You are on page 1of 20

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF

15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 1 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;

DESIGN INFORMATION
Eurocode 2: Design of concrete structures - Part
Relevant Codes 1-1: General rules and rules for
buildings (NEN-EN 1992-1-1)
Design stresses
EN 1992-1-1:2004(E)-Sec 3.1.2 fck = Characteristic Cylinder strength of concrete at 28 days =
EN 1992-1-1:2004(E)-Sec 3.2.2 fyk = Characteristic strength of steel
EN1992-1-1:2004(E)-Sec2.4.2.4 γc = partial safety factor for concrete =
γs = partial safety factor for steel =
αcc = coefficient of long term effect on strenght =
EN 1992-1-1:2004 (E)-Sec 3.6.1 Design compressive strenght of concrete; fc.d = αcc*fck/γc =
EN 1992-1-1:2004 (E)-Sec 3.6.1 Design tensile strenght of steel; fy.d = fyk/γs =
fctm = mean tesile strength of concrete = 2.6
Fire Resistance
Exposure condition Exposure condition XD1 (Moderate Humidity)
Structural class 2 (S2) , (Min. cover due to Environmental condition Cmin =

EN 1992-1-1:2004 (E)-Sec 4.4.1 Nominal cover; cnom = cmin +∆cdev =


Table 4.4N Beam and Column(mm) =
Nominal cover; cnom = cmin +∆cdev
Foundation(mm) = 50 mm
slab depth------- 175 mm
Beam width 225 mm
soil Condition Allowable soil bearing capacity = 100

General Loading condition


Variable action, Qk = 1.00
Finishes (screeding and felting) Gk1 --= 3.38
Design Data
K' = 0.167
K= M/(fckbd2)< Kbal = 0.167
Reinforced Concrete Design, Bill z=d(0.5+sqr(0.25-K/1.134))
Mosley,John Bungey and Ray Hulse,
Seventh Edition As=M/(0.87fykZ)
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF
15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 2 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;


ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF
15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 3 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;

MEMBER REF. CALCULATION


Assumed Slab thickness (h) = 175 mm
i loading
Slab Design slab own load; Gk2 =(h*25kN/m2)--0.175*25 = 4.375
Finishes Gk1------------------------------- =
Total Permanent action Gk=
Variable action, Qk = 1.00 kN/m2
Design Load (n) = 1.35Qk+1.5Gk = 11.97

Parapet Loading
Parapet size = 0.7 m x 0.1 m
Parapet own load; w = 0.1*0.6*25kN/m3 = 1.75
Ultimate design load; P =1.35*w = 2.4 kN per m run

Roof Slab Moment And Shear Analysis ---- Section XX

2.4 kN
11.97 kN/m

RA 2.3425 2.3425

1.00 4.685
b s
3.3425

6.685

REACTION ESTIMATION
RA + RB = 84.739 where RA = RB
SHEAR FORCE AND BENDING MOMENT CALCULATION
SH and BM At section 0
Vx = -2.4 - 11.97 x , Mx = -2.4
V0 = -2.36 kN M0 = 0.00
V1.00 = -14.33 kN M1.00 =

SH and BM At section 1
Vx = 40 - 11.97 x
Mx = -2 x + 42.37 (x-b) + 5.984625 x2
V1.00 = 28.0 kN M1.00 =
V5.685 = -28.0 kN M5.685 =
At V = 0 x = 3.3425 Moment is Maximum
NGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF A
15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 4 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;

MEMBER REF. CALCULATION

V3.3425= 0.0 kN M3.3425 = 24.5

SH and BM At section 5.685


Vx = 82.4 - 11.97 x
Mx = -2 x + 42.37 (x-b) + 42.4 (x-b-s) + 5.98
V5.70 = 14.3 kN M5.685 =
V6.70= 2.36 kN M6.685 =

SHEAR FORCE DIAGRAM


x ### 128.0
1 3 6 5.7 6.685
SFD
######### 0.0### ### 2.4 14.3
-2.4 0.0
-14.3
-28.0

