ √ √ √
5.23.6
02 Above ground concrete structure √ √ √ √
01 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
02 Steel bar √ √ √ √
85 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
03 Concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
02 Concrete construction √ √ √ √ W
5.10.11
Concrete structure appearance and size Table
03 √ √ √ √
deviation 5.10.12
03 Masonry works √ √ √ √
01 Infill wall masonry √ √ √ √
01 Infill wall masonry √ √ √ √ Table 5.9.5
钢结构
04 √ √ √ √ √
Steel structure
01 Welding of steel structure √ √ √ √ √
Table
01 Welding of steel structure √ √ √ √ √
5.11.1
02 Common fastener connection √ √ √ √ √
01 Ordinary fixture connection √ √ √ √ √ Table
86 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.11.3
Processing of steel structure parts and
03 √ √ √ √ √
components
Processing of steel parts and Table
01 √ √ √ √ √
components 5.11.5
04 Assembly of steel components √ √ √ √ √
Assembly of steel components (trusses Table
01 √ √ √ √ √
and trusses) 5.11.10
05 Pre-assembly of steel components √ √ √ √ √
Table
01 Pre-assembly of steel components √ √ √ √ √
5.11.14
06 Installation of steel components √ √ √ √ √ W
Installation of steel member (single Table
01 √ √ √ √ √
floor) 5.11.15
07 Painting of steel structure √ √ √ √ √
Table
01 Anticorrosion of steel structure √ √ √ √ √
5.11.22
Table
02 Fire protection of steel structure √ √ √ √ √
5.11.23
Installation of steel components (wall
08 √ √ √ √ √
frames and purlins)
87 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
88 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Plastic window installation √ √ √ √
5.14.6
02 Glass √ √ √ √
Table
01 Glass installation √ √ √ √
5.14.8
04 Facing brick √ √ √ √
01 Facing brick pasting √ √ √ √
Table
01 Facing brick pasting √ √ √ √
5.17.2
5 Finishing √ √ √ √
01 Wall paint finishing √ √ √ √
Table
01 Waterborne paint finishing √ √ √ √
5.19.1
04 00 Building roof √ √ √ √ √
01 Roof leveling layer √ √ √ √
Table
01 Roof leveling layer √ √ √ √
5.22.1
02 Roof insulation √ √ √ √
Table
01 Roof insulation √ √ √ √
5.22.2
03 Roof rolled waterproofing layer √ √ √ √
89 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Roof rolled waterproofing layer √ √ √ √
5.22.3
04 Roof engineering details √ √ √ √
01 Roof engineering details √ √ √ √ Table 5.5.7
Water supply, drainage and heating of
05 √ √ √ √ √
buildings
01 Indoor water drainage system √ √ √ √
Installation of rainwater pipes and
01 √ √ √ √
fittings
Installation of rainwater pipes and Table
01 √ √ √ √
fittings 5.25.3
02 Indoor heating system √ √ √ √
Installation of indoor heating pipes and
01 √ √ √ √
fittings
Installation of indoor heating pipes and Table
01 √ √ √ √
fittings 5.25.10
Installation of indoor auxiliary heating
02 √ √ √ √
equipment and radiator
Installation of indoor auxiliary heating Table
01 √ √ √ √
equipment and radiator 5.25.11
90 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
91 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
trunking 5.26.4
Cable head fabrication, wiring and line
04 √ √ √ √
insulation testing
Cable head fabrication, wiring and line Table
01 √ √ √ √
insulation testing 5.26.6
05 Ordinary lighting installation √ √ √ √
Table
01 Ordinary lighting installation √ √ √ √
5.26.7
06 Special lighting installation √ √ √ √
Table
01 Special lighting installation √ √ √ √
5.26.8
Installation of switches, outlets, and
07 √ √ √ √
fans
Installation of switches, outlets, and Table
01 √ √ √ √
fans 5.26.10
08 Test operation of building lighting √ √ √ √
Table
01 Test operation of building lighting √ √ √ √ W
5.26.11
00 02 Fuel supply system √ √
12 Coal transfer station √ √ √ √ √
05 Coal transfer station (coal crusher √ √
92 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
room)
01 Foundation and foundation engineering √ √ √ √ √
01 Unsupported earthwork √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
01 Excavation √ √ √ √ Table 5.3.1
03 Backfill √ √ √ √
01 Backfilling √ √ √ √ W Table 5.3.2
02 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
01 Table
Cushion √ √ √ √
5.12.7
02 Formwork √ √ √ √
01 Table
Formwork installation √ √ √ √
5.10.1
02 Table
Formwork removal √ √ √ √
5.10.6
03 Steel bar √ √ √ √
01 Steel bar processing √ √ √ √ Table
93 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.10.7
02 Table
Steel bar installation √ √ √ √ H
5.10.9
04 Concrete √ √ √ √
01 Raw materials and mixing ratio of Table
√ √ √ √
concrete 5.10.10
02 Table
Concrete construction √ √ √ √ W
5.10.11
03 Concrete structure appearance size Table
√ √ √ √
deviation 5.10.12
