You are on page 1of 9
PLN PUSAT MANAJEMEN PROYEK PT PLN (Persero) REVIEW FOR APPROVAL OF DRAWINGS / DOCUMENTS DRAWINGS / DOCUMENT NUMBER CCR OUT DATE | 2-1-2019 : DRAWINGS / DOCUMENTS TITLE PLN |_REV. CONTRACTOR REV, STATUS ~ FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL UPS IKCPO-YYB-G-05-065 0 AND BATTERY KALSELTENG 2 CFSPP (2x100 MW) ‘COMMENT ‘COMMENT PLN COMMENTS CONTRACTOR RESPONSE No. No. 1 ‘Approved Review by: i Date: ayia | Vac Vioey 2-1 = Joi} _| response by | Date sien Approvedby: Yiu: UM Date gs + ‘CONTRACTOR DOCUMENT REVIEW : a tog [LI care S| evecr _ Co oa i ‘A |] appRoven SUPORT 8 21 APPROVED AS NOTE CONTRACTOR ¢[E1 nor approven. RECORO 1_ET INFORMATION 2 | workinc pocumenr TVET aT TROVE é ~ eae a : By DATE 8 al L0G [DATE ‘out [conmino. - Issued For Approve {GAQC CONSORTIUM PUSMANPRO DESCRIPTION PREPARED & CHECKED [APPROVED PT. PLN ( PERSERO } JI. Trunojoyo Blok M 1/195. Kebayoran Baru Jakarta 12610 Phone : #62-21-7261875 7261122 7262204 Fax: +62-21-7221330 e-mail: vebmasier@pin cod Contract Agreement No. 1594 PJ/DAN.02.01/DIR2016 PROJECT KALSELTENG 2 CFSPP(2x100MW) PT. PLN ( PERSERO ) PUSAT MANAJEMEN PROYEK FN = = —— — pocno. L110] 1] +] 8] 8] - [oj 0] -[¢]-Jo] s]- [y]y]s]-[o]6]s|- [o/s]- [ojo] ‘CONTRACTOR. CONSORTIUM OF PT TRUBA JAYA ENGINEERING- HYUNDAI ENGINEERING CO. LTD.- ITOCHU CORPORATION Pagans res Ayunoal STOGWS ‘SUB CONTENDOR Rev OC. NO. PREPARED & DATE TITLE (CHECKED BY DEC-27-2018 DATE FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS aaa eZ AND BATTERY consorniom, | $e) —____| (* | _ __ APPROVED DATE CONTRACTOR DOCUMENT NUMBER, PLN IKCPO-YYB-G-05-065. PROIECT KALSELTENG 2 CFSPP(2x100MW) CONTRACTOR DOG.NO. IKCPO-YYB-G-05-065 CONTRACTOR Taba AHyunoR! ena TE FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS AND BATTERY TABLE OF CONTENT COVER TABLE OF CONTENT INSPECTION AND TEST PLANS FOR UPS AND BATTERY ATTACHMENT (Inspection & Test Report Form) - Ups and battery TESUED OTE DEC27-2016 REVISION ° Page aor wnnieenaey FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS AND cess | geal avwinon) 70 ona) BATTERY JProrect | KALSELTENG 2 [contractor Ove. Ho. ICFO-YYB-G-05-065 fe |orser (2xna0 mr) [Rem ° — pe ETH PW = WE SOT Ws BRO Ba REET | eon ct pc 6 0 ‘esr 8 mstecnow a sept occmee | sem ca — | | tw - = soot |eme | cen | Fen = 1 [prepanarion 114 Bocament Review ‘Contruction Orawing Technical Specticaton, [~ a Sat Oe, Vent ata Lash see work Paced ha ej] ele ee, undeso &impleertes Document contact | aoplcatteprceaure, | sts crdngy Inoasoe rian O201/1%|agroed Grins vendor| Rene ~ 1.2.2, Material Receling Report & PI] Test Rest Certate 2016 ‘Spedicaron oon - Sereno Cees orp co, Farce epee secon a fale aie 71.3. Fale evan gees rev or Proce a ge 7 2 [pxecuniow ‘21 UNINTERRUPTED POWER SUPPLY (UPS), BATTERY 214 __Unineroped Power Suply (UPS) Bika nsalaton «fw lw aaaa veal cn bien ec ital charge ord »i* fe nal emare word on ce Baad eck tona cnmeciow ocanee conc. . - mee 0.1598 PY039. 