BENDING MOMENT DIAGRAM


8.3 8.3

0.0
BENDING MOMENT DIAGRAM
8.3 8.3

0.0

x ###### 1 1 3 5.7 5.685 6.2 7


BMD
######### 8.3### 8.3 8.3 0.0 0.0

-24.5

ROOF SLAB REINFORCEMENT DESIGN


i Reinforcement for Cantilever Section
Assumed bar dia = 12 mm
Effective depth(d) =h-c-ɸ/2 = 175 -25-12/2 =
Applied Moment; M = 8.35 kNm
Bill Mosley,John K = M/(fckbd2) = 0.020 < K' (0.167)
Bungey and Ray
Hulse, Seventh Edition OK Section is singly reinforced
Reinforced z=d(0.5+sqr(0.25-K/1.134)) = 141.3971251 mm
Concrete Design, to
Eurocode 2 Since Z > 0.95d, Hence; Z = 136.8 mm
X = (d-Z)/0.45 = 16.0 mm
Areq = M/(0.87fykZ) = 169 mm2/m
Min. Reinforcement = 0.0013btd = 0.0013*1000*175=
Therefore, provide H 10 Bars @ 250 mm c/c Top (
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF
15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 5 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;

MEMBER REF. CALCULATION

ii Reinforcement for Span Section


Applied Moment; M = 24.49 kNm
K = M/(fckbd2) = 0.059 < K' (0.167)
OK Section is singly reinforced
z=d(0.5+sqr(0.25-K/1.134)) = 136.0631766 mm
Since Z > 0.95d, Hence; Z = 136.0631766 mm
X = (d-Z)/0.45 = 17.6 mm
Areq = M/(0.87fykZ) = 500 mm2/m
Min. Reinforcement = 0.0013btd = 0.0013*1000*175=
Therefore, provide H 12 Bars @ 150 mm c/c BOT. (

ROOF SLAB DEFLECTION CHECK


i Deflection for Cantilever Section
Deflection Check
ρ =100 As req/bd = 0.118 %
For fyk < 500N/mm2 ie 414 N/mm2
Basic span effective depth ratio; S =32*500/fyk 38.6473429951691
K = factor for structural system, for Cantilever =
Limiting Span/Effective depth ratio = KS =
Lx= 1 m
The actual basic span effective depth ratio; B = 1000
KS>B Hence the chosen effective depth is acceptable

ii Deflection for span Section


Deflection Check
ρ =100 As req/bd = 0.35 %
2
For fyk < 500N/mm ie 414 N/mm2
Basic span effective depth ratio; S =28*500/fyk 33.8164251207729
K = factor for structural system, for 2 way span slab =
Limiting Span/Effective depth ratio = KS =
Lx= 4.685 m
The actual basic span effective depth ratio; B = 4685
KS>B
BEAMHence the chosen
LOADING, effective
ANALYSIS AND depth is acceptable
DESIGN.

Beam Gridline A-C Assumed Beam size 450 X 225 mm


Loading
Slab Load on beam =
Beam own load = 0.45x0.225x25x1.35=
Finishes ---------------------------------- =

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF


15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 6 of 16


ITEM
XXX

LOCATION AJAOKUTA PLANT;

MEMBER REF. CALCULATION

Beam Gridline A-C


Note: ULS Slab load is inclusive of live load
15.9

4.685
A
Designed as Simply supported
Span Moment MAB = 0.125wl2=0.125*15.9*4.685^2=

0
BENDING MOMENT DIADRAM
DIST 0 2 5
BMD 0### 0

-
43.5868738
919922

Assumed bar dia of = 16 mm Assumed link dia =


Effective depth(d) =h-c-ɸ/2 = 450 -50-16/2-ɸlink=
Span beff =0.2[0.5(L-bw)+0.1L] < 0.2*(L)
beff =bw+0.2[0.5(L-bw)+0.1L] = 1139.5 mm , bw+0.2L = 1162
beff = 1140 mm M= 43.6 kNm
Reinforced Concrete
Design, Bill z= 380 mm As = 319
Mosley,John Bungey Minimum Reinforcement A =0.26*f /f * b d=
s,min ctm yk t
and Ray Hulse,
Seventh Edition Provide 4 H 12 mm btm ( 453 )mm2
Shear
Shear force (VEd) = 0.5x21.5*3.825 =

SHEAR FORCE DIAGRAM


DIST 0.0 2.3 4.7
37.2

SFD ### 0.0 ###

Assuming angle θ = 22 0 , cot θ = 2.6


Crushing strength VRd,max 0.124bwd(1-fck/250)fck =
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF
15KM SPUR
Doc. Title: STRUCTURAL CALCULATION LINE OF
REPORT FORAKK GAS PIPELINE
ACCOMMODATION PROJECT
BUILDING FOR PE
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 7 of 16


