DESIGN OF PILE CAP PC4 FOR A2 C

B3
Size of column = 800 x800 P1 P4
No. of piles = 6
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 43 t c.g Z
TOP OF PILECAP EL -0.375 M Pile B P2 P5
FGL EL 0 M A A/2 800 A
T.O. PEDESTAL EL + 0.8 M P3 P6 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x3.9x1.2 X Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 1.5m
B2 = 1.5m
B3 = 0.45m
B = 3.9m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - A/2 STAAD NODE NO. 10
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4 P5 P6
CASE Design
101 DL+LL+EQP+BT*1.25 1 13.535 27.221 40.908 4.441 18.128 31.815 1.5
102 DL+LL+EQP+BT+WL+XPR 2 5.002 18.971 32.940 1.416 15.385 29.354 1.2
103 DL+LL+EQP+BT+WL+XSUC 3 9.146 21.986 34.826 4.386 17.226 30.066 1.2
104 DL+LL+EQP+BT+WL-XPR 4 12.842 25.993 39.144 2.155 15.306 28.457 1.2
105 DL+LL+EQP+BT+WL-XSUC 5 15.679 29.108 42.537 3.789 17.218 30.647 1.2
106 DL+LL+EQP+BT+WL+ZPR 6 18.070 16.696 15.323 9.936 8.563 7.190 1.2
107 DL+LL+EQP+BT+WL+ZSUC 7 28.479 25.981 23.484 20.629 18.131 15.634 1.2
108 DL+LL+EQP+BT+WL-ZPR 8 3.976 31.890 59.803 -3.514 24.400 52.313 1.2
109 DL+LL+EQP+BT+WL-ZSUC 9 19.200 16.958 14.716 11.480 9.238 6.996 1.2
110 DL+LL+EQP+BT+SLX 10 6.676 18.591 30.507 6.629 18.545 30.460 1.2
111 DL+LL+EQP+BT-SLX 11 19.311 21.173 23.035 11.584 13.446 15.309 1.2
112 DL+LL+EQP+BT+SLZ 12 18.602 32.531 46.460 3.529 17.458 31.387 1.2
113 DL+LL+EQP+BT-SLZ 13 5.966 29.948 53.930 -1.424 22.558 46.540 1.2
114 DL+EQP+BT+WL+XPR 14 3.260 12.906 22.553 -0.114 9.533 19.180 1.5
115 DL+EQP+BT+WL+XSUC 15 7.406 15.921 24.437 2.859 11.375 19.890 1.5
116 DL+EQP+BT+WL-XPR 16 11.099 19.928 28.757 0.626 9.455 18.284 1.5
117 DL+EQP+BT+WL-XSUC 17 13.939 23.043 32.147 2.262 11.366 20.471 1.5
118 DL+EQP+BT+WL+ZPR 18 16.329 10.631 4.934 8.409 2.711 -2.986 1.5
119 DL+EQP+BT+WL+ZSUC 19 26.739 19.916 13.094 19.102 12.280 5.457 1.5
120 DL+EQP+BT+WL-ZPR 20 2.236 25.825 49.414 -5.041 18.548 42.137 1.5
121 DL+EQP+BT+WL-ZSUC 21 17.460 10.893 4.326 9.953 3.386 -3.180 1.5
122 DL+EQP+BT+SLX 22 4.934 12.525 20.116 5.104 12.695 20.286 1.5
123 DL+EQP+BT-SLX 23 17.570 15.108 12.646 10.057 7.595 5.132 1.5
124 DL+EQP+BT+SLZ 24 16.860 26.465 36.069 2.004 11.608 21.212 1.5
125 DL+EQP+BT-SLZ 25 4.225 23.883 43.541 -2.951 16.706 36.364 1.5

Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 49.414 t
(L.C - 20)
Minm. Pile Reaction considered in Pilecap design for Top reinf. = -5.041 t
(L.C - 20)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 20
Moment at line A-A =
(49.414+42.137)x(1.5-0.4)-0.5*(0.45+1.5-0.8/2)*2.4*(0.45+1.5-0.4)*1.2*2.5
= 92.06 t-m

Mu / b.d2 = 1.5x92.06x10^7/ (2400x1117^2) = 0.461 N/sqmm


pt = 0.108 % Ast rqd = 29 sqcm
Provide 16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along X direction. 32.17 sqcm (Pt prov. = 0.12 % )

LOAD CASE- 20
d= 1101 mm
Moment at line C-C =
(2.236+25.825+49.414)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 23.37 tm
Width of pile cap on line C-C = 3900 m
Mu / b.d2 = 1.5x23.37x10^7/ (3900x1101^2) = 0.074 N/sqmm
pt = 0.017 % Ast rqd = 7.3 sqcm
16tor @150c/c alth at bottom along Z direction. 52.28 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along Z dirn. 52.28 sqcm (Pt prov. = 0.122 % )
Check for shear: ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456
49.414 42.137
column column

P3 P6
49.414 42.137

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


-541.5 -541.5

28.479
Shear along X-X =
(AT d/2 from column face)
= (49.414+42.137)-(0.45+1.5-0.8/2-1.117/2)*2.4*1.2*2.5
= 84.35 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x84.35x10^4/(2400x1117) = 0.472 N/sqmm.
tc.b.d = 71.31 t
Shear Stirrups
With 8 tor open links (with every bar) No. of Ties = 14
14 L 8 Tor @ 150 c/c Vus = 224.69 t
Total shear capacity = 296 t. > 126.53 t Ok

SHEAR ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P3
column 0.37 4.28 8.19

2.236 25.825 49.414

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along Z-Z =


= (0.37+4.28+8.19-(0.45+0.75-0.8/2-1.101/2)*3.9*1.2*2.5) t
= 9.921 t
Provided reinforcement % = 100x52.28/(390x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x9.92085x10^4/(3900x1101) = 0.035 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 133.119 t (Summing all pile loads for Load Comb-20)
tv =punching shear stress = 1.5 * 133.119 * 104 / 8.372 / 106 = 0.24 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC5 FOR B2 C
B3
Size of column = 800 x800 P3 P6
No. of piles = 6
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 43 t c.g X
TOP OF PILECAP EL -0.375 M Pile B P2 B2 P5
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x3.9x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 1.5m
B2 = 1.5m
B3 = 0.45m
B = 3.9m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - B/2 STAAD NODE NO. 35
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4 P5 P6
CASE Design
101 DL+LL+EQP+BT*1.25 1 31.556 24.739 17.922 31.214 24.397 17.580 1.5
102 DL+LL+EQP+BT+WL+XPR 2 29.108 22.898 16.688 28.895 22.685 16.475 1.2
103 DL+LL+EQP+BT+WL+XSUC 3 29.875 23.411 16.948 30.088 23.625 17.161 1.2
104 DL+LL+EQP+BT+WL-XPR 4 29.625 23.675 17.725 28.927 22.977 17.027 1.2
105 DL+LL+EQP+BT+WL-XSUC 5 29.964 23.811 17.657 29.689 23.535 17.382 1.2
106 DL+LL+EQP+BT+WL+ZPR 6 40.717 22.439 4.161 39.962 21.684 3.405 1.2
107 DL+LL+EQP+BT+WL+ZSUC 7 42.516 23.996 5.476 42.200 23.680 5.160 1.2
108 DL+LL+EQP+BT+WL-ZPR 8 19.024 25.334 31.644 18.269 24.579 30.889 1.2
109 DL+LL+EQP+BT+WL-ZSUC 9 40.412 22.664 4.916 40.097 22.349 4.600 1.2
110 DL+LL+EQP+BT+SLX 10 30.814 23.634 16.454 30.845 23.665 16.485 1.2
111 DL+LL+EQP+BT-SLX 11 38.479 22.834 7.189 38.164 22.519 6.874 1.2
112 DL+LL+EQP+BT+SLZ 12 29.860 24.236 18.613 29.193 23.570 17.946 1.2
113 DL+LL+EQP+BT-SLZ 13 22.194 25.034 27.874 21.879 24.719 27.559 1.2
115 DL+EQP+BT+WL+XPR 14 21.321 17.031 12.741 21.085 16.795 12.505 1.5
116 DL+EQP+BT+WL+XSUC 15 22.085 17.542 12.999 22.281 17.737 13.194 1.5
117 DL+EQP+BT+WL-XPR 16 21.836 17.806 13.776 21.120 17.090 13.060 1.5
118 DL+EQP+BT+WL-XSUC 17 22.177 17.944 13.710 21.879 17.646 13.412 1.5
119 DL+EQP+BT+WL+ZPR 18 32.929 16.572 0.215 32.151 15.794 -0.563 1.5
120 DL+EQP+BT+WL+ZSUC 19 34.727 18.129 1.530 34.389 17.791 1.192 1.5
121 DL+EQP+BT+WL-ZPR 20 11.237 19.467 27.697 10.459 18.689 26.919 1.5
122 DL+EQP+BT+WL-ZSUC 21 32.625 16.797 0.969 32.287 16.459 0.631 1.5
123 DL+EQP+BT+SLX 22 23.027 17.767 12.507 23.036 17.776 12.516 1.5
124 DL+EQP+BT-SLX 23 30.690 16.967 3.244 30.352 16.629 2.906 1.5
125 DL+EQP+BT+SLZ 24 22.070 18.367 14.664 21.386 17.682 13.979 1.5
126 DL+EQP+BT-SLZ 25 14.407 19.167 23.927 14.069 18.829 23.589 1.5

Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 34.727 t
(L.C - 19)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 19
Moment at line A-A =
(34.727+34.389)x(1.5-0.4)-0.5*(0.45+1.5-0.8/2)*2.4*(0.45+1.5-0.4)*1.2*2.5
= 67.38 t-m

Mu / b.d2 = 1.5x67.38x10^7/ (2400x1117^2) = 0.338 N/sqmm


pt = 0.079 % Ast rqd = 21.2 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 19
d= 1101 mm
Moment at line C-C =
(34.727+18.129+1.53)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 15.29 tm
Width of pile cap on line C-C = 3900 m
Mu / b.d2 = 1.5x15.29x10^7/ (3900x1101^2) = 0.049 N/sqmm
pt = 0.011 % Ast rqd = 4.7 sqcm
16tor @150c/c alth at bottom along X direction. 52.28 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 52.28 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
34.727 34.389
column column

P1 P4
34.727 34.389

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


-541.5 -541.5

29.875
Shear along Z-Z =
(AT d/2 from column face)
= (34.727+34.389)-(0.45+1.5-0.8/2-1.117/2)*2.4*1.2*2.5
= 61.92 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x61.92x10^4/(2400x1117) = 0.346 N/sqmm.
tc.b.d = 71.31 t
Shear Stirrups
With 8 tor open links (with every bar) No. of Ties = 14
14 L 8 Tor @ 150 c/c Vus = 224.69 t
Total shear capacity = 296 t. > 92.88 t Ok

