1.0 PURPOSE
This Procedure to purpose for blasting and painting will be carried out at in PT. PTM for
Mahakam Well Connection (Mechanical) – Tender B (Sub-Package 3) 4600006253 to
prevent corrosion on the external surface of steel by painting and coating.
2.0 SCOPE
This procedure cover the execution of blasting and painting for carbon steel piping, structure and
equipment for Project Mahakam Well Connections at CPU, NPU, SPU and Handil Base Contract
No. 4600006253.
3.0 DEFINITION
Company is PERTAMINA HULU MAHAKAM
Contractor is PT. PUTRA TUNGGAL MANDIRITAMA
Reference Title
5.0 RESPONSIBILITIES
5.1 Site Manager
Site manager is reporting to the Project Manager , he is also responsible for all blasting and
painting in the yard ,including work planning and ensure all the work are in with HSE Manual
and Company specification.
Document Number
Contract : 4600006253
ID-ALL-ALL-0102-520007-O-ALL-20-
Blasting and Painting Procedure Specification 004
E. Gloves as required
F. Dust Filter Mask as required
G. Respirator Mask as required
H. Ear Plug as required
I. Safety Goggles Each personnel
J. Safety Harness as required
6.1.5 Personnel Blasting & Painting Work
Following personnel are minimum required during blasting & painting Work per one
shift only for this project.
Blasting abrasive material shall be dry clean, and free from contamination
such as dust, dirt, clay and other extraneous matter and packed in hermetic
bags.
Blast cleaning shall not conduct on surface if there is a chance that the
atmospheric conditions getting wet after the completion of blasting.
Humidity check
Blotter test should be conducted and shall be performed and recorded, to
determine the compressed air supply contain water or oil.
6.2.1.2 Quality of Abrasives
Abrasives shall be sealed in watertight packaging. Any product delivered in
defective packaging shall be rejected. Product must be stored at shelter,
protected from rain and moistures.
Volcano sand to be used as abrasives
Conductivity of abrasive shall be less than 150 micron Siemens/cm as per
ASTM D 4940. Contamination including chlorides according to IDO 8502-6
and ISO 8502-9 : 30 mg/m2 maximum.
The use of Copper slag and silica sand is strictly prohibited.
6.2.1.3 Blast Cleaning
1
All surfaces to be coated shall be blast-cleaned according to:
a) The grade of cleanliness ( ISO 8501 standard )
Surface preparation shall be “near white blast cleaning” or grade of
Cleanliness SA 3. Grade of cleanliness SA 3 Visual can be compared
by ISO 8501-1: Pictorial surface preparation standards for painting
steel surfaces.
The surface profile Ra (Anchoring profile: G medium according to ISO
8503 standard. Roughness meter with adapted cut-off vision tactile
surface profile comparator).
After blast cleaning, all dust must be removed using a vacuum
cleaner before application of the paint in order to achieve the
maximum dust level 2 acceptable for each paint system (ISO 8502-
3). Dust level check shall be recorded.
All blast cleaned surface shall be coated before the deterioration of
the “Grade of Cleanliness”. In any surface that has been blast-
cleaned shall be primed on the same day, and before the
deterioration of the relevan “grade of cleanliness” at maximum 4
hours. Before painting works commence, checks for the
contamination of the surface by salts shall be carried out (ISO 8502-
1 6 & ISO 8502-9) plus ferrous contamination for stainless steel
surfaces.
Document Number
Contract : 4600006253
ID-ALL-ALL-0102-520007-O-ALL-20-
Blasting and Painting Procedure Specification 004
- Hand Brush and roller brush paint for stripe coat, touch up, or small
repair
- Conventional Spray
- Airless spray.
Before painting, apply stripe coats by brush to all corners, sharp edges,
bolt or riverheads, etc. With the same product than this to be applied on the
surface to be painted.
The only exception is inorganic zinc silicates where only post touch shall be
1 applied using the repair system primer (zinc rich epoxy primer).
6.2.2.6 Drying
No coat of paint shall be applied until the preceding coat completely dried
(minimum and maximum time between coats is indicated on product data
1
sheet and MHK-COMP-SPE-EP-COR-0350).
No drier shall be added to paint unless specified by Pertamina Hulu
Mahakam.
6.2.3 Test Procedure
6.2.3.1 Blotter Test
In order to ensure that the compressor and the compressed air line used is
proper, a blotter test shall be performed at the initial stage of the operation.
White absorbent material, such as several layers of cotton cloth, or a piece
of white blotter paper is required in the performance of the test.
Procedure:
- Test the air supply using either the absorbent or non absorbent
collector to determine
- the presence of oil or water and moisture traps in air suplay.
- Hold the blotter or test material in the a stream for a minimum of
one minutes. The Blotter or test material should be held within a
distance of 600 mm from the source of the air stream being tested
(Refer to ASTM D4285)
- If air from the abrasive blast nozzles is being tested, make sure
that the abrasive source is cut off and that only air is coming our of
the nozzle, prior holding the blotter or test material in front of the
nozzle
- If air is being discharged at several locations drawing from a
common manifold source, it is not necessary to test the air
cleanliness at each location.
- Examine the test material immediately after the test is completed
for evidence of contamination, oil or moisture. Examination should be
made visually.
Document Number
Contract : 4600006253
ID-ALL-ALL-0102-520007-O-ALL-20-
Blasting and Painting Procedure Specification 004
6.2.3.2 Air compressor pressure test near blasting nozzle by hypodermic needle
gauge
Air compressor pressure shall be checked periodically in order to ensure
that the air pressure is sufficient as per manufacturer recommendation.