ITEM

LOCATION AJAOKUTA PLANT;

MEMBER REF. CALCULATION


VRd,max > VEd OK
Asw = VEd
= 0.12
= 0.12
s 0.78dfykcotθ
Using table A.4 in the Appendix
Provide 8mm links at 300mm centres, Asw/s =
Beam Gridline 1-4

Beam Loading:
w
Slab Load = 10.47
Beam load = 3.42
13.89
Moment Generated as a results of cantilever load from slab = wl2/2 8.35
kN
13.89 kN/m

8.3 kN-m 3.225 m 2.425 4.505


10.155 m
1 2 3

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF


15KM
Doc. Title: STRUCTURAL SPUR LINE
CALCULATION OF AKK
REPORT FOR GAS PIPELINE PROJECT
ACCOMMODATION BUILDING FO
Doc. No: 0027-OSL-OAS1-CI-SPC-XXXX FRAZIMEX NO: FEL/NPC/AKK/XX/XXX

EMPLOYER: NIGERIAN NATIONAL PETROLEUM CORPORATION Page 9 of 16


ITEM

LOCATION PLANT;

MEMBER REF. CALCULATION


D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 1 of 16 REV:R01

MS-TGS

ION

20 N/mm2
414 N/mm2
1.5
1.15
1
13.33 N/mm2
360 N/mm2
2.6 N/mm2

nvironmental condition Cmin = 15 mm


15 + 10 = 25 mm (slab)

40 + 10 = 50 mm (beam)

100 kN/mm2 at 1.0m depth(Assumed)

1.00 kN/mm2
3.38 kN/mm2
D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 2 of 16 REV:R01

MS-TGS
D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 3 of 16 REV:R01

MS-TGS

ON OUTPUT

4.375 kN/m2
3.38 kN/m2
7.755 kN/m2

11.97 kN/m per m run

1.75 kN/m

2.4 kN

2.3425 RB

1.00
e

RA = 42.4 kN
0 < x < 1.000
-2.4 x - 5.984625 x2
0.00 kNm
-8.35 kNm

1 < x < 5.685

-8.35 kNm
-8.34712500000001 kNm

D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X


PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 4 of 16 REV:R01

MS-TGS

ON OUTPUT

24.5 kNm

5.685 < x < 6.685

5.98 x2
-8.347 kNm
0 kNm

IAGRAM

14.3

2.4

-28.0

T DIAGRAM
8.3

0.0
T DIAGRAM
8.3

0.0

144 mm

n is singly reinforced
0.95d = 136.8 mm

Provide H10
228 mm 2
at 250mm c/c
314 )mm /m
2 btm(314mm2/m)
D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 5 of 16 REV:R01

MS-TGS

ON OUTPUT

n is singly reinforced
0.95d = 136.8 mm

Provide H12
228 mm2 at 150mm c/c
754 )mm2/m btm(754mm2/m)
38.6473429951691
0.4
38.64734299517 x 0.4 = 15.45894

1000 / 144 = 6.94

33.8164251207729
1
33.81642512077 x 1 = 33.81643

4685 / 144 = 32.53

Beam Size
450 X 225
11.97 kN/m
3.417188 kN/m
0.5 kN/m
Total 15.88644 kN/m
D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 6 of 16 REV:R01

MS-TGS

ON OUTPUT

15.9 kN/m

C
685^2= 43.59 kNm

DIADRAM
0

Assumed link dia = 8 mm


384 mm
< b1=0.5(L-bw)
mm b1 = 2230 mm
kbal= 0.01
319 mm
2

141.08 mm2 Provide 4 H 12


)mm 2
> 319 mm2 OK mm bottom

37.2 KN

AGRAM

-37.2

. kN
D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X
PIPELINE
ODATION PROJECT
BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 7 of 16 REV:R01

MS-TGS

ON OUTPUT
Provide R8@
300mm c/c
0.335 as links

kN/m
kN/m
kN/m
kN-m

4.505 m 8.35 kN-m

D COMMISSIONING OF A 40” X 303.4KM MAINLINE AND 24” X


PIPELINE PROJECT
OMMODATION BUILDING FOR PERSONNEL
O: FEL/NPC/AKK/XX/XXX

Page 9 of 16 REV:R01