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P3
column 5.76 3.01 0.25

34.727 18.129 1.530

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (5.76+3.01+0.25-(0.45+0.75-0.8/2-1.101/2)*3.9*1.2*2.5) t
= 6.101 t
Provided reinforcement % = 100x52.28/(390x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x6.10085x10^4/(3900x1101) = 0.021 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 147.408 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 147.408 * 104 / 8.372 / 106 = 0.26 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC6 FOR C2 C
B3
Size of column = 800 x800 P3 P6
No. of piles = 6
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 43 t c.g X
TOP OF PILECAP EL -0.375 M Pile B P2 C2 P5
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x3.9x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 1.5m
B2 = 1.5m
B3 = 0.45m
B = 3.9m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/2 STAAD NODE NO. 55
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4 P5 P6
CASE Design
101 DL+LL+EQP+BT*1.25 1 24.157 21.310 18.464 21.939 19.092 16.246 1.5
102 DL+LL+EQP+BT+WL+XPR 2 22.746 18.110 13.473 20.866 16.230 11.593 1.2
103 DL+LL+EQP+BT+WL+XSUC 3 23.206 19.967 16.729 21.224 17.985 14.747 1.2
104 DL+LL+EQP+BT+WL-XPR 4 21.824 18.886 15.947 19.575 16.637 13.699 1.2
105 DL+LL+EQP+BT+WL-XSUC 5 24.006 21.036 18.066 21.646 18.676 15.706 1.2
106 DL+LL+EQP+BT+WL+ZPR 6 38.571 27.474 16.377 34.082 22.985 11.889 1.2
107 DL+LL+EQP+BT+WL+ZSUC 7 30.306 20.612 10.919 28.137 18.444 8.750 1.2
108 DL+LL+EQP+BT+WL-ZPR 8 9.032 14.401 19.769 4.584 9.952 15.320 1.2
109 DL+LL+EQP+BT+WL-ZSUC 9 34.915 25.563 16.211 32.768 23.416 14.065 1.2
110 DL+LL+EQP+BT+SLX 10 24.385 21.016 17.648 22.771 19.403 16.035 1.2
111 DL+LL+EQP+BT-SLX 11 35.639 26.679 17.719 33.484 24.524 15.564 1.2
112 DL+LL+EQP+BT+SLZ 12 23.444 21.142 18.840 20.786 18.484 16.182 1.2
113 DL+LL+EQP+BT-SLZ 13 12.189 15.479 18.769 10.074 13.364 16.654 1.2
115 DL+EQP+BT+WL+XPR 14 15.637 12.177 8.717 14.135 10.675 7.215 1.5
116 DL+EQP+BT+WL+XSUC 15 16.095 14.035 11.975 14.491 12.431 10.371 1.5
117 DL+EQP+BT+WL-XPR 16 14.715 12.954 11.192 12.844 11.082 9.321 1.5
118 DL+EQP+BT+WL-XSUC 17 16.896 15.104 13.312 14.914 13.122 11.330 1.5
119 DL+EQP+BT+WL+ZPR 18 31.460 21.542 11.624 27.349 17.431 7.512 1.5
120 DL+EQP+BT+WL+ZSUC 19 23.197 14.680 6.164 21.406 12.889 4.372 1.5
121 DL+EQP+BT+WL-ZPR 20 1.921 8.466 15.011 -2.145 4.400 10.945 1.5
122 DL+EQP+BT+WL-ZSUC 21 27.806 19.631 11.456 26.037 17.862 9.687 1.5
123 DL+EQP+BT+SLX 22 17.276 15.084 12.892 16.040 13.849 11.657 1.5
124 DL+EQP+BT-SLX 23 28.530 20.747 12.964 26.752 18.969 11.186 1.5
125 DL+EQP+BT+SLZ 24 16.335 15.210 14.085 14.055 12.930 11.805 1.5
126 DL+EQP+BT-SLZ 25 5.079 9.547 14.015 3.341 7.809 12.277 1.5

Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 31.460 t
(L.C - 18)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 18
Moment at line A-A =
(31.46+27.349)x(1.5-0.4)-0.5*(0.45+1.5-0.8/2)*2.4*(0.45+1.5-0.4)*1.2*2.5
= 56.04 t-m

Mu / b.d2 = 1.5x56.04x10^7/ (2400x1117^2) = 0.281 N/sqmm


pt = 0.065 % Ast rqd = 17.4 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 18
d= 1101 mm
Moment at line C-C =
(31.46+21.542+11.624)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 18.88 tm
Width of pile cap on line C-C = 3900 m
Mu / b.d2 = 1.5x18.88x10^7/ (3900x1101^2) = 0.06 N/sqmm
pt = 0.014 % Ast rqd = 6 sqcm
16tor @150c/c alth at bottom along X direction. 52.28 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 52.28 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
31.46 27.349
column column

P1 P4
31.46 27.349

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


-541.5 -541.5

23.206
Shear along Z-Z =
(AT d/2 from column face)
= (31.46+27.349)-(0.45+1.5-0.8/2-1.117/2)*2.4*1.2*2.5
= 51.61 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x51.61x10^4/(2400x1117) = 0.289 N/sqmm.
tc.b.d = 71.31 t
Shear Stirrups
With 8 tor open links (with every bar) No. of Ties = 14
14 L 8 Tor @ 150 c/c Vus = 224.69 t
Total shear capacity = 296 t. > 77.42 t Ok

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P3
column 5.22 3.57 1.93

31.46 21.542 11.624

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (5.22+3.57+1.93-(0.45+0.75-0.8/2-1.101/2)*3.9*1.2*2.5) t
= 7.801 t
Provided reinforcement % = 100x52.28/(390x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x7.80085x10^4/(3900x1101) = 0.027 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 116.918 t (Summing all pile loads for Load Comb-18)
tv =punching shear stress = 1.5 * 116.918 * 104 / 8.372 / 106 = 0.21 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC17 FOR B6 C
B3
Size of column = 800 x800 P3 P6
No. of piles = 6
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 43 t c.g X
TOP OF PILECAP EL -0.375 M Pile B P2 B6 P5
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x3.9x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 1.5m
B2 = 1.5m
B3 = 0.45m
B = 3.9m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - B/6 STAAD NODE NO. 43
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4 P5 P6
CASE Design
101 DL+LL+EQP+BT*1.25 1 38.732 38.434 38.135 39.181 38.882 38.584 1.5
102 DL+LL+EQP+BT+WL+XPR 2 40.102 39.072 38.042 40.551 39.521 38.491 1.2
103 DL+LL+EQP+BT+WL+XSUC 3 38.984 38.559 38.134 39.432 39.007 38.582 1.2
104 DL+LL+EQP+BT+WL-XPR 4 39.242 38.759 38.275 39.691 39.207 38.724 1.2
105 DL+LL+EQP+BT+WL-XSUC 5 38.977 38.554 38.130 39.426 39.002 38.579 1.2
106 DL+LL+EQP+BT+WL+ZPR 6 38.822 38.630 38.439 39.271 39.079 38.887 1.2
107 DL+LL+EQP+BT+WL+ZSUC 7 37.722 38.135 38.549 38.171 38.584 38.997 1.2
108 DL+LL+EQP+BT+WL-ZPR 8 39.199 38.569 37.939 39.647 39.017 38.387 1.2
109 DL+LL+EQP+BT+WL-ZSUC 9 37.967 38.320 38.674 38.416 38.769 39.122 1.2
110 DL+LL+EQP+BT+SLX 10 38.740 38.440 38.140 39.189 38.889 38.589 1.2
111 DL+LL+EQP+BT-SLX 11 38.667 38.422 38.177 39.116 38.871 38.626 1.2
112 DL+LL+EQP+BT+SLZ 12 38.725 38.429 38.132 39.174 38.877 38.581 1.2
113 DL+LL+EQP+BT-SLZ 13 38.799 38.449 38.099 39.247 38.897 38.547 1.2
115 DL+EQP+BT+WL+XPR 14 35.047 34.012 32.977 35.496 34.461 33.426 1.5
116 DL+EQP+BT+WL+XSUC 15 33.930 33.500 33.070 34.379 33.949 33.519 1.5
117 DL+EQP+BT+WL-XPR 16 34.187 33.699 33.210 34.636 34.147 33.659 1.5
118 DL+EQP+BT+WL-XSUC 17 33.922 33.494 33.065 34.371 33.942 33.514 1.5
119 DL+EQP+BT+WL+ZPR 18 33.767 33.570 33.374 34.216 34.019 33.822 1.5
120 DL+EQP+BT+WL+ZSUC 19 32.665 33.075 33.485 33.114 33.524 33.934 1.5
121 DL+EQP+BT+WL-ZPR 20 34.144 33.510 32.877 34.592 33.959 33.326 1.5
122 DL+EQP+BT+WL-ZSUC 21 32.912 33.260 33.609 33.361 33.709 34.057 1.5
123 DL+EQP+BT+SLX 22 33.684 33.380 33.077 34.132 33.829 33.526 1.5
124 DL+EQP+BT-SLX 23 33.612 33.362 33.112 34.061 33.811 33.561 1.5
125 DL+EQP+BT+SLZ 24 33.669 33.369 33.069 34.117 33.817 33.517 1.5
126 DL+EQP+BT-SLZ 25 33.744 33.389 33.034 34.192 33.837 33.482 1.5

Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 39.181 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(38.732+39.181)x(1.5-0.4)-0.5*(0.45+1.5-0.8/2)*2.4*(0.45+1.5-0.4)*1.2*2.5
= 77.06 t-m

Mu / b.d2 = 1.5x77.06x10^7/ (2400x1117^2) = 0.386 N/sqmm


pt = 0.09 % Ast rqd = 24.1 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(39.181+38.882+38.584)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 37.08 tm
Width of pile cap on line C-C = 3900 m
Mu / b.d2 = 1.5x37.08x10^7/ (3900x1101^2) = 0.118 N/sqmm
pt = 0.027 % Ast rqd = 11.6 sqcm
16tor @150c/c alth at bottom along X direction. 52.28 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 52.28 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
38.732 39.181
column column

P1 P4
38.732 39.181

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


-541.5 -541.5

38.984
Shear along Z-Z =
(AT d/2 from column face)
= (38.732+39.181)-(0.45+1.5-0.8/2-1.117/2)*2.4*1.2*2.5
= 70.72 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x70.72x10^4/(2400x1117) = 0.396 N/sqmm.
tc.b.d = 71.31 t
Shear Stirrups
With 8 tor open links (with every bar) No. of Ties = 14
14 L 8 Tor @ 150 c/c Vus = 224.69 t
Total shear capacity = 296 t. > 106.08 t Ok

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P4 P5 P6
column 6.5 6.45 6.4

