Administration
Document Installation and Technical Data
Doc. number 539.1256/02 Language English
Edition date 06. May 2003 Version 2.03
File via Internet
Created with FrameMaker 6.0
Version
Edition Description Date
1.00 1st version 28.01.2000
2.00 2nd version 19.07.2001
2.01 Boring Plan updated 15.08.2002
2.02 Section 4.3 updated 19. February 2003
2.03 Correction Alarm Cable pages 22 and 23 06. May 2003
Contents
4 Requirements ......................................................................11
4.1 List of components .......................................................................11
4.2 Space requirements .....................................................................11
4.3 Floor load factor ...........................................................................13
4.4 Access route ................................................................................13
4.5 Environmental conditions .............................................................14
4.6 Emissions .....................................................................................14
5 Installation ............................................................................15
5.1 Installing the TCR Twin Safe .......................................................15
5.2 Floor anchoring ............................................................................17
6 Connections .........................................................................18
6.1 Connection survey .......................................................................18
6.2 Pin allocation ...............................................................................19
7 Commissioning ..................................................................25
7.1 Starting up the system .................................................................25
The storage system for the banknotes is situated in the safe and is partly cov-
ered by the housing. The power supply and the main part of the controller is also
found inside of the safe.
The interface units for communication to the outside have been rear of the TCR
Twin Safe facing outwards. The ventilation slits are also positioned on this side.
They serve to disperse heat from the electronic components, and must not be
covered or blocked.
Options
As optional extensions can be added a safemaster coin and banknote storage
system (maximum 2 units), printer, divers burglar and robbery alarm systems
and a network interface unit.
Depending on the customers wishes, the TCR Twin Safe can be operated offline
or integrated into the EDP system.
Ventilation slits
Interface cables
Alarm cables
through opening in
bottom or on the back
Alarm system
An alarm system can also be integrated as an option. Connection to alarm
equipment can be made directly to the floor of the safe or at the rear alongside
the interface cables.
Top cover
A back end to the top cover is available as an option.
Top cover
back end
Illustration 3 TCR Twin Safe free standing with the rear top cover
2.1 General
Planning, realization and monitoring of the pre-installation procedures according
to the installation instructions incumbent to the corresponding bank or institute.
2.4 Ventilation
After the installation of the TCR Twin Safe, above and beside the ventilation slits
must be a ventilation shaft of minimum 50cm2 for the heat dissipation.
3 Installation Preparations
WARNING:
If the local house installation regulations requires an overcurrent circuit breaker
< 10A, then a separate mains connection with overcurrent circuit breaker and
earth-leakage circuit breaker will be necessary. As an overcurrent circuit breaker
a protection 10A is recommended. For safety reasons, no supplementary circuits
for non-relevant system devices etc. may be installed coming behind the power
surge circuit breaker, respective, residual current circuit switch.
Important The device will only be completely free of electricity when the mains power sup-
note ply plug is disconnected (unplugged). That is why the protected contact socket
must be clearly marked and have easy access to it at all times
Warning If the TCR Twin Safe is connected to an electrical power supply that is not
equipped with a direct earthed protection conductor, then the safe must be con-
nected directly to earth over a separate protected circuit conductor from the sys-
tem.
A connection for this protection circuit can be found on the rear side of the safe
next to the mains power supply connection.
L1
L2
L3
N
SL
Twin Safe2
Building boundary
power consump- 60 75
tion standby W @
230V
On/Off TCR Twin Safe and options (printer, Safemaster) must be able to be switched on
and off over a central on/off switch.
Transport route • The transport routes for delivery of the device are free. (the clear width
and height dimensions as well as the condition of the floor surface
including, landings, steps etc. have all been taken into account).
• The pre-installation requirements, especially environmental proce-
dures corresponding to dust emissions have all been completed.
Location site • Floor at location site has sufficient load factor, page 13.
• All on-site preparations have been completed.
• The location site is free, easily accessible and clean.
• All environmental conditions for operation can be met, page 14.
Electrical • FI-Switch (power protection switch), power surge circuit breaker and
connections mains supply connection have been installed and are ready for opera-
tion, page 24-18.
• The cabling procedures have been completed, page 18. All necessary
and various cable connections have been connected.
• All fuses (power overflow interrupt) and the mains power supply are
ready for operation.
UPS • The device can be linked to a uninteruptable power supply UPS. The
TCR Twin Safe cannot be directly governed by a UPS, therefore the
UPS must have an optical or/and acoustic alarm when the power is
down. after the occurence of such a signal no new transaction must be
launched. The UPS musst meet the following requirements:
nominal tension 230 V mains.
Reactive nominal power leistung 1000VA
Maximal power output 700W
Maximal current 4,3 A.
time to switch over < 4ms
minimal capacity at full power output: 5 min.
The recreation time after a power down musst be as short as possible.
4 Requirements
• The rear cover of the housing can be removed, i.e. for furniture form
installation or to make use of its area surface.
• The removal of the top cover must not be obstructed in any, i.e by fur-
niture fittings or parts.
• The sliding doors of the output compartment must be freely accessible
from both sides.