05 Concrete anticorrosion √ √ √ √
01 Table
Concrete anticorrosion √ √ √ √
5.23.6
03 trench √ √ √ √
01 Channel cushion √ √ √ √
01 Table
Cushion √ √ √ √
5.12.7
02 Channel formwork √ √ √ √
01 Table
Formwork installation √ √ √ √
5.10.1
02 Formwork removal √ √ √ √ Table
94 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.10.6
03 Trench reinforcement √ √ √ √
01 Table
Steel bar processing √ √ √ √
5.10.7
02 Table
Steel bar installation √ √ √ √ H
5.10.9
04 Trench concrete √ √ √ √
01 Raw materials and mixing ratio of Table
√ √ √ √
concrete 5.10.10
02 Table
Concrete construction √ √ √ √ W
5.10.11
03 Concrete structure appearance size Table
√ √ √ √
deviation 5.10.12
05 Trench concrete anticorrosion √ √ √ √
01 Table
Concrete anticorrosion √ √ √ √
5.23.6
06 Cover installation √ √ √ √
01 Table
Cover installation √ √ √ √
11.4.13
02 Main project √ √ √ √ √
01 Concrete structure √ √ √ √
95 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
96 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Steel structure
01 Stair railing welding and installation √ √ √ √
01 Table
Stair railing installation
√ √ √ √ 5.11.19
02 Table
Stair railing welding
√ √ 5.11.1
02 Steel ladder welding and installation √ √ √ √
01 Table
Steel ladder installation
√ √ √ √ 5.11.19
02 Table
Steel ladder welding √ √ √ √
5.11.1
03 Anti-corrosion coating √ √ √ √
01 Table
Anti-corrosion coating √ √ √ √
5.11.22
03 Building decoration √ √ √ √ √
01 Ground √ √ √ √
01 Grassroots √ √ √ √
01 Table
Cement foundation √ √ √ √
5.12.7
02 Table
Leveling layer √ √ √ √
5.12.8
97 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
98 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
99 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
100 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
101 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
102 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
103 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
104 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
105 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
conditioning equipment
01 Installation of ventilation and air Table
√ √ √ √
conditioning equipment 5.27.8
06 Anti-corrosion and thermal insulation √ √ √ √
01 Table
Anti-corrosion and thermal insulation √ √ √ √
5.27.15
07 Engineering system debugging √ √ √ √
01 Table
Engineering system debugging √ √ √ √ W
5.27.17
00 03 Ash removal system √ √
灰库
11 √ √ √ √ √
Ash bunker
00 √ √
01 Foundation project √ √ √ √
01 Unsupported earthworks √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Excavation √ √ √ √
01 Excavation √ √ √ √ Table 5.3.1
03 Backfill √ √ √ √
106 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
107 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
108 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.10.11
Concrete structure appearance size Table
03 √ √ √ √
deviation 8.11.7
02 Masonry works √ √ √ √
01 Infill wall masonry √ √ √ √
01 Infill wall masonry √ √ √ √ Table 5.9.5
04 Building decoration √ √ √ √
01 Ground √ √ √ √
01 Grassroots √ √ √ √
Table
01 Cement foundation √ √ √ √
5.12.7
02 Surface layer √ √ √ √
Table
01 Cement mortar surface √ √ √ √
5.12.12
Table
02 Brick surface √ √ √ √
5.12.17
02 Plastering √ √ √ √
01 General plastering √ √ √ √
Table
01 General plastering √ √ √ √
5.13.1
109 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
110 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Roof insulation √ √ √ √
01 Roof insulation √ √ √ √ Table 5.22.2
111 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
112 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
113 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
00 Public unit √ √
05 Water supply and water treatment √ √
03 Boiler feed water treatment room √ √
00 01 Foundation and foundation engineering √ √ √ √ √
01 Unsupported earthworks √ √ √ √
01 Positioning and elevation control √ √ √ √
01 Positioning and elevation control √ √ √ √ W Table 5.2.1
02 Earth excavation √ √ √ √
01 Earth excavation √ √ √ √ Table 5.3.1
√ √ Table 5.3.1
03 Earth filling √ √ √ √
114 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
02 Concrete foundation √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.12.2~
Table
√ √
5.12.7
02 Foundation formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
03 Foundation reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
04 Foundation concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
115 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
√ √
5.12.7
Table
02 02 Formwork removal √ √ √ √
5.10.6