39.181 38.882 38.584

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (6.5+6.45+6.4-(0.45+0.75-0.8/2-1.101/2)*3.9*1.2*2.5) t
= 16.431 t
Provided reinforcement % = 100x52.28/(390x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x16.43085x10^4/(3900x1101) = 0.057 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 231.948 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 231.948 * 104 / 8.372 / 106 = 0.42 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC9 FOR C3 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m A A
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C3
FGL EL 0 M 800
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/3 STAAD NODE NO. 56
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 43.593 43.784 43.784 43.784 1.5 87.568 43.593
102 DL+LL+EQP+BT+WL+XPR 2 43.618 43.618 43.772 43.618 1.2 87.390 43.618
103 DL+LL+EQP+BT+WL+XSUC 3 43.618 43.772 43.772 43.772 1.2 87.544 43.618
104 DL+LL+EQP+BT+WL-XPR 4 43.618 43.772 43.772 43.772 1.2 87.544 43.618
105 DL+LL+EQP+BT+WL-XSUC 5 43.542 43.848 43.848 43.848 1.2 87.696 43.542
106 DL+LL+EQP+BT+WL+ZPR 6 43.695 43.542 43.695 43.542 1.2 87.237 43.695
107 DL+LL+EQP+BT+WL+ZSUC 7 43.772 43.618 43.618 43.618 1.2 87.236 43.772
108 DL+LL+EQP+BT+WL-ZPR 8 43.542 43.848 43.848 43.848 1.2 87.696 43.542
109 DL+LL+EQP+BT+WL-ZSUC 9 43.542 44.002 43.848 44.002 1.2 87.850 43.542
110 DL+LL+EQP+BT+SLX 10 43.695 43.695 43.695 43.695 1.2 87.390 43.695
111 DL+LL+EQP+BT-SLX 11 43.542 43.695 43.848 43.695 1.2 87.543 43.542
112 DL+LL+EQP+BT+SLZ 12 43.618 43.772 43.772 43.772 1.2 87.544 43.618
113 DL+LL+EQP+BT-SLZ 13 43.618 43.772 43.772 43.772 1.2 87.544 43.618
115 DL+EQP+BT+WL+XPR 14 28.243 28.243 28.397 28.243 1.5 56.640 28.243
116 DL+EQP+BT+WL+XSUC 15 28.243 28.397 28.397 28.397 1.5 56.794 28.243
117 DL+EQP+BT+WL-XPR 16 28.243 28.397 28.397 28.397 1.5 56.794 28.243
118 DL+EQP+BT+WL-XSUC 17 28.167 28.473 28.473 28.473 1.5 56.946 28.167
119 DL+EQP+BT+WL+ZPR 18 28.320 28.167 28.320 28.167 1.5 56.487 28.320
120 DL+EQP+BT+WL+ZSUC 19 28.397 28.243 28.243 28.243 1.5 56.486 28.397
121 DL+EQP+BT+WL-ZPR 20 28.167 28.473 28.473 28.473 1.5 56.946 28.167
122 DL+EQP+BT+WL-ZSUC 21 28.167 28.627 28.473 28.627 1.5 57.100 28.167
123 DL+EQP+BT+SLX 22 28.320 28.320 28.320 28.320 1.5 56.640 28.320
124 DL+EQP+BT-SLX 23 28.167 28.320 28.473 28.320 1.5 56.793 28.167
125 DL+EQP+BT+SLZ 24 28.243 28.397 28.397 28.397 1.5 56.794 28.243
126 DL+EQP+BT-SLZ 25 28.243 28.397 28.397 28.397 1.5 56.794 28.243
87.850
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 43.784 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(43.784+43.784)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 28.34 t-m

Mu / b.d2 = 1.5x28.34x10^7/ (2400x1117^2) = 0.142 N/sqmm


pt = 0.033 % Ast rqd = 8.8 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(43.593+43.784)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 28.28 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x28.28x10^7/ (2400x1101^2) = 0.146 N/sqmm
pt = 0.034 % Ast rqd = 9 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
6.677 6.677
column column

P2 P4
43.784 43.784

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

43.618
Shear along Z-Z =
(AT d/2 from column face)
= (6.677+6.677)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 11.56 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x11.56x10^4/(2400x1117) = 0.065 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 7.23 7.26 0

43.593 43.784 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (7.23+7.26+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 12.694 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x12.6936x10^4/(2400x1101) = 0.072 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 174.945 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 174.945 * 104 / 8.372 / 106 = 0.31 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC10 FOR A4 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m A A
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B A/4
FGL EL 0 M 800
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - A/4 STAAD NODE NO. 12
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 34.893 38.320 18.460 21.887 1.5 40.347 34.893
102 DL+LL+EQP+BT+WL+XPR 2 17.459 28.486 12.079 23.106 1.2 35.185 17.459
103 DL+LL+EQP+BT+WL+XSUC 3 26.495 31.235 18.735 23.475 1.2 42.210 26.495
104 DL+LL+EQP+BT+WL-XPR 4 31.563 36.950 12.030 17.417 1.2 29.447 31.563
105 DL+LL+EQP+BT+WL-XSUC 5 37.757 42.483 15.797 20.523 1.2 36.320 37.757
106 DL+LL+EQP+BT+WL+ZPR 6 26.840 29.280 14.880 17.320 1.2 32.200 26.840
107 DL+LL+EQP+BT+WL+ZSUC 7 36.541 32.694 22.801 18.954 1.2 41.755 36.541
108 DL+LL+EQP+BT+WL-ZPR 8 29.603 36.323 18.443 25.163 1.2 43.606 29.603
109 DL+LL+EQP+BT+WL-ZSUC 9 30.985 27.818 17.552 14.385 1.2 31.937 30.985
110 DL+LL+EQP+BT+SLX 10 22.088 25.481 23.574 26.968 1.2 50.542 22.088
111 DL+LL+EQP+BT-SLX 11 32.982 35.762 19.348 22.128 1.2 41.476 32.982
112 DL+LL+EQP+BT+SLZ 12 43.368 46.794 15.141 18.568 1.2 33.709 43.368
113 DL+LL+EQP+BT-SLZ 13 32.477 36.517 19.363 23.403 1.2 42.766 32.477
115 DL+EQP+BT+WL+XPR 14 8.148 19.148 3.042 14.042 1.5 17.084 8.148
116 DL+EQP+BT+WL+XSUC 15 17.181 21.894 9.701 14.414 1.5 24.115 17.181
117 DL+EQP+BT+WL-XPR 16 22.256 27.609 2.996 8.349 1.5 11.345 22.256
118 DL+EQP+BT+WL-XSUC 17 28.443 33.143 6.763 11.463 1.5 18.226 28.443
119 DL+EQP+BT+WL+ZPR 18 17.529 19.943 5.843 8.256 1.5 14.099 17.529
120 DL+EQP+BT+WL+ZSUC 19 27.227 23.353 13.767 9.893 1.5 23.660 27.227
121 DL+EQP+BT+WL-ZPR 20 20.292 26.985 9.405 16.098 1.5 25.503 20.292
122 DL+EQP+BT+WL-ZSUC 21 21.674 18.474 8.521 5.321 1.5 13.842 21.674
123 DL+EQP+BT+SLX 22 12.777 16.137 14.543 17.903 1.5 32.446 12.777
124 DL+EQP+BT-SLX 23 23.671 26.418 10.318 13.064 1.5 23.382 23.671
125 DL+EQP+BT+SLZ 24 34.060 37.453 6.107 9.500 1.5 15.607 34.060
126 DL+EQP+BT-SLZ 25 23.166 27.173 10.333 14.339 1.5 24.672 23.166
50.542
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 46.794 t
(L.C - 12)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 12
Moment at line A-A =
(46.794+18.568)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 20.57 t-m

Mu / b.d2 = 1.2x20.57x10^7/ (2400x1117^2) = 0.082 N/sqmm


pt = 0.019 % Ast rqd = 5.1 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(43.368+46.794)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 29.25 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.2x29.25x10^7/ (2400x1101^2) = 0.121 N/sqmm
pt = 0.028 % Ast rqd = 7.4 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
7.136 2.832
column column

P2 P4
46.794 18.568

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

26.495
Shear along Z-Z =
(AT d/2 from column face)
= (7.136+2.832)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 8.17 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.2x8.17x10^4/(2400x1117) = 0.037 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 7.19 7.76 0

43.368 46.794 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (7.19+7.76+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 13.154 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.2x13.1536x10^4/(2400x1101) = 0.06 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 113.56 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 113.56 * 104 / 8.372 / 106 = 0.2 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC14 FOR B5' & B5 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m B1
Dia of pile = 0.6 m A A
Capacity of pile = 48 t c.g 800 X
TOP OF PILECAP EL -0.375 M Pile B B5
FGL EL 0 M B5' 800
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.65x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.875m
Distance along X = L2 = 0.45m
L = 2.65m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - B5 & B5' STAAD NODE NO. 51
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 40.696 40.856 37.504 37.664 1.5 75.168 40.696
102 DL+LL+EQP+BT+WL+XPR 2 40.305 40.492 37.378 37.565 1.2 74.943 40.305
103 DL+LL+EQP+BT+WL+XSUC 3 40.286 40.453 37.312 37.479 1.2 74.791 40.286
104 DL+LL+EQP+BT+WL-XPR 4 40.295 40.482 37.358 37.545 1.2 74.903 40.295
105 DL+LL+EQP+BT+WL-XSUC 5 40.286 40.453 37.317 37.484 1.2 74.801 40.286
106 DL+LL+EQP+BT+WL+ZPR 6 40.633 40.633 37.197 37.197 1.2 74.394 40.633
107 DL+LL+EQP+BT+WL+ZSUC 7 40.366 40.353 37.387 37.374 1.2 74.761 40.366
108 DL+LL+EQP+BT+WL-ZPR 8 39.901 40.267 37.478 37.844 1.2 75.322 39.901
109 DL+LL+EQP+BT+WL-ZSUC 9 40.613 40.613 37.182 37.182 1.2 74.364 40.613
110 DL+LL+EQP+BT+SLX 10 40.277 40.443 37.292 37.458 1.2 74.750 40.277
111 DL+LL+EQP+BT-SLX 11 40.504 40.544 37.201 37.241 1.2 74.442 40.504
112 DL+LL+EQP+BT+SLZ 12 40.276 40.443 37.302 37.469 1.2 74.771 40.276
113 DL+LL+EQP+BT-SLZ 13 40.049 40.342 37.393 37.686 1.2 75.079 40.049
115 DL+EQP+BT+WL+XPR 14 35.534 35.654 32.226 32.346 1.5 64.572 35.534
116 DL+EQP+BT+WL+XSUC 15 35.512 35.619 32.156 32.263 1.5 64.419 35.512
117 DL+EQP+BT+WL-XPR 16 35.524 35.644 32.206 32.326 1.5 64.532 35.524
118 DL+EQP+BT+WL-XSUC 17 35.512 35.619 32.161 32.268 1.5 64.429 35.512
119 DL+EQP+BT+WL+ZPR 18 35.862 35.795 32.045 31.978 1.5 64.023 35.862
120 DL+EQP+BT+WL+ZSUC 19 35.596 35.516 32.234 32.154 1.5 64.388 35.596
121 DL+EQP+BT+WL-ZPR 20 35.126 35.433 32.322 32.629 1.5 64.951 35.126
122 DL+EQP+BT+WL-ZSUC 21 35.842 35.775 32.030 31.963 1.5 63.993 35.842
123 DL+EQP+BT+SLX 22 35.503 35.609 32.136 32.243 1.5 64.379 35.503
124 DL+EQP+BT-SLX 23 35.727 35.713 32.042 32.028 1.5 64.070 35.727
125 DL+EQP+BT+SLZ 24 35.502 35.609 32.146 32.253 1.5 64.399 35.502
126 DL+EQP+BT-SLZ 25 35.278 35.505 32.240 32.467 1.5 64.707 35.278
75.322
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 40.856 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2650 mm
LOAD CASE- 1
Moment at line A-A =
(40.856+37.664)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.65*(0.45+0.75-0.4)*1.2*2.5
= 24.94 t-m

Mu / b.d2 = 1.5x24.94x10^7/ (2650x1117^2) = 0.113 N/sqmm


pt = 0.026 % Ast rqd = 7.7 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 35.52 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 35.52 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(40.696+40.856)x(0.875)
= 71.36 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x71.36x10^7/ (2400x1101^2) = 0.368 N/sqmm
pt = 0.086 % Ast rqd = 22.7 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
6.231 5.744
column column

P2 P4
40.856 37.664

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

40.286
Shear along Z-Z =
(AT d/2 from column face)
= (6.231+5.744)-(0.45+0.75-0.8/2-1.117/2)*2.65*1.2*2.5
= 9.99 t
Provided reinforcement % = 100x35.52/(265x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x9.99x10^4/(2650x1117) = 0.051 N/sqmm. Ok