0201/01) cnr] eRe | py wf ® js aka Owed tena wg pnber CSFYOROROUE| ayevesroig, vera] MEREI" | ty | ier [ee Proc., Manual Installation ‘Speciation w “21.5 Ov pounding crveson x [ow | w 2.1.48 ten esc mebare ner ac 27 pase comecon uw | ew Tia dk up w)aw Petr et PUTED —_t a tow Eani0 Sparen dein mn [oH I Bina ote ts « [oe nner PT. PLN (Persero), FIELD INSPECTION AND TEST PLANS FOR ELECTRICAL UPS AND Jormcs | Jpa7i7F aHYUNDM “aces - BATTERY rows astro? lesen Taare Sass Ez \CFSPR a0 MW) re ° 10 Tes even e reseteooamen | scesce one Baa estoy 2a2 _ Gewbatey tina Tee Bis Ceca cmecin cmnment conte «fw teokatie ware 2a Chakra and way ner peaseizvonz cio penton nin | EEC | see » fw | Proc., Manual instalation Specfarica 218 awk pewarine . «it~ lL Bab _Celutage at ec i ale «fo | “+ [bocunenrarzon 3A. Aldon te qed a pest al ced soe arta et As xing ten etw |e Damen Co ‘submit to Company or review 8 apa Noise ryDANGDOL/DI| | aopetie ramen, | topecen | 32 Align ar aos aan oe A a >t. be Ate npecin ert aes rer nd sed 33" AINGR or devon cnr en sed rey > bw be esos GANER | PROJECT KALSELTENG 2 CFSPP(2x100MW) CONTRACTOR DOG NO. IKCPO-YYB-G-05-065, CONTRACTOR | TLE Take FIELD INSPECTION AND TEST PLANS FOR 0A ELECTRICAL UPS AND BATTERY ATTACHMENT TESUED DATE, DEC-27-2018 REVISION ° PLN UPP KALBAGTENG KALSELTENG 2 CFSPP (2X100 MW) Taba a wence UPS AND BATTERY Docno. Page: Rev.no AAG ELECTRICAL Description: Date Report no. Location / Area: Other: [Equipment /System no. ‘Sub System: [Drawing No. ‘System: No. Description acc | REY | NA REMARKS urs 1 [Compare nample data with approved drawing [Compare rating plate data with appraved drawing [Check that perservation are good condition (no damage) |Greck that equipment correctly positione, al igment leveled, rigid and secured in accordance with approved drawing [Checkall orl mounted device naccorda0ce withaprov drawing [Check all fuses rating in accordance with approved drawing [Chekal cru breaks cating ascotdenee with approve deawong [Check mechanical operations of all switch devices [Check earthing connection 11 [check vendor supplied special toolsif available Quality Control / Consortium PT. PLN (PUSMANPRO) PT. PLN (UPP Kalbagteng) Date: Date: Date: laarrery 1 [heck cel eype and battery rating 2. |eneck battery installation 3_ [check that preservation are good condition (ne damage) & [neck at mats and inks ave fited ightened 5_[eneck all eleceroyt® levels satisfactory (\fapplicable) 6 | check vendor supplied special tools ifavaiable 7” [eheck earthing connection [ [eked ehar al belts and nuts on battery racks ae protected aganet leorrotion Comment ote: Fee "Pas applicable ‘Ace Aceptable ejected a Hot Appiah Inspected Witness Approved Quality Control / Consortium Date PT. PLN (PUSMANPRO) Date PLN es KALSELTENG 2 CFSPP (2X100 MW) hi ia AEN rrocuts UPP KALBAGTENG Tightning Check Pocno Page Rev.no _—_} ELECTRICAL Description: Date: Report no. Location / Area Other: Equipment ‘System no. ‘Sub System: (Drawing No. System BOLT WRENCH TORQUE RESULTS No DESCRIPTION BOLT SIZE ay SPEC. spec.(wm) | actuarcw.my| acc | N/A \ Comment - | — - Inspected Witness Approved PT. PLN (UPP Kalbagteng) Date: PLN prone KALSELTENG 2 CFSPP (2X100 MW) ATOCHY UPP KALBAGTENG INSULATION RESISTANCE TEST |Doc.no Page: BUSBAR Revino ELECTRICAL Description: Date: Report no. Location / Area: other: Equipment /System no.: [Sub System: [Drawing Nos system: Insulation — | Visual E EMARKS No. Resistance test | check | "Fl ® 1 R - Earth 2 S -Earth 3 T- Earth 4 R-T $-T Comment. Note:Tick"\"as opplicable, __ ACC= Acceptable _Rej = Rejected Inspected Witness Approved Quality Control / Consortium PT. PLN (PUSMANPRO) PT. PLN (UP Kalbagteng) Date: Date: Date:

You might also like