116 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Concrete construction √ √ √ √ W
5.10.11
07 Channel cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.12.2~
Table
√ √
5.12.7
08 Channel formwork √ √ √ √
117 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Formwork removal √ √ √ √
5.10.6
09 Trench reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
10 Trench concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
02 Concrete construction √ √ √ √ W
5.10.11
12 Cover reinforcement √ √ √ √
Table
01 Reinforcement project √ √ √ √
11.4.10
13 Cover concrete √ √ √ √
118 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Cover concrete project √ √ √ √
11.4.11
14 Cover installation √ √ √ √
Table
01 Cover installation √ √ √ √
11.4.13
04 Masonry foundation √ √ √ √
01 Brickwork √ √ √ √
01 Brickwork √ √ √ √ W Table 5.9.1
02 Main structure √ √ √ √ √
01 Concrete structure √ √ √ √
01 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
03 Concrete √ √ √ √
119 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Concrete construction √ √ √ √ W
5.10.11~
Table
√ √
5.10.14
Table
√ √
5.10.15
02 Masonry works √ √ √ √
01 Infill wall masonry √ √ √ √
01 Infill wall masonry √ √ √ √ Table 5.9.5
03 Building decoration √ √ √ √ √
01 Ground √ √ √ √
01 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.12.1~
Table
√ √
5.12.10
02 Surface layer √ √ √ √
120 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Surface layer √ √ √ √
5.12.11~
Table
√ √
5.12.28
02 Plastering √ √ √ √
01 General plastering √ √ √ √
Table
01 General plastering √ √ √ √
5.13.1
121 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
04 Veneer (brick) √ √ √ √
01 Facing brick pasting √ √ √ √
Table
01 Facing brick pasting √ √ √ √
5.17.2
05 Finishing √ √ √ √
01 Waterborne paint finishing √ √ √ √
Table
01 Waterborne paint finishing √ √ √ √
5.19.1-
Table
√ √
5.19.3
06 Suspended ceiling √ √ √ √
01 Concealed keel ceiling √ √ √ √
Table
01 Concealed keel ceiling √ √ √ √
5.15.1
04 Building roof √ √ √ √
00 01 Roof leveling layer √ √ √ √
122 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table 5.22.
01 Roof leveling layer √ √ √ √
1
02 Roof insulation √ √ √ √
Table
01 Roof insulation √ √ √ √
5.22.2
123 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
124 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
125 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
fittings 5.25.4
126 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
03 Fan installation √ √ √ √
Table
01 Fan installation √ √ √ √
5.27.7
127 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
128 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
02 Formwork removal √ √ √ √
5.10.6
129 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Steel bar processing √ √ √ √
5.10.7
Table
02 Steel bar installation √ √ √ √ H
5.10.9
Table
02 Concrete construction √ √ √ √ W
5.10.11
06 Channel cushion √ √ √ √
Table
01 Cushion √ √ √ √ 5.12.2-Table
5.12.7
07 Channel formwork √ √ √ √
01 Formwork installation √ √ √ √ Table 6.8.1
130 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
08 Trench reinforcement √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
09 Trench concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
02 Concrete construction √ √ √ √ W
5.10.11
11 Cover reinforcement √ √ √ √
Table
01 Reinforcement project √ √ √ √
11.4.10
12 Cover concrete √ √ √ √
Table
01 Cover concrete project √ √ √ √
11.4.11
131 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
13 Cover installation √ √ √ √
Table
01 Cover installation √ √ √ √
11.4.13
02 Main structure √ √ √ √ √
01 Concrete structure √ √ √ √
01 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
5.10.1
Table
02 Formwork removal √ √ √ √
5.10.6
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.10.7
02 Steel bar installation √ √ √ √ H Table
132 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.10.9
03 Concrete √ √ √ √
Raw materials and mixing ratio of Table
01 √ √ √ √
concrete 5.10.10
Table
5.10.11-
02 Concrete construction √ √ √ √ W
Table
5.10.14
Table
Concrete structure appearance and size 5.10.12-
03 √ √ √ √
deviation Table
5.10.15
02 Masonry works √ √ √ √ √
01 Masonry project √ √ √ √
Table
01 Brickwork √ √ √ √
5.9.1
钢结构
03 √ √ √ √
Steel structure
Installation of steel components (crane
01 √ √ √ √
booms, monorails and tracks)
133 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
03 Building decoration √ √ √ √ √
01 Ground √ √ √ √
01 Grassroots √ √ √ √
Table
5.12- -
01 Grassroots √ √ √ √
Table
5.12.10
02 Surface layer √ √ √ √
Table
5.12.11-
01 Surface layer √ √ √ √