SHEAR ALONG X- X

Shear along X-X =


= (40.696+40.856-63.78) t
= 17.772 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x17.772x10^4/(2400x1101) = 0.101 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 156.72 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 156.72 * 104 / 8.372 / 106 = 0.28 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC18 FOR C6 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C/6
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.55x2.55x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.825m
Distance along X = L2 = 0.45m
L = 2.55m
B1 = 0.825m
B2 = 0.825m
B3 = 0.45m
B = 2.55m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/6 STAAD NODE NO. 63
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 47.203 39.379 32.300 24.476 1.5 56.776 47.203
102 DL+LL+EQP+BT+WL+XPR 2 37.635 23.035 33.114 18.514 1.2 51.628 37.635
103 DL+LL+EQP+BT+WL+XSUC 3 40.415 31.452 33.622 24.658 1.2 58.280 40.415
104 DL+LL+EQP+BT+WL-XPR 4 46.280 36.880 28.438 19.038 1.2 47.476 46.280
105 DL+LL+EQP+BT+WL-XSUC 5 51.521 42.527 31.527 22.533 1.2 54.060 51.521
106 DL+LL+EQP+BT+WL+ZPR 6 41.052 29.440 30.913 19.301 1.2 50.214 41.052
107 DL+LL+EQP+BT+WL+ZSUC 7 44.073 38.073 32.225 26.225 1.2 58.450 44.073
108 DL+LL+EQP+BT+WL-ZPR 8 42.795 36.619 32.159 25.983 1.2 58.142 42.795
109 DL+LL+EQP+BT+WL-ZSUC 9 40.541 34.153 28.426 22.038 1.2 50.464 40.541
110 DL+LL+EQP+BT+SLX 10 34.204 26.410 36.489 28.695 1.2 65.184 34.204
111 DL+LL+EQP+BT-SLX 11 45.511 37.117 33.341 24.947 1.2 58.288 45.511
112 DL+LL+EQP+BT+SLZ 12 55.946 48.098 29.601 21.752 1.2 51.353 55.946
113 DL+LL+EQP+BT-SLZ 13 44.642 37.387 32.751 25.496 1.2 58.247 44.642
115 DL+EQP+BT+WL+XPR 14 28.761 14.707 24.507 10.452 1.5 34.959 28.761
116 DL+EQP+BT+WL+XSUC 15 31.545 23.121 25.018 16.593 1.5 41.611 31.545
117 DL+EQP+BT+WL-XPR 16 37.410 28.555 19.828 10.973 1.5 30.801 37.410
118 DL+EQP+BT+WL-XSUC 17 42.647 34.199 22.920 14.471 1.5 37.391 42.647
119 DL+EQP+BT+WL+ZPR 18 32.182 21.109 22.309 11.236 1.5 33.545 32.182
120 DL+EQP+BT+WL+ZSUC 19 35.203 29.748 23.615 18.160 1.5 41.775 35.203
121 DL+EQP+BT+WL-ZPR 20 33.928 28.291 23.552 17.916 1.5 41.468 33.928
122 DL+EQP+BT+WL-ZSUC 21 31.667 25.825 19.819 13.976 1.5 33.795 31.667
123 DL+EQP+BT+SLX 22 25.333 18.079 27.885 20.630 1.5 48.515 25.333
124 DL+EQP+BT-SLX 23 36.640 28.792 24.731 16.883 1.5 41.614 36.640
125 DL+EQP+BT+SLZ 24 47.079 39.770 20.994 13.685 1.5 34.679 47.079
126 DL+EQP+BT-SLZ 25 35.771 29.062 24.141 17.432 1.5 41.573 35.771
65.184
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 47.203 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2550 mm
LOAD CASE- 1
Moment at line A-A =
(47.203+32.3)x(0.825-0.4)-0.5*(0.45+0.825-0.8/2)*2.55*(0.45+0.825-0.4)*1.2*2.5
= 30.86 t-m

Mu / b.d2 = 1.5x30.86x10^7/ (2550x1117^2) = 0.145 N/sqmm


pt = 0.034 % Ast rqd = 9.7 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 34.18 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 34.18 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(47.203+39.379)x(0.825-0.4)-0.5*(0.45+0.825-0.8/2)*2.55*1.2*(0.45+0.825-0.4)*2.5
= 33.87 tm
Width of pile cap on line C-C = 2550 m
Mu / b.d2 = 1.5x33.87x10^7/ (2550x1101^2) = 0.164 N/sqmm
pt = 0.038 % Ast rqd = 10.7 sqcm
16tor @150c/c alth at bottom along X direction. 34.18 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 34.18 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
13.099 8.963
column column

P1 P3
47.203 32.3

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


133.5 133.5

40.415
Shear along Z-Z =
(AT d/2 from column face)
= (13.099+8.963)-(0.45+0.825-0.8/2-1.117/2)*2.55*1.2*2.5
= 19.58 t
Provided reinforcement % = 100x34.18/(255x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x19.58x10^4/(2550x1117) = 0.103 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 13.73 11.45 0

47.203 39.379 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
125.500 125.500 125.500

Shear along X-X =


= (13.73+11.45+-(0.45+0.825-0.8/2-1.101/2)*2.55*1.2*2.5) t
= 22.698 t
Provided reinforcement % = 100x34.18/(255x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x22.697575x10^4/(2550x1101) = 0.121 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 143.358 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 143.358 * 104 / 8.372 / 106 = 0.26 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC19 FOR A7 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m A A
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B A/7
FGL EL 0 M 800
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - A/7 STAAD NODE NO. 29
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 16.966 40.146 17.493 40.673 1.5 58.166 16.966
102 DL+LL+EQP+BT+WL+XPR 2 11.039 41.319 11.585 41.865 1.2 53.450 11.039
103 DL+LL+EQP+BT+WL+XSUC 3 16.423 40.850 16.970 41.396 1.2 58.366 16.423
104 DL+LL+EQP+BT+WL-XPR 4 12.219 37.225 12.739 37.745 1.2 50.484 12.219
105 DL+LL+EQP+BT+WL-XSUC 5 14.968 39.361 15.468 39.861 1.2 55.329 14.968
106 DL+LL+EQP+BT+WL+ZPR 6 14.280 36.086 14.813 36.620 1.2 51.433 14.280
107 DL+LL+EQP+BT+WL+ZSUC 7 20.885 36.845 21.419 37.379 1.2 58.798 20.885
108 DL+LL+EQP+BT+WL-ZPR 8 16.282 43.109 16.815 43.642 1.2 60.457 16.282
109 DL+LL+EQP+BT+WL-ZSUC 9 16.750 33.330 17.284 33.864 1.2 51.148 16.750
110 DL+LL+EQP+BT+SLX 10 18.765 41.979 19.345 42.559 1.2 61.904 18.765
111 DL+LL+EQP+BT-SLX 11 17.300 39.686 17.833 40.220 1.2 58.053 17.300
112 DL+LL+EQP+BT+SLZ 12 15.782 38.935 16.269 39.422 1.2 55.691 15.782
113 DL+LL+EQP+BT-SLZ 13 17.245 41.231 17.778 41.765 1.2 59.543 17.245
115 DL+EQP+BT+WL+XPR 14 4.850 31.703 5.396 32.250 1.5 37.646 4.850
116 DL+EQP+BT+WL+XSUC 15 10.237 31.230 10.784 31.777 1.5 42.561 10.237
117 DL+EQP+BT+WL-XPR 16 6.030 27.610 6.550 28.130 1.5 34.680 6.030
118 DL+EQP+BT+WL-XSUC 17 8.782 29.742 9.282 30.242 1.5 39.524 8.782
119 DL+EQP+BT+WL+ZPR 18 8.094 26.467 8.627 27.000 1.5 35.627 8.094
120 DL+EQP+BT+WL+ZSUC 19 14.696 27.230 15.230 27.763 1.5 42.993 14.696
121 DL+EQP+BT+WL-ZPR 20 10.093 33.493 10.626 34.026 1.5 44.652 10.093
122 DL+EQP+BT+WL-ZSUC 21 10.565 23.711 11.098 24.245 1.5 35.343 10.565
123 DL+EQP+BT+SLX 22 12.576 32.363 13.156 32.943 1.5 46.099 12.576
124 DL+EQP+BT-SLX 23 11.114 30.067 11.647 30.600 1.5 42.247 11.114
125 DL+EQP+BT+SLZ 24 9.596 29.316 10.083 29.803 1.5 39.886 9.596
126 DL+EQP+BT-SLZ 25 11.059 31.612 11.592 32.145 1.5 43.737 11.059
61.904
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 40.673 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(40.146+40.673)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 25.98 t-m

Mu / b.d2 = 1.5x25.98x10^7/ (2400x1117^2) = 0.13 N/sqmm


pt = 0.03 % Ast rqd = 8 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(17.493+40.673)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 18.05 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x18.05x10^7/ (2400x1101^2) = 0.093 N/sqmm
pt = 0.021 % Ast rqd = 5.5 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
6.122 6.203
column column

P2 P4
40.146 40.673

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

16.423
Shear along Z-Z =
(AT d/2 from column face)
= (6.122+6.203)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 10.53 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x10.53x10^4/(2400x1117) = 0.059 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P3 P4 P6
column 2.9 6.74 0

17.493 40.673 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (2.9+6.74+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 7.844 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x7.8436x10^4/(2400x1101) = 0.045 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 115.278 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 115.278 * 104 / 8.372 / 106 = 0.21 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC20 FOR C7 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C/7
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/7 STAAD NODE NO. 65
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 42.550 21.150 27.004 5.604 1.5 32.608 42.550
102 DL+LL+EQP+BT+WL+XPR 2 40.894 13.187 36.747 9.040 1.2 45.787 40.894
103 DL+LL+EQP+BT+WL+XSUC 3 40.926 18.460 34.280 11.813 1.2 46.093 40.926
104 DL+LL+EQP+BT+WL-XPR 4 40.007 16.974 21.220 -1.813 1.2 19.407 40.007
105 DL+LL+EQP+BT+WL-XSUC 5 42.345 19.838 21.211 -1.296 1.2 19.915 42.345
106 DL+LL+EQP+BT+WL+ZPR 6 42.189 16.842 31.882 6.535 1.2 38.417 42.189
107 DL+LL+EQP+BT+WL+ZSUC 7 41.201 21.081 29.008 8.888 1.2 37.896 41.201
108 DL+LL+EQP+BT+WL-ZPR 8 39.924 20.404 29.050 9.530 1.2 38.580 39.924
109 DL+LL+EQP+BT+WL-ZSUC 9 39.675 19.035 27.175 6.535 1.2 33.710 39.675
110 DL+LL+EQP+BT+SLX 10 39.150 17.803 42.476 21.130 1.2 63.606 39.150
111 DL+LL+EQP+BT-SLX 11 42.974 20.847 30.427 8.300 1.2 38.727 42.974
112 DL+LL+EQP+BT+SLZ 12 44.723 23.290 16.610 -4.824 1.2 11.786 44.723
113 DL+LL+EQP+BT-SLZ 13 40.899 20.245 28.659 8.005 1.2 36.664 40.899
115 DL+EQP+BT+WL+XPR 14 31.256 6.910 27.390 3.043 1.5 30.433 31.256
116 DL+EQP+BT+WL+XSUC 15 31.289 12.182 24.922 5.815 1.5 30.737 31.289
117 DL+EQP+BT+WL-XPR 16 30.373 10.700 11.860 -7.814 1.5 4.046 30.373
118 DL+EQP+BT+WL-XSUC 17 32.714 13.560 11.854 -7.300 1.5 4.554 32.714
119 DL+EQP+BT+WL+ZPR 18 32.555 10.568 22.521 0.535 1.5 23.056 32.555
120 DL+EQP+BT+WL+ZSUC 19 31.567 14.807 19.647 2.887 1.5 22.534 31.567
121 DL+EQP+BT+WL-ZPR 20 30.290 14.130 19.690 3.530 1.5 23.220 30.290
122 DL+EQP+BT+WL-ZSUC 21 30.040 12.760 17.814 0.534 1.5 18.348 30.040
123 DL+EQP+BT+SLX 22 29.515 11.529 33.115 15.129 1.5 48.244 29.515
124 DL+EQP+BT-SLX 23 33.340 14.573 21.066 2.300 1.5 23.366 33.340
125 DL+EQP+BT+SLZ 24 35.089 17.009 7.255 -10.825 1.5 -3.570 35.089
126 DL+EQP+BT-SLZ 25 31.265 13.971 19.298 2.005 1.5 21.303 31.265
63.606
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 42.550 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(42.55+27.004)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 22.04 t-m

