PLN PUSAT MANAJEMEN PROYEK
PT PLN (Persero)
REVIEW FOR APPROVAL OF DRAWINGS / DOCUMENTS
DRAWINGS / DOCUMENT NUMBER
CCR OUT DATE
| 2-1-2019
: DRAWINGS / DOCUMENTS TITLE
PLN |_REV. CONTRACTOR REV, STATUS
~ FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL UPS
IKCPO-YYB-G-05-065 0 AND BATTERY
KALSELTENG 2 CFSPP (2x100 MW)
‘COMMENT ‘COMMENT
PLN COMMENTS CONTRACTOR RESPONSE
No. No.
1 ‘Approved
Review by: i Date: ayia |
Vac Vioey 2-1 = Joi} _| response by | Date sien
Approvedby: Yiu: UM Date gs
+‘CONTRACTOR DOCUMENT REVIEW : a
tog [LI care S| evecr _
Co oa i
‘A |] appRoven SUPORT
8 21 APPROVED AS NOTE CONTRACTOR
¢[E1 nor approven. RECORO
1_ET INFORMATION 2 | workinc pocumenr
TVET aT TROVE é ~
eae a :
By DATE 8 al
L0G [DATE
‘out [conmino. -
Issued For Approve {GAQC CONSORTIUM PUSMANPRO
DESCRIPTION PREPARED & CHECKED [APPROVED
PT. PLN ( PERSERO }
JI. Trunojoyo Blok M 1/195. Kebayoran Baru Jakarta 12610
Phone : #62-21-7261875 7261122 7262204 Fax: +62-21-7221330
e-mail: vebmasier@pin cod
Contract Agreement No. 1594 PJ/DAN.02.01/DIR2016
PROJECT
KALSELTENG 2 CFSPP(2x100MW)
PT. PLN ( PERSERO ) PUSAT MANAJEMEN PROYEK
FN = = —— —
pocno. L110] 1] +] 8] 8] - [oj 0] -[¢]-Jo] s]- [y]y]s]-[o]6]s|- [o/s]- [ojo]
‘CONTRACTOR.
CONSORTIUM OF
PT TRUBA JAYA ENGINEERING- HYUNDAI ENGINEERING CO. LTD.- ITOCHU CORPORATION
Pagans
res Ayunoal STOGWS
‘SUB CONTENDOR Rev
OC. NO.
PREPARED & DATE TITLE
(CHECKED BY DEC-27-2018
DATE FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS
aaa eZ AND BATTERY
consorniom, | $e)
—____| (* | _ __
APPROVED DATE CONTRACTOR DOCUMENT NUMBER,
PLN IKCPO-YYB-G-05-065.PROIECT
KALSELTENG 2 CFSPP(2x100MW)
CONTRACTOR DOG.NO.
IKCPO-YYB-G-05-065
CONTRACTOR
Taba
AHyunoR!
ena
TE
FIELD INSPECTION AND TEST PLANS FOR
ELECTRICAL UPS AND BATTERY
TABLE OF CONTENT
COVER
TABLE OF CONTENT
INSPECTION AND TEST PLANS FOR UPS AND BATTERY
ATTACHMENT (Inspection & Test Report Form)
- Ups and battery
TESUED OTE
DEC27-2016
REVISION
°
Page
aorwnnieenaey FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS AND cess | geal avwinon) 70
ona) BATTERY
JProrect | KALSELTENG 2 [contractor Ove. Ho. ICFO-YYB-G-05-065 fe
|orser (2xna0 mr) [Rem °
— pe ETH PW = WE SOT Ws BRO
Ba REET | eon ct pc 6
0 ‘esr 8 mstecnow a sept occmee | sem ca — | | tw
- = soot |eme | cen | Fen =
1 [prepanarion
114 Bocament Review
‘Contruction Orawing Technical Specticaton, [~
a Sat Oe, Vent ata
Lash see work Paced ha ej] ele
ee, undeso &impleertes Document contact | aoplcatteprceaure, | sts
crdngy Inoasoe rian O201/1%|agroed Grins vendor| Rene
~ 1.2.2, Material Receling Report & PI] Test Rest Certate 2016 ‘Spedicaron oon -
Sereno Cees orp co, Farce epee secon a fale
aie
71.3. Fale evan gees rev or
Proce a ge 7
2 [pxecuniow
‘21 UNINTERRUPTED POWER SUPPLY (UPS), BATTERY
214 __Unineroped Power Suply (UPS)
Bika nsalaton «fw lw
aaaa veal cn
bien ec
ital charge ord »i* fe
nal emare word on ce
Baad eck tona cnmeciow ocanee conc. . -
mee 0.1598 PY039. 0201/01) cnr] eRe | py wf ® js
aka Owed tena wg pnber CSFYOROROUE| ayevesroig, vera] MEREI" | ty | ier [ee
Proc., Manual Installation ‘Speciation w
“21.5 Ov pounding crveson x [ow | w
2.1.48 ten esc mebare ner ac
27 pase comecon uw | ew
Tia dk up w)aw
Petr et PUTED —_t a tow
Eani0 Sparen dein mn [oH
I Bina ote ts « [oenner PT. PLN (Persero), FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS AND Jormcs | Jpa7i7F aHYUNDM “aces