6.2.3.3 Conductivity Test (ASTM 4940)
Conductivity test procedure as following :
Material :
- Conductivity Gauge
- Abrasive Material
- Stop Watch
- Glass Jar/Beakers
- Strring Rods
Procedure :
- Rinse glass jar / Beakers, Stirring rods with reagent water until tests
show the rinse water has a conductivity 5.0 micro semen’s/cm
- Calibrated Conductivity meter with water solution standard
- Add 300 mL of abrasive to 300 mL of water and stir for 1 min with a
stirring rod.
- Let stand for 8 min and then stir again 1 min.
- Measure conductivity test result with conductivity meter gauge
6.2.3.4 Substrate contamination test (water soluble test) ISO 8502-6&9
Excessive amounts of water soluble salts cause osmosis, blistering of the
paint coating.
Materials required for the test are as following:
- Bresle Sampler, 12.5 sq. cm.
- Syringe 5 ml
- Stop Watch
- Needle for the syringe
- Conductivity gauge
- Thermometer
- Plastic cup
- Distilled Water
Procedure:
- Remove protective backing and foam center from bresle patch
Document Number
Contract : 4600006253
ID-ALL-ALL-0102-520007-O-ALL-20-
Blasting and Painting Procedure Specification 004
Figure-1
9.0 APPENDICES
A. Daily Painting Report
B. Painting Inspection Report
C. Painting Completion Report
1 D. List of Painting System
E. Product Data Sheet of Abrasive Materials
F. Personnel Certificates
G. List of Calibration Certificate of Inspection Tools
H. Product Data Sheet of Paint Materials
Form No. : Form-QC-PN-02
COATING INSPECTION
METHODS STANDARD REFERENCES TEST COMMENTS
Visual
Grade of Cleanliness
Conductivity Test
Salt Contamination Test
Dust Level Test
Roughness Test
WFT
DFT
Pinhole Test
Adhesion Test
Document Review
Equipment Check
Insp. Tools Check
Pre-Job Meeting
PAINTING SPECIFICATION
STRUCTURES CLIENT SPEC REV SYSTEM FINAL COLOURS
Comments : All the above items have been carried out according to the applicable Client specification and result that accepted.
Installation completed at on
APPROVAL
Comments :
1 P 01
2 P 01 nd
3 P 02
4 P 02 nd
5 P 05
6 P 07 nd
7 P 08
8 P 103
LIST OF MAN POWER
VALID
NO DESCRIPTION POSITION CERTIFICATION REMARK
CERTIFICATED
BLASTER PAINTER
Prepared by,
PT. PUTRA TUNGGAL MANDIRITAMA
Ibnu Hajar
LIST OF PAINTING INPECTION TOOLS
AND BLASTING PAINTING EQUIPMENT
PROJECT : WELLCONNECTION Doc No. : 01/PTM/BP/V/20
CALIBRATION /
NO DESCRIPTION QUANTITY MANUFACTURE CERTIFICATION STATUS CONDITION REMARK
(EXPIRED)
PAINTING INSPECTION TOOLS :
1 BRESLE SALT KIT (CONDUCTIVITY TESTER) 1 UNIT HORIBA 28/05/2021 Valid GOOD
2 DRY FILM THICKNESS FERROUS (DFT-01) 1 UNIT ELCOMETER 456 27/05/2021 Valid GOOD
3 DRY FILM THICKNESS FERROUS (DFT-02) 1 UNIT ELCOMETER 456 20/12/2020 Valid GOOD
4 DRY FILM THICKNESS NON FERROUS (DFT-03) 1 UNIT ELCOMETER 456 27/05/2021 Valid GOOD
5 DIAL THICKNESS GAUGE 1 EA ELCOMETER 124 26/05/2021 Valid GOOD
6 PINHOLE DETECTOR 1 UNIT ELCOMETER 270 26/05/2021 Valid GOOD
7 MAGNETIC THERMOMETER (MT-01) 1 EA ELCOMETER 113 26/05/2021 Valid GOOD
8 SLING PSYHROMETER (SP-01) 1 EA BACHARACH 26/05/2021 Valid GOOD
9 WET FILM THICKNESS (WFT-01) 2 EA ELCOMETER N/A Valid GOOD
10 INSPECTION MIRROR 1 EA KRISBOW N/A - GOOD
11 KEANE-TATOR SURFACE PROFILE COMPARATOR SAND 7128 1 EA TQC N/A - GOOD
12 KEANE-TATOR SURFACE PROFILE COMPARATOR 1 UNIT TQC N/A - GOOD
13 BOOK SS-EN ISO 8501-1 : 2007 1 EA - N/A - GOOD
14 BOOK SSPC VIS - 2 1 EA - N/A - GOOD
15 BOOK SSPC VIS - 5 1 EA - N/A - GOOD
1 AIR COMPRESSOR 390 PDS 1 UNIT AIRMAN April, 2021 Valid GOOD
2 SAND POT CAP 600 LBS 1 UNIT UNIVERSAL April, 2021 Valid GOOD
3 AIR TRAP RECEIVER / MANIFOLD DIA 24" 1 UNIT UNIVERSAL April, 2021 Valid GOOD
4 AIR FILTER REGULATOR 1 UNIT CLEMCO April, 2021 Valid GOOD
Prepared by,