Mu / b.d2 = 1.5x22.04x10^7/ (2400x1117^2) = 0.11 N/sqmm


pt = 0.025 % Ast rqd = 6.7 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(42.55+21.15)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 19.99 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x19.99x10^7/ (2400x1101^2) = 0.103 N/sqmm
pt = 0.024 % Ast rqd = 6.3 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
6.489 4.118
column column

P1 P3
42.55 27.004

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

40.926
Shear along Z-Z =
(AT d/2 from column face)
= (6.489+4.118)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 8.81 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x8.81x10^4/(2400x1117) = 0.049 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 7.06 3.51 0

42.55 21.15 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (7.06+3.51+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 8.774 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x8.7736x10^4/(2400x1101) = 0.05 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 96.308 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 96.308 * 104 / 8.372 / 106 = 0.17 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC21 FOR A8 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B A/8
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - A/8 STAAD NODE NO. 31
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 31.228 36.422 19.168 24.362 1.5 43.530 31.228
102 DL+LL+EQP+BT+WL+XPR 2 16.505 27.658 13.072 24.225 1.2 37.297 16.505
103 DL+LL+EQP+BT+WL+XSUC 3 24.022 30.268 18.562 24.808 1.2 43.370 24.022
104 DL+LL+EQP+BT+WL-XPR 4 29.816 36.463 15.083 21.729 1.2 36.812 29.816
105 DL+LL+EQP+BT+WL-XSUC 5 35.098 41.265 18.265 24.432 1.2 42.697 35.098
106 DL+LL+EQP+BT+WL+ZPR 6 23.893 27.486 16.379 19.973 1.2 36.352 23.893
107 DL+LL+EQP+BT+WL+ZSUC 7 32.154 30.854 23.061 21.761 1.2 44.822 32.154
108 DL+LL+EQP+BT+WL-ZPR 8 26.146 34.873 17.573 26.299 1.2 43.872 26.146
109 DL+LL+EQP+BT+WL-ZSUC 9 28.104 27.251 19.104 18.251 1.2 37.355 28.104
110 DL+LL+EQP+BT+SLX 10 19.123 24.403 20.937 26.217 1.2 47.154 19.123
111 DL+LL+EQP+BT-SLX 11 28.703 33.049 19.536 23.883 1.2 43.419 28.703
112 DL+LL+EQP+BT+SLZ 12 39.278 44.405 18.085 23.212 1.2 41.297 39.278
113 DL+LL+EQP+BT-SLZ 13 29.699 35.759 19.486 25.546 1.2 45.032 29.699
115 DL+EQP+BT+WL+XPR 14 9.888 20.841 6.314 17.268 1.5 23.582 9.888
116 DL+EQP+BT+WL+XSUC 15 17.401 23.448 11.808 17.854 1.5 29.662 17.401
117 DL+EQP+BT+WL-XPR 16 23.198 29.645 8.325 14.772 1.5 23.097 23.198
118 DL+EQP+BT+WL-XSUC 17 28.481 34.448 11.508 17.474 1.5 28.982 28.481
119 DL+EQP+BT+WL+ZPR 18 17.275 20.668 9.622 13.015 1.5 22.637 17.275
120 DL+EQP+BT+WL+ZSUC 19 25.537 24.037 16.303 14.803 1.5 31.106 25.537
121 DL+EQP+BT+WL-ZPR 20 19.522 28.055 10.815 19.348 1.5 30.163 19.522
122 DL+EQP+BT+WL-ZSUC 21 21.487 20.433 12.347 11.293 1.5 23.640 21.487
123 DL+EQP+BT+SLX 22 12.506 17.586 14.179 19.259 1.5 33.438 12.506
124 DL+EQP+BT-SLX 23 22.085 26.232 12.778 16.925 1.5 29.703 22.085
125 DL+EQP+BT+SLZ 24 32.658 37.584 11.331 16.258 1.5 27.589 32.658
126 DL+EQP+BT-SLZ 25 23.078 28.938 12.732 18.592 1.5 31.324 23.078
47.154
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 37.584 t
(L.C - 24)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 24
Moment at line A-A =
(37.584+16.258)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 16.54 t-m

Mu / b.d2 = 1.5x16.54x10^7/ (2400x1117^2) = 0.083 N/sqmm


pt = 0.019 % Ast rqd = 5.1 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 24
d= 1101 mm
Moment at line C-C =
(32.658+37.584)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 22.28 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x22.28x10^7/ (2400x1101^2) = 0.115 N/sqmm
pt = 0.027 % Ast rqd = 7.1 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
5.732 2.479
column column

P2 P4
37.584 16.258

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

24.022
Shear along Z-Z =
(AT d/2 from column face)
= (5.732+2.479)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 6.41 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x6.41x10^4/(2400x1117) = 0.036 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 5.42 6.23 0

32.658 37.584 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (5.42+6.23+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 9.854 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x9.8536x10^4/(2400x1101) = 0.056 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 111.18 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 111.18 * 104 / 8.372 / 106 = 0.2 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC22 FOR B8 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B B/8
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - B/8 STAAD NODE NO. 47
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 43.392 43.572 43.392 43.572 1.5 86.964 43.392
102 DL+LL+EQP+BT+WL+XPR 2 43.715 43.895 43.715 43.895 1.2 87.610 43.715
103 DL+LL+EQP+BT+WL+XSUC 3 43.457 43.637 43.457 43.637 1.2 87.094 43.457
104 DL+LL+EQP+BT+WL-XPR 4 43.630 43.810 43.630 43.810 1.2 87.440 43.630
105 DL+LL+EQP+BT+WL-XSUC 5 43.460 43.640 43.460 43.640 1.2 87.100 43.460
106 DL+LL+EQP+BT+WL+ZPR 6 43.645 43.825 43.645 43.825 1.2 87.470 43.645
107 DL+LL+EQP+BT+WL+ZSUC 7 43.392 43.572 43.392 43.572 1.2 86.964 43.392
108 DL+LL+EQP+BT+WL-ZPR 8 43.370 43.550 43.370 43.550 1.2 86.920 43.370
109 DL+LL+EQP+BT+WL-ZSUC 9 43.557 43.737 43.557 43.737 1.2 87.294 43.557
110 DL+LL+EQP+BT+SLX 10 43.387 43.567 43.387 43.567 1.2 86.954 43.387
111 DL+LL+EQP+BT-SLX 11 43.420 43.600 43.420 43.600 1.2 87.020 43.420
112 DL+LL+EQP+BT+SLZ 12 43.397 43.577 43.397 43.577 1.2 86.974 43.397
113 DL+LL+EQP+BT-SLZ 13 43.365 43.545 43.365 43.545 1.2 86.910 43.365
115 DL+EQP+BT+WL+XPR 14 36.872 37.052 36.872 37.052 1.5 73.924 36.872
116 DL+EQP+BT+WL+XSUC 15 36.615 36.795 36.615 36.795 1.5 73.410 36.615
117 DL+EQP+BT+WL-XPR 16 36.787 36.967 36.787 36.967 1.5 73.754 36.787
118 DL+EQP+BT+WL-XSUC 17 36.617 36.797 36.617 36.797 1.5 73.414 36.617
119 DL+EQP+BT+WL+ZPR 18 36.802 36.982 36.802 36.982 1.5 73.784 36.802
120 DL+EQP+BT+WL+ZSUC 19 36.550 36.730 36.550 36.730 1.5 73.280 36.550
121 DL+EQP+BT+WL-ZPR 20 36.527 36.707 36.527 36.707 1.5 73.234 36.527
122 DL+EQP+BT+WL-ZSUC 21 36.715 36.895 36.715 36.895 1.5 73.610 36.715
123 DL+EQP+BT+SLX 22 36.545 36.725 36.545 36.725 1.5 73.270 36.545
124 DL+EQP+BT-SLX 23 36.577 36.757 36.577 36.757 1.5 73.334 36.577
125 DL+EQP+BT+SLZ 24 36.555 36.735 36.555 36.735 1.5 73.290 36.555
126 DL+EQP+BT-SLZ 25 36.522 36.702 36.522 36.702 1.5 73.224 36.522
87.610
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 43.572 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(43.572+43.572)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 28.2 t-m

Mu / b.d2 = 1.5x28.2x10^7/ (2400x1117^2) = 0.141 N/sqmm


pt = 0.033 % Ast rqd = 8.8 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(43.392+43.572)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 28.13 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x28.13x10^7/ (2400x1101^2) = 0.145 N/sqmm
pt = 0.034 % Ast rqd = 9 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
6.645 6.645
column column

P2 P4
43.572 43.572

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

43.457
Shear along Z-Z =
(AT d/2 from column face)
= (6.645+6.645)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 11.49 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x11.49x10^4/(2400x1117) = 0.064 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 7.2 7.23 0

43.392 43.572 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (7.2+7.23+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 12.634 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x12.6336x10^4/(2400x1101) = 0.072 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 173.928 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 173.928 * 104 / 8.372 / 106 = 0.31 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC23 FOR C8 C
B3
Size of column = 800 x800 P2 P4
No. of piles = 4
Depth of pile cap = 1.2 m 800 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C/8
FGL EL 0 M A 800 A
T.O. PEDESTAL EL + 0.8 M P1 P3 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.8 * 0.8 * (2.375 - 1.2) * 2.5 ) = 1.88 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/8 STAAD NODE NO. 67
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 29.611 24.308 18.362 13.059 1.5 31.421 29.611
102 DL+LL+EQP+BT+WL+XPR 2 21.159 10.862 17.923 7.626 1.2 25.549 21.159
103 DL+LL+EQP+BT+WL+XSUC 3 23.617 17.495 18.320 12.198 1.2 30.518 23.617
104 DL+LL+EQP+BT+WL-XPR 4 29.772 23.578 16.262 10.068 1.2 26.330 29.772
105 DL+LL+EQP+BT+WL-XSUC 5 34.168 28.016 18.804 12.652 1.2 31.456 34.168
106 DL+LL+EQP+BT+WL+ZPR 6 25.044 16.390 17.420 8.766 1.2 26.186 25.044
107 DL+LL+EQP+BT+WL+ZSUC 7 27.321 22.830 18.055 13.564 1.2 31.619 27.321
108 DL+LL+EQP+BT+WL-ZPR 8 24.396 21.184 16.996 13.784 1.2 30.780 24.396
109 DL+LL+EQP+BT+WL-ZSUC 9 25.271 20.725 15.780 11.234 1.2 27.014 25.271
110 DL+LL+EQP+BT+SLX 10 17.585 12.331 19.094 13.840 1.2 32.934 17.585
111 DL+LL+EQP+BT-SLX 11 28.570 22.461 19.189 13.080 1.2 32.269 28.570
112 DL+LL+EQP+BT+SLZ 12 37.712 32.373 17.973 12.633 1.2 30.606 37.712
113 DL+LL+EQP+BT-SLZ 13 26.727 22.242 17.878 13.393 1.2 31.271 26.727
115 DL+EQP+BT+WL+XPR 14 14.650 5.299 11.571 2.220 1.5 13.791 14.650
116 DL+EQP+BT+WL+XSUC 15 17.111 11.935 11.965 6.789 1.5 18.754 17.111
117 DL+EQP+BT+WL-XPR 16 23.259 18.017 9.908 4.666 1.5 14.574 23.259
118 DL+EQP+BT+WL-XSUC 17 27.656 22.456 12.449 7.249 1.5 19.698 27.656
119 DL+EQP+BT+WL+ZPR 18 18.535 10.832 11.063 3.360 1.5 14.423 18.535
120 DL+EQP+BT+WL+ZSUC 19 20.812 17.273 11.697 8.158 1.5 19.855 20.812
121 DL+EQP+BT+WL-ZPR 20 17.890 15.623 10.642 8.375 1.5 19.017 17.890
122 DL+EQP+BT+WL-ZSUC 21 18.765 15.165 9.425 5.825 1.5 15.250 18.765
123 DL+EQP+BT+SLX 22 11.079 6.770 12.740 8.431 1.5 21.171 11.079
124 DL+EQP+BT-SLX 23 22.064 16.901 12.834 7.671 1.5 20.505 22.064
125 DL+EQP+BT+SLZ 24 31.203 26.809 11.621 7.227 1.5 18.848 31.203
126 DL+EQP+BT-SLZ 25 20.218 16.684 11.521 7.987 1.5 19.508 20.218
32.934
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 31.203 t
(L.C - 24)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 24
Moment at line A-A =
(31.203+11.621)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*(0.45+0.75-0.4)*1.2*2.5
= 12.68 t-m

Mu / b.d2 = 1.5x12.68x10^7/ (2400x1117^2) = 0.064 N/sqmm


pt = 0.015 % Ast rqd = 4 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 24
d= 1101 mm
Moment at line C-C =
(31.203+26.809)x(0.75-0.4)-0.5*(0.45+0.75-0.8/2)*2.4*1.2*(0.45+0.75-0.4)*2.5
= 18 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x18x10^7/ (2400x1101^2) = 0.093 N/sqmm
pt = 0.021 % Ast rqd = 5.5 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z- Z AS PER CLAUSE 34.2.4.2 of IS 456
4.758 1.772
column column

P1 P3
31.203 11.621

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


208.5 208.5

23.617
Shear along Z-Z =
(AT d/2 from column face)
= (4.758+1.772)-(0.45+0.75-0.8/2-1.117/2)*2.4*1.2*2.5
= 4.73 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x4.73x10^4/(2400x1117) = 0.026 N/sqmm. Ok

SHEAR ALONG X- X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 5.17 4.45 0

31.203 26.809 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
200.500 200.500 200.500

Shear along X-X =


= (5.17+4.45+-(0.45+0.75-0.8/2-1.101/2)*2.4*1.2*2.5) t
= 7.824 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x7.8236x10^4/(2400x1101) = 0.044 N/sqmm. Ok

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.8 + 1.101 / 2 * 2)+ (0.8 + 1.101 / 2 * 2 ) ) * 2 = 7.604 m


Punching area = 7.604 * 1.101 = 8.372 sq.m
Punching shear = 85.34 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 85.34 * 104 / 8.372 / 106 = 0.15 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 800 / 800 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC1 FOR A3 C
B3
Size of column = 1000 x1000 P1 P4
No. of piles = 6
Depth of pile cap = 1.2 m 1000 B1
Dia of pile = 0.6 m A A
Capacity of pile = 48 t c.g Z
TOP OF PILECAP EL -0.375 M Pile B P2 P5
FGL EL 0 M A3 1000
T.O. PEDESTAL EL + 0.8 M P3 P6 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.7x3.9x1.2 X Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (1 * 1 * (2.375 - 1.2) * 2.5 ) = 2.94 t L
Distance along X = L1 = 0.9m
Distance along X = L2 = 0.45m
L = 2.7m
B1 = 1.5m
B2 = 1.5m
B3 = 0.45m
B = 3.9m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - A/3 STAAD NODE NO. 1
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4 P5 P6
CASE Design
101 DL+LL+EQP+BT*1.25 1 15.738 16.483 17.228 25.321 25.916 26.743 1.5
102 DL+LL+EQP+BT+WL+XPR 2 5.782 8.930 12.079 15.720 18.719 21.731 1.2
103 DL+LL+EQP+BT+WL+XSUC 3 6.291 10.226 14.162 14.904 18.690 22.417 1.2
104 DL+LL+EQP+BT+WL-XPR 4 24.490 22.297 20.104 34.428 32.085 30.242 1.2
105 DL+LL+EQP+BT+WL-XSUC 5 25.029 23.624 22.218 33.548 31.992 30.864 1.2
106 DL+LL+EQP+BT+WL+ZPR 6 9.070 9.014 8.957 -6.358 -6.564 -6.465 1.2
107 DL+LL+EQP+BT+WL+ZSUC 7 9.272 10.060 10.847 -7.481 -6.844 -5.978 1.2
108 DL+LL+EQP+BT+WL-ZPR 8 24.927 24.027 23.128 58.338 57.289 56.621 1.2
109 DL+LL+EQP+BT+WL-ZSUC 9 25.056 25.056 25.056 57.143 56.993 57.143 1.2
110 DL+LL+EQP+BT+SLX 10 11.018 12.704 14.391 19.442 20.978 22.662 1.2
111 DL+LL+EQP+BT-SLX 11 13.017 13.580 14.142 13.491 13.903 14.564 1.2
112 DL+LL+EQP+BT+SLZ 12 16.811 17.374 17.936 25.330 25.742 26.403 1.2
113 DL+LL+EQP+BT-SLZ 13 16.811 17.374 17.936 25.330 25.742 26.403 1.2
115 DL+EQP+BT+WL+XPR 14 0.477 3.738 6.999 8.333 11.444 14.559 1.5
116 DL+EQP+BT+WL+XSUC 15 0.986 5.034 9.082 7.517 11.415 15.245 1.5
117 DL+EQP+BT+WL-XPR 16 19.185 17.105 15.025 27.041 24.811 23.070 1.5
118 DL+EQP+BT+WL-XSUC 17 19.725 18.432 17.138 26.161 24.718 23.692 1.5
119 DL+EQP+BT+WL+ZPR 18 3.765 3.821 3.878 -13.745 -13.839 -13.638 1.5
120 DL+EQP+BT+WL+ZSUC 19 3.968 4.867 5.767 -14.868 -14.118 -13.150 1.5
121 DL+EQP+BT+WL-ZPR 20 19.622 18.835 18.048 50.951 50.014 49.449 1.5
122 DL+EQP+BT+WL-ZSUC 21 19.752 19.864 19.977 49.756 49.718 49.971 1.5
123 DL+EQP+BT+SLX 22 5.713 7.512 9.311 12.055 13.704 15.489 1.5
124 DL+EQP+BT-SLX 23 7.713 8.387 9.062 6.104 6.628 7.392 1.5
125 DL+EQP+BT+SLZ 24 11.507 12.182 12.856 17.943 18.468 19.231 1.5
126 DL+EQP+BT-SLZ 25 11.507 12.182 12.856 17.943 18.468 19.231 1.5

Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 50.951 t
(L.C - 20)
Minm. Pile Reaction considered in Pilecap design for Top reinf. = -14.868 t
(L.C - 19)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2700 mm
LOAD CASE- 20
Moment at line A-A =
(19.622+50.951)x(1.5-0.5)-0.5*(0.45+1.5-1/2)*2.7*(0.45+1.5-0.5)*1.2*2.5
= 62.06 t-m

Mu / b.d2 = 1.5x62.06x10^7/ (2700x1117^2) = 0.276 N/sqmm


pt = 0.064 % Ast rqd = 19.3 sqcm
Provide 16tor @150c/c alth at bottom along X direction. 36.19 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along X direction. 36.19 sqcm

LOAD CASE- 20
d= 1101 mm
Moment at line C-C =
(50.951+50.014+49.449)x(0.9-0.5)-0.5*(0.45+0.9-1/2)*2.7*1.2*(0.45+0.9-0.5)*2.5
= 55.94 tm
Width of pile cap on line C-C = 3900 m
Mu / b.d2 = 1.5x55.94x10^7/ (3900x1101^2) = 0.177 N/sqmm
pt = 0.041 % Ast rqd = 17.6 sqcm
16tor @150c/c alth at bottom along Z direction. 52.28 sqcm (Pt prov. = 0.122 % )
16tor @150c/c alth at top.along Z dirn. 52.28 sqcm

Check for shear: ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


19.622 50.951
column column

P1 P4
19.622 50.951

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


-441.5 -441.5
Shear along X-X =
(AT d/2 from column face)
= (19.622+50.951)-(0.45+1.5-1/2-1.117/2)*2.7*1.2*2.5
= 63.29 t
Provided reinforcement % = 100x36.19/(270x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x63.29x10^4/(2700x1117) = 0.315 N/sqmm.
tc.b.d = 80.22 t
Shear Stirrups
With 8 tor open links (with every bar) No. of Ties = 16
16 L 8 Tor @ 150 c/c Vus = 256.79 t
Total shear capacity = 337.01 t. > 94.94 t Ok
SHEAR ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
P4 P5 P6
column 12.7 12.46 12.32

50.951 50.014 49.449

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
150.500 150.500 150.500

Shear along Z-Z =


= (12.7+12.46+12.32-(0.45+0.9-1/2-1.101/2)*3.9*1.2*2.5) t
= 33.976 t
Provided reinforcement % = 100x52.28/(390x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x33.97585x10^4/(3900x1101) = 0.119 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 1 + 1.101 / 2 * 2)+ (1 + 1.101 / 2 * 2 ) ) * 2 = 8.404 m