• The deposit compartment also be freely accessible from both sides.
• There must also be sufficient space available for opening up the safe
housing cover.
ATTENTION
Damage to installation cables.
‰The TCR Twin Safe must not be installed or placed over any cable
channels.
• Packing dimensions
:
– Length = 1240 mm
– Width = 1000 mm
– Height = 1000 mm
• The access route to the location site must not have any weaknesses
over the complete route regarding channels, landings or any other sim-
ilar obstacles etc.
4.6 Emissions
ATTENTION
Damage to the TCR Twin Safe.
‰Ventilation of the TCR Twin Safe must always be guaranteed.
‰Please consult corresponding on-site diagram 539.0011/01.
• Heat dissipation
See maximum electrical consumption = 228 W, standby =75W / with-
drawal = 201 W / deposit = 228 W. The intensity of transaction
depends a lot on the location. Avarage values have to be estimated
depending on the location.
1 withdrawal
deposit
2
standby
3
5 Installation
Carpet bumps, cable channels and any other weakness factors of the floor must
be bridged over with strong and stabile sheet metal panels.
The TCR Twin Safe can be moved by simple means such as metal rods or
wooden planks from off the palette and on to the fork-lift truck.
Another possibility is the so called Bimobil that can be slid from the side under
the edge of the safe. Using hydraulics the safe can then be raised or moved into
position.
Difficult floor surfaces such as carpets, tiles etc. must be protected by placing
cardboard cartons over them. Whenever roll types of transport are used pay
attention that the weight mass is concentrated on as little an area as possible in
order to reduce the chances of damage occurring to the floor or its coverings.
Maneuver the TCR Twin Safe with its conducting antistatic mat into position and
then cut away the overlapping rest of the mat using a carpet knife. Please make
sure that no damage has happened to the floor or its under coverings.
max. screw
height 30
190
61
43
d = 45
155 155
95 95
190
310
UL 291 Safe
6 Connections
Please note Customer option: Fusible mains cable Article No. 533.7279
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Empty
2 Empty
3 Empty
4 Printer
5 Reserve
6 Modem
7 Alarm (I/O)
8 Bank alarm separate
9 Terminal 1
10 Terminal 2
11 Safemaster left
12 Safemaster right
13 Mains connection
1 free 5 GND
2 RxD 6 free
3 TxD 7 RTS
4 free 8 CTS
1 free 5 GND
2 RxD 6 free
3 TxD 7 free
4 free 8 free
10 Acknowledge 16 Printer_init
11 Busy 17 Select
13 Select
1 free 6 DSR
2 TxD 7 GND
3 RxD 8 DCD
4 RTS 20 DTR
5 CTS 22 RI
If the data line must be extended in basic applications, then screened cables
with pre-screened screws of the same quality used on the TCR Twin Safe must
be used. Otherwise the emission and immunity tolerance levels can not be guar-
anteed against existing regulations.
Alarm old version old version, cable without connector with 8 wires
see also SHB chapter 3 MCU for the signification of the jumpers
from MCU
wire Jumper
Signal Function / connector
color on MCU
Alarm new version New version consiting of two cables without connector, one with 8 wires and one
with 4 wires.
from MCU
Note see also SHB chapter 3 MCU for the signification of the jumpers
4-wire cable
wire Jumper
Signal Function / connector
color on MCU
8-wire cable
wire Jumper
Signal Function / connector
color on MCU
Note see also SHB chapter 3 MCU for the signification of the jumpers
active
passive / default
passive
active / default
Illustration 15 System drawing bank alarm for Jumper X18 resp. X19
In the active position two jumpers sit adjacent on X18.
In the passive position one jumper sits in the middle position on X18.
7 Commissioning
Note Between installation and the first commissioning of the TCR Twin Safe
there must be a time interval in order to allow the temperature of the
device to adapt to the environmental temperature of the on-site location
(approx. 12 hours).
• Slide in the chassis until the stop point in the safe has been reached.
The mechanical locking unit must have been visually and audibly
engaged. The safe door is open.
• The TCR Twin Safe is connected to the mains. In the operating posi-
tion (door switch has been turned to the service position with the spe-
cial key) a start-up test will be automatically carried out:
– TCR Twin Safe will perform a function test, during this test the sys-
tem data and counter positions will be loaded into the system.
– As soon as the optional journal receives the message:
Bank Supersafe
Beispielsweg 007
CH 9999 Musterwil
0041 31 999 1111
TS_MCU (Main Control Unit)
1.62 Package 21 (11.1.2000)
then the function test has been successfully completed and the safe door
can now be closed. If there is no printer available, make one note deposit
and one note withdrawal procedure at each individual RSM.
• The TCR Twin Safe is now ready for operation using the user levels
available and the terminal software.
8 Technical Data
power consump- 60 75
tion standby W @
230V
No. of Mass L1 L2 H1 H2 W A
Safe Type
RSMs kg mm mm mm mm mm m2
A Area of Base
H1 Total height
H2 Height of the safe
L1 Total length
L2 Length „underneath the counter“
9 Further documentation
Document Doc-No.