Table
5.12.28
02 Plastering √ √ √ √ √
01 General plastering √ √ √ √
Table
01 General plastering √ √ √ √
5.13.1
134 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
135 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
5.19.5
04 00 Roofing project √ √ √ √ √
01 Roof leveling layer √ √ √ √
Table
01 Roof leveling layer √ √ √ √
5.22.1
02 Roof insulation √ √ √ √
Table
01 Roof insulation √ √ √ √
5.22.2
03 Roof rolled waterproofing layer √ √ √ √
Table
01 Roof rolled waterproofing layer √ √ √ √
5.22.3
Architecture electric √ √ √ √ √
Indoor electrical installation
01 √ √ √ √
project
Installation project of lighting
01 √ √ √ √
distribution box
Table
01 Installation of lighting distribution box √ √ √ √
5.26.1
Installation project of wire and cable
02 √ √ √ √
conduit
136 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Installation of wire and cable conduit √ √ √ √ H
5.26.3
03 Insertion project of wire and cable √ √ √ √
Table
01 Insertion of wire and cable √ √ √ √
5.26.4
04 Insulation test project of wire and line √ √ √ √
Table
01 Insulation testing of wire and line √ √ √ √ √
5.26.6
05 Ordinary lighting installation project √ √ √ √
Table
01 Ordinary lighting installation √ √ √ √
5.26.19
06 Special lighting installation project √ √ √ √
Table
01 Special lighting installation project √ √ √ √
5.26.8
Installation of switches, outlets, and
07 √ √ √ √
fans
Table
01 Switch and socket installation √ √ √ √
5.26.10
08 Test operation of building lighting √ √ √ √
Installation project of lightning
02 √ √ √ √
protection and grounding device
137 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Grounding device installation √ √ √ √
2.26.12
01 Grounding device installation √ √ √ √
Laying of lightning protection down
02 √ √ √ √
conductor laying
Table
Laying of lightning protection down
01 √ √ √ √ W 5.26.13-
conductor laying
Table 5.26.14
138 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
139 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
05 Cushion √ √ √ √
Table
01 Cushion √ √ √ √
5.17.2
06 Formwork √ √ √ √
Table
01 Formwork installation √ √ √ √
6.10.1
07 Steel bar √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
03 Steel bar installation √ √ √ √ H
5.12.8
Table
08 Concrete √ √
5.12.1
01 Raw materials and mixtures of concrete √ √ √ √
Table
02 Concrete construction √ √ √ √ W
5.12.9
Concrete structure appearance and size Table
03 √ √ √ √
deviation 6.10.7
10 Foundation anticorrosion √ √ √ √
01 Anticorrosion √ √ √ √ Table
5.30.1-
140 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
5.30.7
02 Shell project √ √ √ √
01 Reinforced concrete wall √ √ √ √
Installation of concrete outer cylinder
01 √ √ √ √
formwork
Installation of concrete outer cylinder Table
01 √ √ √ √
formwork 6.10.10
02 Steel bar √ √ √ √
Table
01 Steel bar processing √ √ √ √
5.12.6
Table
02 Steel bar installation √ √ √ √ H
5.12.8
03 Concrete √ √ √ √
Table
01 Raw materials and mixtures of concrete √ √ √ √
5.12.9
Table
02 Concrete construction √ √ √ √ W
5.12.10
Concrete structure appearance and size Table
03 √ √ √ √
deviation 6.10.15
02 Brick lining project √ √ √ √
01 Acid resistant brick masonry √ √ √ √
141 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
Table
01 Brick masonry √ √ √ √ W
6.10.16
06 Lining and insulation layer √ √ √ √
Brick lining (cylinder) and insulation
01 √ √ √ √
layer
Brick lining (cylinder) and insulation Table
01 √ √ √ √ W
layer 6.10.28
06 Ancillary facilities project √ √ √ √
Fabrication of external steel ladders and
00 01 √ √ √ √
platforms
Fabrication of external steel ladders and Table
01 √ √ √ √
platforms 5.13.1
Installation of external steel ladder and
02 √ √ √ √
platform
Installation of external steel ladder and Table
01 √ √ √ √
platform 5.13.19
07 Aviation sign √ √ √ √
Table
01 Aviation sign √ √ √ √
6.10.69
08 Lightning protection facilities √ √ √ √
01 Lightning protection facilities √ √ √ √ W Table
142 / 143
Mongolia Buuruljuut Project #1 Unit & Public System Installation Project Civil Engineering Construction Quality Acceptance Items Division Table
6.10.70
09 Lighting facilities √ √ √ √
Whole-set distribution cabinets and Table
01 √ √ √ √
control cabinets 5.33.1
10 Door and window project √ √ √ √
Installation of metal doors and Table
01 √ √ √ √
windows 5.20.2
Note: 1. Divided according to DL/T5210-2021 "Code for Construction Quality Acceptance and Evaluation of Electric Power Construct - Part 1: Civil Construction project”;
2. The final version will be adjusted and improved after the on-site construction drawings are approved.
143 / 143