You are on page 1of 5

Vender Name :

N100 Report Sheet


ANCHOR

You are requested to submit this sheet by ( / / ) Issued on :

ATTN : AKEBONO BRAXE ASTRA VIETNAM Issued by :

1, Parts name : BOLT,FLANGE 2, Part no : 60-41302-54130 3, Specified characteristics


Safty related parts Q

4, General schedule & delivery plan : Exhaust gas relsted parts E

(Full trial prod date : (Part delivery/Q'ty : )

(Mass prod date : (Part delivery/Q'ty : )

Cold Thread Heat Surface Final


Process Inspection Full review Package
heading rolling treatment treatment inspection

Mold        
co nfirma tio n
Final process

Process        

Inspection Jig        

Process Jig        

Defect ratio target % 0.20% 0.02% 0.02% 0.03% 0.03% 0.00% 0.00% 0.00%
Ca pability
Process

Actual defect ratio % 0.23% 0.02% 0.02% 0.02% 0.02% 0.00% 0.00% 0.00%

Estimeted cycle time 70sec 2sec 1sec 0.7sec 0.89sec 2sec 0.86sec 1.1sec

Actual cycle time 60sec 1sec 1.1sec 0.5sec 0.88sec 2sec 0.85sec 1.1sec
Materia l

SCM435
Specs PP-N5 Ø5.8
SCM435
Actual PP-N5 Ø5.8

Drawing Rev.No - X

QCPC        
Docum ent

Operation standard        

Check sheet        

Inspection s tandard        

Packing std 
N100 Result : (Problem report must be attched together)
Concerned Issues :
Comments :

6, Judgment to transfer to FPT (Possible/Possible with the bellow condition)

(Conditon)

General responsible person QA responsible person Production responsible person

( / / ) ( / / ) ( / / )
Submission
( / / ) (Comments)

Approved Checked Person in change ………………………………………………..


………………………………………………..

………………………………………………..
( / / ) ( / / ) ( / / ) .........................................................................
Người bán:
N100 Report Sheet
ANCHOR

You are requested to submitt this sheet by ( / / ) Issued on :

ATTN : YAMAHA MOTOR VIETNAM CO..LTD. Issued by :

1, Parts name : BOLT,FLG 2, Part no : 90105-108A6 3, Specified characteristics


Safty related parts

4, General schedule & delivery plan : Exhaust gas relsted parts


(Full trial prod date : (Part delivery/Q'ty : )

(Mass prod date : (Part delivery/Q'ty : )

Cold Thread Heat Surface Final


Process Inspection Machining Full review Package
heading rolling treatment treatment inspection

Mold         
confirmation
Final process

Process         

Inspection Jig         

Process Jig         

Defect ratio target % 0.20% 0.02% 0.05% 0.02% 0.03% 0.03% 0.00% 0.00% 0.00%
Capability
Process

Actual defect ratio % 0.40% 0.02% 0.05% 0.02% 0.02% 0.02% 0.00% 0.00% 0.00%

Estimeted cycle time 45sec 2sec 3sec 1sec 0.7sec 0.89sec 2sec 0.86sec 1.1sec

Actual cycle time 50sec 1sec 2sec 1.1sec 0.5sec 0.88sec 2sec 0.85sec 1.1sec
S45C
Material

Specs PP-N5 Ø9.82


S45C
Actual PP-N5 Ø9.82

Drawing Rev.No 01FW81 X

QCPC         
Document

Operation standard         

Check sheet         

Inspection standard         

Packing std 
N100 Result : (Problem report must be attched together)
Concerned Issues :
Comments :

6, Judgment to transfer to FPT (Possible/Possible with the bellow condition)

(Conditon)

General responsible person QA responsible person Production responsible person

( 01 / 05 /2017 ) ( 01 / 05 /2017 ) ( 01 / 05 /2017 )


Submission
( / / ) (Comments)
………………………………………………..
Approved Checked Person in change
………………………………………………..
………………………………………………..
( / / ) ( / / ) ( / / ) .........................................................................
n:

istics
Q

parts E

view Package

% 0.00%

% 0.00%

ec 1.1sec

ec 1.1sec

…………..
…………..
…………..
..............

You might also like