附件1-1
印尼区域方案报审清单(2021年试行版)
REVIEW & ENDORSEMENT DEPARTMENT
SUBMISSION BY (Complete the approval
INDEX Number METHOD STATEMENT TYPE process of each department 2 days before Project Department EMD REMARK
REGION
类型 序号 方案名称 the process construction) (5 working days review) AUTHORITY (5 working days review) 备注
(5 working days review)
上报时间(工序施工前2天完成各部门审批流程) 项目部 政府单位 工程管理部 (5个工作日审阅
监理单位(5工作日审核)
(5工作日审核) )
Site Mobilization & Traffic Management
1 √ √
现场调运及交通施工方案
Fire Prevention Plan for Construction
临时消防施工方案
2
a. High Rise - with riser technical calculations (高层) √ √ √
b. Low Rise √ √ √
Emergency Fire Plan
3 √ √ √
消防应急预案
Epidemic prevention work plan
4 √
防疫工作方案
5 Safe usage of PPE (Personal Protective Equipments) according to trade √ √ √
Temporary electrical supply and distribution drawing plan
6 √ √ √
临时用电工程施工方案
Excavation works for foundation, utilities, drainages and road works
土方开挖施工方案 ,市政预埋设备,市政管网及道路
7
a. Less than 4m depth 深度少于4米 √ √ √
b. Depth of 4m and above 深度多于4米 √ √ √
Incident/Accident Management and Rescue Mitigations
8 √ √ √
安全生产事故应急救援预案
Occupational Safety and Health Management Program
9 √ √ √
职业健康安全管理及防疫工方案
Falsework Scaffold Installing & Dismantling Method Statement (PE
10 Endorsement) √ √
模板工程施工方案
Internal Scaffold Method Statement (PE Endorsement) Low Height <15m
11 √ √
高大模板(室内)工程施工方案 <15米高