Punching area = 8.404 * 1.101 = 9.2528 sq.m
Punching shear = 206.919 t (Summing all pile loads for Load Comb-20)
tv =punching shear stress = 1.5 * 206.919 * 104 / 9.2528 / 106 = 0.34 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 1000 / 1000 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC7 FOR C3 C
B3
Size of column = 1000 x1000 P2 P3
No. of piles = 4
Depth of pile cap = 1.2 m 1000 B1
Dia of pile = 0.6 m A A
Capacity of pile = 43 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C3
FGL EL 0 M 1000
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (1 * 1 * (2.375 - 1.2) * 2.5 ) = 2.94 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/3 STAAD NODE NO. 3
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 28.404 40.594 37.911 40.594 1.5 78.505 28.404
102 DL+LL+EQP+BT+WL+XPR 2 14.368 46.722 46.722 46.722 1.2 93.444 14.368
103 DL+LL+EQP+BT+WL+XSUC 3 17.373 49.420 46.967 49.420 1.2 96.387 17.373
104 DL+LL+EQP+BT+WL-XPR 4 38.195 26.848 26.695 26.848 1.2 53.543 38.195
105 DL+LL+EQP+BT+WL-XSUC 5 41.252 29.445 26.838 29.445 1.2 56.283 41.252
106 DL+LL+EQP+BT+WL+ZPR 6 19.905 35.545 32.785 35.545 1.2 68.330 19.905
107 DL+LL+EQP+BT+WL+ZSUC 7 22.330 38.123 32.910 38.123 1.2 71.033 22.330
108 DL+LL+EQP+BT+WL-ZPR 8 35.553 40.307 39.387 40.307 1.2 79.694 35.553
109 DL+LL+EQP+BT+WL-ZSUC 9 37.902 42.962 39.588 42.962 1.2 82.550 37.902
110 DL+LL+EQP+BT+SLX 10 22.047 42.900 40.293 42.900 1.2 83.193 22.047
111 DL+LL+EQP+BT-SLX 11 26.370 37.870 35.570 37.870 1.2 73.440 26.370
112 DL+LL+EQP+BT+SLZ 12 29.462 39.735 37.128 39.735 1.2 76.863 29.462
113 DL+LL+EQP+BT-SLZ 13 29.462 39.735 37.128 39.735 1.2 76.863 29.462
115 DL+EQP+BT+WL+XPR 14 1.952 30.165 31.238 30.165 1.5 61.403 1.952
116 DL+EQP+BT+WL+XSUC 15 4.957 32.863 31.483 32.863 1.5 64.346 4.957
117 DL+EQP+BT+WL-XPR 16 25.778 10.292 11.212 10.292 1.5 21.504 25.778
118 DL+EQP+BT+WL-XSUC 17 28.835 12.888 11.355 12.888 1.5 24.243 28.835
119 DL+EQP+BT+WL+ZPR 18 7.488 18.988 17.302 18.988 1.5 36.290 7.488
120 DL+EQP+BT+WL+ZSUC 19 9.913 21.567 17.427 21.567 1.5 38.994 9.913
121 DL+EQP+BT+WL-ZPR 20 23.137 23.750 23.903 23.750 1.5 47.653 23.137
122 DL+EQP+BT+WL-ZSUC 21 25.485 26.405 24.105 26.405 1.5 50.510 25.485
123 DL+EQP+BT+SLX 22 9.630 26.343 24.810 26.343 1.5 51.153 9.630
124 DL+EQP+BT-SLX 23 13.953 21.313 20.087 21.313 1.5 41.400 13.953
125 DL+EQP+BT+SLZ 24 17.045 23.178 21.645 23.178 1.5 44.823 17.045
126 DL+EQP+BT-SLZ 25 17.045 23.178 21.645 23.178 1.5 44.823 17.045
96.387
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 40.594 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(40.594+37.911)x(0.75-0.5)-0.5*(0.45+0.75-1/2)*2.4*(0.45+0.75-0.5)*1.2*2.5
= 17.86 t-m

Mu / b.d2 = 1.5x17.86x10^7/ (2400x1117^2) = 0.089 N/sqmm


pt = 0.021 % Ast rqd = 5.6 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(28.404+40.594)x(0.75-0.5)-0.5*(0.45+0.75-1/2)*2.4*1.2*(0.45+0.75-0.5)*2.5
= 15.49 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x15.49x10^7/ (2400x1101^2) = 0.08 N/sqmm
pt = 0.018 % Ast rqd = 4.8 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
0 0
column column

P2 P3
40.594 37.911
Thus, the shear line falls beyond the pile
Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300 extent.Hence, no shear will develop from
308.5 308.5 pile reaction.

17.373
Shear along X-X =
(AT d/2 from column face, outer side of pile)
= (0+0)
= 0t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x0x10^4/(2400x1117) = 0 N/sqmm. Hence o.k

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 0 0 0

28.404 40.594 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
300.500 300.500 300.500
Thus, the shear line falls beyond the pile extent.Hence, no shear will develop from pile reaction.
Shear along Z-Z =
= (0+0) t
= 0.000 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x0x10^4/(2400x1101) = 0 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 1 + 1.101 / 2 * 2)+ (1 + 1.101 / 2 * 2 ) ) * 2 = 8.404 m


Punching area = 8.404 * 1.101 = 9.2528 sq.m
Punching shear = 147.503 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 147.503 * 104 / 9.2528 / 106 = 0.24 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 1000 / 1000 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC8 FOR C2 C
B3
Size of column = 850 x850 P2 P3
No. of piles = 4
Depth of pile cap = 1.2 m 850 B1
Dia of pile = 0.6 m A A
Capacity of pile = 36 t c.g X
TOP OF PILECAP EL -0.375 M Pile B C2
FGL EL 0 M 850
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.85 * 0.85 * (2.375 - 1.2) * 2.5 ) = 2.12 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - C/2 STAAD NODE NO. 7
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 35.436 35.436 35.091 35.436 1.5 70.527 35.436
102 DL+LL+EQP+BT+WL+XPR 2 34.972 35.125 34.818 35.125 1.2 69.943 34.972
103 DL+LL+EQP+BT+WL+XSUC 3 35.202 34.895 34.588 34.895 1.2 69.483 35.202
104 DL+LL+EQP+BT+WL-XPR 4 35.048 35.048 34.742 35.048 1.2 69.790 35.048
105 DL+LL+EQP+BT+WL-XSUC 5 35.278 34.818 34.512 34.818 1.2 69.330 35.278
106 DL+LL+EQP+BT+WL+ZPR 6 34.818 35.278 34.972 35.278 1.2 70.250 34.818
107 DL+LL+EQP+BT+WL+ZSUC 7 34.972 34.972 34.818 34.972 1.2 69.790 34.972
108 DL+LL+EQP+BT+WL-ZPR 8 34.742 35.508 35.048 35.508 1.2 70.556 34.742
109 DL+LL+EQP+BT+WL-ZSUC 9 34.972 35.278 34.818 35.278 1.2 70.096 34.972
110 DL+LL+EQP+BT+SLX 10 35.125 34.972 34.665 34.972 1.2 69.637 35.125
111 DL+LL+EQP+BT-SLX 11 34.972 34.972 34.818 34.972 1.2 69.790 34.972
112 DL+LL+EQP+BT+SLZ 12 35.048 35.048 34.742 35.048 1.2 69.790 35.048
113 DL+LL+EQP+BT-SLZ 13 35.048 35.048 34.742 35.048 1.2 69.790 35.048
115 DL+EQP+BT+WL+XPR 14 20.897 21.050 20.743 21.050 1.5 41.793 20.897
116 DL+EQP+BT+WL+XSUC 15 21.127 20.820 20.513 20.820 1.5 41.333 21.127
117 DL+EQP+BT+WL-XPR 16 20.973 20.973 20.667 20.973 1.5 41.640 20.973
118 DL+EQP+BT+WL-XSUC 17 21.203 20.743 20.437 20.743 1.5 41.180 21.203
119 DL+EQP+BT+WL+ZPR 18 20.743 21.203 20.897 21.203 1.5 42.100 20.743
120 DL+EQP+BT+WL+ZSUC 19 20.897 20.897 20.743 20.897 1.5 41.640 20.897
121 DL+EQP+BT+WL-ZPR 20 20.667 21.433 20.973 21.433 1.5 42.406 20.667
122 DL+EQP+BT+WL-ZSUC 21 20.897 21.203 20.743 21.203 1.5 41.946 20.897
123 DL+EQP+BT+SLX 22 21.050 20.897 20.590 20.897 1.5 41.487 21.050
124 DL+EQP+BT-SLX 23 20.897 20.897 20.743 20.897 1.5 41.640 20.897
125 DL+EQP+BT+SLZ 24 20.973 20.973 20.667 20.973 1.5 41.640 20.973
126 DL+EQP+BT-SLZ 25 20.973 20.973 20.667 20.973 1.5 41.640 20.973
70.556
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 35.436 t
(L.C - 1)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 1
Moment at line A-A =
(35.436+35.091)x(0.75-0.425)-0.5*(0.45+0.75-0.85/2)*2.4*(0.45+0.75-0.425)*1.2*2.5
= 20.76 t-m

Mu / b.d2 = 1.5x20.76x10^7/ (2400x1117^2) = 0.104 N/sqmm


pt = 0.024 % Ast rqd = 6.4 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 1
d= 1101 mm
Moment at line C-C =
(35.436+35.436)x(0.75-0.425)-0.5*(0.45+0.75-0.85/2)*2.4*1.2*(0.45+0.75-0.425)*2.5
= 20.87 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x20.87x10^7/ (2400x1101^2) = 0.108 N/sqmm
pt = 0.025 % Ast rqd = 6.6 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
3.927 3.889
column column

P2 P3
35.436 35.091

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


233.5 233.5

35.202
Shear along X-X =
(AT d/2 from column face)
= (3.927+3.889)-(0.45+0.75-0.85/2-1.117/2)*2.4*1.2*2.5
= 6.2 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x6.2x10^4/(2400x1117) = 0.035 N/sqmm. Ok

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 4.4 4.4 0

35.436 35.436 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
225.500 225.500 225.500

Shear along Z-Z =


= (4.4+4.4+-(0.45+0.75-0.85/2-1.101/2)*2.4*1.2*2.5) t
= 7.184 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x7.1836x10^4/(2400x1101) = 0.041 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.85 + 1.101 / 2 * 2)+ (0.85 + 1.101 / 2 * 2 ) ) * 2 = 7.804 m


Punching area = 7.804 * 1.101 = 8.5922 sq.m
Punching shear = 141.399 t (Summing all pile loads for Load Comb-1)
tv =punching shear stress = 1.5 * 141.399 * 104 / 8.5922 / 106 = 0.25 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 850 / 850 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC13 FOR E2 C
B3
Size of column = 750 x750 P2 P3
No. of piles = 4
Depth of pile cap = 1.2 m 750 B1
Dia of pile = 0.6 m
Capacity of pile = 48 t c.g X
TOP OF PILECAP EL -0.375 M Pile B E2
FGL EL 0 M A 750 A
T.O. PEDESTAL EL + 0.75 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.325 m c.g
S/W of Column = (0.75 * 0.75 * (2.325 - 1.2) * 2.5 ) = 1.58 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - E/2 STAAD NODE NO. 14
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 23.641 33.339 26.899 33.339 1.5 60.238 23.641
102 DL+LL+EQP+BT+WL+XPR 2 29.692 51.465 41.498 51.465 1.2 92.963 29.692
103 DL+LL+EQP+BT+WL+XSUC 3 30.448 49.002 39.342 49.002 1.2 88.344 30.448
104 DL+LL+EQP+BT+WL-XPR 4 15.470 11.177 8.570 11.177 1.2 19.747 15.470
105 DL+LL+EQP+BT+WL-XSUC 5 16.227 8.713 6.413 8.713 1.2 15.126 16.227
106 DL+LL+EQP+BT+WL+ZPR 6 58.890 63.183 24.850 63.183 1.2 88.033 58.890
107 DL+LL+EQP+BT+WL+ZSUC 7 59.822 61.048 22.868 61.048 1.2 83.916 59.822
108 DL+LL+EQP+BT+WL-ZPR 8 -14.573 3.213 28.513 3.213 1.2 31.726 -14.573
109 DL+LL+EQP+BT+WL-ZSUC 9 -13.718 1.155 26.608 1.155 1.2 27.763 -13.718
110 DL+LL+EQP+BT+SLX 10 29.695 43.648 34.295 43.648 1.2 81.243 29.695
111 DL+LL+EQP+BT-SLX 11 34.657 40.330 24.383 40.330 1.2 64.713 34.657
112 DL+LL+EQP+BT+SLZ 12 23.078 30.898 24.612 30.898 1.2 55.510 23.078
113 DL+LL+EQP+BT-SLZ 13 23.078 30.898 24.612 30.898 1.2 55.510 23.078
115 DL+EQP+BT+WL+XPR 14 21.437 42.443 36.003 42.443 1.5 78.446 21.437
116 DL+EQP+BT+WL+XSUC 15 22.193 39.980 33.847 39.980 1.5 73.827 22.193
117 DL+EQP+BT+WL-XPR 16 7.215 2.155 3.075 2.155 1.5 5.230 7.215
118 DL+EQP+BT+WL-XSUC 17 7.972 -0.308 0.918 -0.308 1.5 0.610 7.972
119 DL+EQP+BT+WL+ZPR 18 50.635 54.162 19.355 54.162 1.5 73.517 50.635
120 DL+EQP+BT+WL+ZSUC 19 51.567 52.027 17.373 52.027 1.5 69.400 51.567
121 DL+EQP+BT+WL-ZPR 20 -22.828 -5.808 23.018 -5.808 1.5 17.210 -22.828
122 DL+EQP+BT+WL-ZSUC 21 -21.973 -7.867 21.113 -7.867 1.5 13.246 -21.973
123 DL+EQP+BT+SLX 22 21.440 34.627 28.800 34.627 1.5 63.427 21.440
124 DL+EQP+BT-SLX 23 26.402 31.308 18.888 31.308 1.5 50.196 26.402
125 DL+EQP+BT+SLZ 24 14.823 21.877 19.117 21.877 1.5 40.994 14.823
126 DL+EQP+BT-SLZ 25 14.823 21.877 19.117 21.877 1.5 40.994 14.823
92.963
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 54.162 t
(L.C - 18)
Minm. Pile Reaction considered in Pilecap design for Top reinf. = -22.828 t
(L.C - 20)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 6
Moment at line A-A =
(50.635+54.162)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.375)*1.2*2.5
= 36.85 t-m

Mu / b.d2 = 1.5x36.85x10^7/ (2400x1117^2) = 0.185 N/sqmm


pt = 0.043 % Ast rqd = 11.5 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

LOAD CASE- 20
Moment at line A-A =
(-22.828+-5.808)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.375)*2.5-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.75/2)*(0+1.575-1.2)*1.8
= -26.22 t-m

Mu / b.d2 = 1.5x-26.22x10^7/ (2400x1117^2) = 0.131 N/sqmm


pt = 0.03 % Ast rqd = 8 sqcm
Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

LOAD CASE- 6
d= 1101 mm
Moment at line C-C =
(50.635+54.162)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*1.2*(0.45+0.75-0.375)*2.5
= 36.85 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x36.85x10^7/ (2400x1101^2) = 0.19 N/sqmm
pt = 0.044 % Ast rqd = 11.6 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

LOAD CASE- 20
Moment at line A-A =
(-22.828+-5.808)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.375)*2.5-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.75/2)*(0+1.575-1.2)*1.8
= -13.74 t-m

Mu / b.d2 = 1.5x-13.74x10^7/ (2400x1101^2) = 0.071 N/sqmm


pt = 0.016 % Ast rqd = 4.2 sqcm
16tor @150c/c alth at top.along X dirn. 32.17 sqcm (Pt prov. = 0.122 % )
Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
10.516 3.758
column column

P2 P3
54.162 19.355

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


183.5 183.5

30.448
Shear along X-X =
(AT d/2 from column face)
= (10.516+3.758)-(0.45+0.75-0.75/2-1.117/2)*2.4*1.2*2.5
= 12.3 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x12.3x10^4/(2400x1117) = 0.069 N/sqmm. Hence o.k

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 10.51 11.24 0

50.635 54.162 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
175.500 175.500 175.500

Shear along Z-Z =


= (10.51+11.24+-(0.45+0.75-0.75/2-1.101/2)*2.4*1.2*2.5) t
= 19.774 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x19.7736x10^4/(2400x1101) = 0.112 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.75 + 1.101 / 2 * 2)+ (0.75 + 1.101 / 2 * 2 ) ) * 2 = 7.404 m


Punching area = 7.404 * 1.101 = 8.1518 sq.m
Punching shear = 178.314 t (Summing all pile loads for Load Comb-18)
tv =punching shear stress = 1.5 * 178.314 * 104 / 8.1518 / 106 = 0.33 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 750 / 750 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.
DESIGN OF PILE CAP PC14 FOR E2' C
B3
Size of column = 750 x750 P2 P3
No. of piles = 4
Depth of pile cap = 1.2 m 750 B1
Dia of pile = 0.6 m A A
Capacity of pile = 43 t c.g X
TOP OF PILECAP EL -0.375 M Pile B E2'
FGL EL 0 M 750
T.O. PEDESTAL EL + 0.8 M P1 P4 B2
BOT. OF PILECAP EL -1.575 M
PILE CUTOFF LVL EL -1.5 M B3

600 DIA PILE C


TYP. L2 L1 L1 L2
Size of pile cap = 2.4x2.4x1.2 Z Pile
Bottom of pile cap from BOBP = 2.375 m c.g
S/W of Column = (0.75 * 0.75 * (2.375 - 1.2) * 2.5 ) = 1.65 t L
Distance along X = L1 = 0.75m
Distance along X = L2 = 0.45m
L = 2.4m
B1 = 0.75m
B2 = 0.75m
B3 = 0.45m
B = 2.4m

LOAD COMB: (PILE REACTIONS ARE OBTAINED FROM APPROVED PILE LAYOUT DESIGN)
COL. GRID MKD. - E/2' STAAD NODE NO. 15
LOAD Multiplying Factor for
LOAD COMB: P1 P2 P3 P4
CASE Design
101 DL+LL+EQP+BT*1.25 1 26.586 30.179 37.979 30.179 1.5 68.158 26.586
102 DL+LL+EQP+BT+WL+XPR 2 30.089 40.737 50.001 40.737 1.2 90.738 30.089
103 DL+LL+EQP+BT+WL+XSUC 3 30.451 38.118 47.489 38.118 1.2 85.607 30.451
104 DL+LL+EQP+BT+WL-XPR 4 17.578 14.064 18.962 14.064 1.2 33.026 17.578
105 DL+LL+EQP+BT+WL-XSUC 5 17.940 11.445 16.450 11.445 1.2 27.895 17.940
106 DL+LL+EQP+BT+WL+ZPR 6 15.882 25.039 10.558 25.039 1.2 35.597 15.882
107 DL+LL+EQP+BT+WL+ZSUC 7 16.316 22.705 8.224 22.705 1.2 30.929 16.316
108 DL+LL+EQP+BT+WL-ZPR 8 30.863 34.270 63.127 34.270 1.2 97.397 30.863
109 DL+LL+EQP+BT+WL-ZSUC 9 31.297 31.936 60.793 31.936 1.2 92.729 31.297
110 DL+LL+EQP+BT+SLX 10 29.157 35.545 44.383 35.545 1.2 79.928 29.157
111 DL+LL+EQP+BT-SLX 11 21.381 25.320 25.959 25.320 1.2 51.279 21.381
112 DL+LL+EQP+BT+SLZ 12 23.984 26.965 34.206 26.965 1.2 61.171 23.984
113 DL+LL+EQP+BT-SLZ 13 23.984 26.965 34.206 26.965 1.2 61.171 23.984
115 DL+EQP+BT+WL+XPR 14 22.301 32.417 39.339 32.417 1.5 71.756 22.301
116 DL+EQP+BT+WL+XSUC 15 22.664 29.798 36.826 29.798 1.5 66.624 22.664
117 DL+EQP+BT+WL-XPR 16 9.790 5.744 8.300 5.744 1.5 14.044 9.790
118 DL+EQP+BT+WL-XSUC 17 10.153 3.125 5.787 3.125 1.5 8.912 10.153
119 DL+EQP+BT+WL+ZPR 18 8.095 16.720 -0.105 16.720 1.5 16.615 8.095
120 DL+EQP+BT+WL+ZSUC 19 8.529 14.385 -2.439 14.385 1.5 11.946 8.529
121 DL+EQP+BT+WL-ZPR 20 23.076 25.951 52.464 25.951 1.5 78.415 23.076
122 DL+EQP+BT+WL-ZSUC 21 23.510 23.616 50.130 23.616 1.5 73.746 23.510
123 DL+EQP+BT+SLX 22 21.369 27.226 33.721 27.226 1.5 60.947 21.369
124 DL+EQP+BT-SLX 23 13.593 17.001 15.297 17.001 1.5 32.298 13.593
125 DL+EQP+BT+SLZ 24 16.196 18.645 23.544 18.645 1.5 42.189 16.196
126 DL+EQP+BT-SLZ 25 16.196 18.645 23.544 18.645 1.5 42.189 16.196
1.500 97.397
Maxm. Pile Reaction considered in Pilecap design for Bottom reinf. = 52.464 t
(L.C - 20)
Grade of concrete = M30 Grade of steel = Fe500
Clear cover = 75 mm
d= 1117 mm
width of pile cap on line A-A = 2400 mm
LOAD CASE- 20
Moment at line A-A =
(25.951+52.464)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*(0.45+0.75-0.375)*1.2*2.5
= 26.96 t-m

Mu / b.d2 = 1.5x26.96x10^7/ (2400x1117^2) = 0.135 N/sqmm


pt = 0.031 % Ast rqd = 8.3 sqcm
Provide 16tor @150c/c alth at bottom along Z direction. 32.17 sqcm (Pt prov. = 0.12 % )

Provide 16tor @150c/c alth at top. along Z direction. 32.17 sqcm

LOAD CASE- 20
d= 1101 mm
Moment at line C-C =
(23.076+25.951)x(0.75-0.375)-0.5*(0.45+0.75-0.75/2)*2.4*1.2*(0.45+0.75-0.375)*2.5
= 15.93 tm
Width of pile cap on line C-C = 2400 m
Mu / b.d2 = 1.5x15.93x10^7/ (2400x1101^2) = 0.082 N/sqmm
pt = 0.019 % Ast rqd = 5 sqcm
16tor @150c/c alth at bottom along X direction. 32.17 sqcm (Pt prov. = 0.122 % )

16tor @150c/c alth at top.along X dirn. 32.17 sqcm


Check for shear: ALONG Z-Z AS PER CLAUSE 34.2.4.2 of IS 456
5.039 10.187
column column

P2 P3
25.951 52.464

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


183.5 183.5

30.451
Shear along X-X =
(AT d/2 from column face)
= (5.039+10.187)-(0.45+0.75-0.75/2-1.117/2)*2.4*1.2*2.5
= 13.25 t
Provided reinforcement % = 100x32.17/(240x111.7)= 0.12 %
tc = 0.266 N/sqmm. tv = 1.5x13.25x10^4/(2400x1117) = 0.074 N/sqmm. Ok

SHEAR ALONG X-X AS PER CLAUSE 34.2.4.2 of IS 456


P1 P2 P6
column 4.79 5.38 0

23.076 25.951 0.000

Dp/2=300 Dp/2=300 Dp/2=300 Dp/2=300


Dp/2=300 Dp/2=300
175.500 175.500 175.500

Shear along Z-Z =


= (4.79+5.38+-(0.45+0.75-0.75/2-1.101/2)*2.4*1.2*2.5) t
= 8.194 t
Provided reinforcement % = 100x32.17/(240x110.1)= 0.122 %
tc = 0.268 N/sqmm. tv = 1.5x8.1936x10^4/(2400x1101) = 0.047 N/sqmm. Hence o.k

Check for Punching Shear : (at d/2 from pedestal face)

Punching perimeter = ( ( 0.75 + 1.101 / 2 * 2)+ (0.75 + 1.101 / 2 * 2 ) ) * 2 = 7.404 m


Punching area = 7.404 * 1.101 = 8.1518 sq.m
Punching shear = 127.442 t (Summing all pile loads for Load Comb-20)
tv =punching shear stress = 1.5 * 127.442 * 104 / 8.1518 / 106 = 0.23 N/sq.mm
As per clause 31.6.3.1 of IS : 456-2000, tc = 0.25 * fck * ks
ks = (0.5+b) > 1, b= 750 / 750 = 1 , ks = 1
tc = 1.369 N/sq.mm > tv, hence okay.