- BATTERY
rows astro? lesen Taare Sass Ez
\CFSPR a0 MW) re °
10 Tes even e reseteooamen | scesce one
Baa estoy
2a2 _ Gewbatey tina Tee
Bis Ceca cmecin cmnment conte «fw
teokatie ware
2a Chakra and way ner peaseizvonz cio penton nin | EEC | see » fw |
Proc., Manual instalation Specfarica
218 awk pewarine . «it~ lL
Bab _Celutage at ec i ale «fo |
“+ [bocunenrarzon
3A. Aldon te qed a pest al ced
soe arta et As xing ten etw |e
Damen Co
‘submit to Company or review 8 apa Noise ryDANGDOL/DI| | aopetie ramen, | topecen |
32 Align ar aos aan oe A a >t. be
Ate npecin ert aes rer nd sed
33" AINGR or devon cnr en sed rey > bw be
esosGANER | PROJECT
KALSELTENG 2 CFSPP(2x100MW)
CONTRACTOR DOG NO.
IKCPO-YYB-G-05-065,
CONTRACTOR | TLE
Take FIELD INSPECTION AND TEST PLANS FOR
0A ELECTRICAL UPS AND BATTERY
ATTACHMENT
TESUED DATE,
DEC-27-2018
REVISION
°PLN
UPP KALBAGTENG
KALSELTENG 2 CFSPP (2X100 MW)
Taba a wence
UPS AND BATTERY
Docno. Page:
Rev.no
AAG
ELECTRICAL
Description: Date Report no.
Location / Area: Other:
[Equipment /System no.
‘Sub System:
[Drawing No. ‘System:
No. Description acc | REY | NA REMARKS
urs
1 [Compare nample data with approved drawing
[Compare rating plate data with appraved drawing
[Check that perservation are good condition (no damage)
|Greck that equipment correctly positione, al
igment leveled,
rigid and secured in accordance with approved drawing
[Checkall orl mounted device naccorda0ce withaprov drawing
[Check all fuses rating in accordance with approved drawing
[Chekal cru breaks cating ascotdenee with approve deawong
[Check mechanical operations of all switch devices
[Check earthing connection
11 [check vendor supplied special toolsif available
Quality Control / Consortium
PT. PLN (PUSMANPRO)
PT. PLN (UPP Kalbagteng)
Date: Date: Date:
laarrery
1 [heck cel eype and battery rating
2. |eneck battery installation
3_ [check that preservation are good condition (ne damage)
& [neck at mats and inks ave fited ightened
5_[eneck all eleceroyt® levels satisfactory (\fapplicable)
6 | check vendor supplied special tools ifavaiable
7” [eheck earthing connection [
[eked ehar al belts and nuts on battery racks ae protected aganet
leorrotion
Comment
ote: Fee "Pas applicable ‘Ace Aceptable ejected a Hot Appiah
Inspected Witness ApprovedQuality Control / Consortium
Date
PT. PLN (PUSMANPRO)
Date
PLN es
KALSELTENG 2 CFSPP (2X100 MW) hi ia AEN rrocuts
UPP KALBAGTENG
Tightning Check Pocno Page
Rev.no
_—_}
ELECTRICAL
Description: Date: Report no.
Location / Area Other:
Equipment ‘System no.
‘Sub System:
(Drawing No. System
BOLT WRENCH TORQUE RESULTS
No DESCRIPTION BOLT SIZE ay
SPEC. spec.(wm) | actuarcw.my| acc | N/A
\
Comment -
| — -
Inspected Witness Approved
PT. PLN (UPP Kalbagteng)
Date:PLN prone
KALSELTENG 2 CFSPP (2X100 MW) ATOCHY
UPP KALBAGTENG
INSULATION RESISTANCE TEST |Doc.no Page:
BUSBAR Revino
ELECTRICAL
Description: Date: Report no.
Location / Area: other:
Equipment /System no.:
[Sub System:
[Drawing Nos system:
Insulation — | Visual
E EMARKS
No. Resistance test | check | "Fl ®
1 R - Earth
2 S -Earth
3 T- Earth
4
R-T
$-T
Comment.
Note:Tick"\"as opplicable, __ ACC= Acceptable _Rej = Rejected
Inspected Witness Approved
Quality Control / Consortium PT. PLN (PUSMANPRO) PT. PLN (UP Kalbagteng)
Date: Date: Date: