Foundation system
The foundation system consists of pile caps under each column
tied by the cross beams at the pile cap level. This distributes the lateral shear from the columns
evenly onto all the piles in the row.
Pile Capacities : A B C D
Pile diameter = 600 mm 600 mm 600 mm 600 mm
Pile cut off level below FGL = 1.5 m 1.5 m 1.5 m 1.5 m
Pile length below cut off = 22 m 25 m 28 m 30 m
Vertical load capacity = 28 tons 36 tons 43 tons 48 tons
Tensile load capacity = 20 tons 27 tons 31 tons 38 tons
Lateral load capacity = 4.2 tons 4.2 tons 4.2 tons 4.2 tons
Pile capacities are increased by 25 % during seismic and wind loading cases.
A staad model is made with the loads from the load data drgs applied in the reverse signs on the
top joints at the base plate level. The supports are made fixed / pinned / fixed but ( i.e. moment
released in certain directions) depending on the pile cap geometry.
The support reactions from this staad file are used to ascertain the pile layout.
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
SC6 162 101 DL+LL+EQP+BT*1.25 0 7.285 0.001 0 0 0 10.265 10.27
102 DL+LL+EQP+BT+WL+XPR 0 7.485 0.001 0 0 0 10.465 10.47
103 DL+LL+EQP+BT+WL+XSUC 0 7.218 0 0 0 0 10.198 10.20
104 DL+LL+EQP+BT+WL-XPR 0 6.83 0 0 0 0 9.81 9.81
105 DL+LL+EQP+BT+WL-XSUC 0 6.742 0 0 0 0 9.722 9.72
106 DL+LL+EQP+BT+WL+ZPR 0 22.607 -0.029 0 0 0 25.587 25.59
107 DL+LL+EQP+BT+WL+ZSUC 0 6.96 -0.027 0 0 0 9.94 9.94
108 DL+LL+EQP+BT+WL-ZPR 0 -9.15 0.03 0 0 0 -6.17 -6.17
109 DL+LL+EQP+BT+WL-ZSUC 0 -9.666 0.031 0 0 0 -6.686 -6.69
110 DL+LL+EQP+BT+SLX 0 2.631 -0.008 0 0 0 5.611 5.61
111 DL+LL+EQP+BT+SLZ 0 18.117 -0.021 0 0 0 21.097 21.10
112 DL+LL+EQP+BT-SLX 0 11.286 0.008 0 0 0 14.266 14.27
113 DL+LL+EQP+BT-SLZ 0 -4.2 0.021 0 0 0 -1.22 -1.22 S/W of pile cap = 0.9 * 0.9 * 1.2*2.5 = 2.43 tons
115 DL+EQP+BT+WL+XPR 0 7.705 0.001 0 0 0 10.685 10.69 soil wt = 0.9*0.9*0.375*1.8 = 0.55 tons
116 DL+EQP+BT+WL+XSUC 0 7.438 0 0 0 0 10.418 10.42 Moment of inertia x-x = 0 m2
117 DL+EQP+BT+WL-XPR 0 7.05 0 0 0 0 10.03 10.03 Moment of inertia z-z = 0 m2
118 DL+EQP+BT+WL-XSUC 0 6.962 0 0 0 0 9.942 9.94 Section modulus about x-x = 0/0.75= 0m
119 DL+EQP+BT+WL+ZPR 0 22.827 -0.029 0 0 0 25.807 25.81 Section modulus about z-z = 0/0.75= 0m
120 DL+EQP+BT+WL+ZSUC 0 7.18 -0.027 0 0 0 10.16 10.16
121 DL+EQP+BT+WL-ZPR 0 -8.93 0.03 0 0 0 -5.95 -5.95 PMAX = 25.81 Tons PMIN = ###
122 DL+EQP+BT+WL-ZSUC 0 -9.446 0.031 0 0 0 -6.466 -6.47
123 DL+EQP+BT+SLX 0 2.851 -0.008 0 0 0 5.831 5.83 PILE LENGTH = 22 M
124 DL+EQP+BT+SLZ 0 18.337 -0.021 0 0 0 21.317 21.32 PILE CAPACITY = 28 Tons / 35 Tons ( compression )
125 DL+EQP+BT-SLX 0 11.506 0.008 0 0 0 14.486 14.49 (normal / wind-seismic) 20 Tons / 25 Tons ( tension )
126 DL+EQP+BT-SLZ 0 -3.98 0.021 0 0 0 -1 -1.00
SC7 165 101 DL+LL+EQP+BT*1.25 0 5.277 0 0 0 0 8.257 8.26
102 DL+LL+EQP+BT+WL+XPR 0 4.334 0 0 0 0 7.314 7.31
103 DL+LL+EQP+BT+WL+XSUC 0 5.432 0 0 0 0 8.412 8.41
104 DL+LL+EQP+BT+WL-XPR 0 4.986 0 0 0 0 7.966 7.97
105 DL+LL+EQP+BT+WL-XSUC 0 5.907 0 0 0 0 8.887 8.89
106 DL+LL+EQP+BT+WL+ZPR 0 -10.557 0 0 0 0 -7.577 -7.58
107 DL+LL+EQP+BT+WL+ZSUC 0 5.627 0 0 0 0 8.607 8.61
108 DL+LL+EQP+BT+WL-ZPR 0 21.514 0 0 0 0 24.494 24.49
109 DL+LL+EQP+BT+WL-ZSUC 0 22.869 0 0 0 0 25.849 25.85
110 DL+LL+EQP+BT+SLX 0 10.02 0 0 0 0 13 13.00
111 DL+LL+EQP+BT+SLZ 0 -5.738 0 0 0 0 -2.758 -2.76
112 DL+LL+EQP+BT-SLX 0 1.192 0 0 0 0 4.172 4.17
113 DL+LL+EQP+BT-SLZ 0 16.951 0 0 0 0 19.931 19.93 S/W of pile cap = 0.9 * 0.9 * 1.2*2.5 = 2.43 tons
115 DL+EQP+BT+WL+XPR 0 3.217 0 0 0 0 6.197 6.20 soil wt = 0.9*0.9*0.375*1.8 = 0.55 tons
116 DL+EQP+BT+WL+XSUC 0 4.315 0 0 0 0 7.295 7.30 Moment of inertia x-x = 0 m2
117 DL+EQP+BT+WL-XPR 0 3.869 0 0 0 0 6.849 6.85 Moment of inertia z-z = 0 m2
118 DL+EQP+BT+WL-XSUC 0 4.79 0 0 0 0 7.77 7.77 Section modulus about x-x = 0/0.75= 0m
119 DL+EQP+BT+WL+ZPR 0 -11.674 0 0 0 0 -8.694 -8.69 Section modulus about z-z = 0/0.75= 0m
120 DL+EQP+BT+WL+ZSUC 0 4.51 0 0 0 0 7.49 7.49
121 DL+EQP+BT+WL-ZPR 0 20.397 0 0 0 0 23.377 23.38 PMAX = 25.85 Tons PMIN = ###
122 DL+EQP+BT+WL-ZSUC 0 21.752 0 0 0 0 24.732 24.73
123 DL+EQP+BT+SLX 0 8.903 0 0 0 0 11.883 11.88 PILE LENGTH = 22 M
124 DL+EQP+BT+SLZ 0 -6.855 0 0 0 0 -3.875 -3.88 PILE CAPACITY = 28 Tons / 35 Tons ( compression )
125 DL+EQP+BT-SLX 0 0.075 0 0 0 0 3.055 3.06 (normal / wind-seismic) 20 Tons / 25 Tons ( tension )
126 DL+EQP+BT-SLZ 0 15.834 0 0 0 0 18.814 18.81
A-8 195 101 DL+LL+EQP+BT*1.25 -0.018 33.963 9.131 30.34 0 1.101 55.13 24.26 4.04 3.30 23.53
102 DL+LL+EQP+BT+WL+XPR -0.188 29.257 8.268 28.356 0 1.492 P3
50.43 22.56 3.65 2.66 21.56
103 DL+LL+EQP+BT+WL+XSUC -0.994 29.51 7.109 25.69 0 3.346 50.68 22.35 5.22 2.99 20.12
104 DL+LL+EQP+BT+WL-XPR 0.478 30.388 9.052 30.159 0 -0.04 51.56 22.93 2.82 2.85 22.96 X
105 DL+LL+EQP+BT+WL-XSUC -0.327 30.504 7.848 27.39 0 1.812 51.67 22.65 4.39 3.18 21.44 P2
106 DL+LL+EQP+BT+WL+ZPR -0.983 46.53 1.954 13.834 0 3.321 67.70 22.64 13.42 11.21 20.43
107 DL+LL+EQP+BT+WL+ZSUC -0.178 -3.742 2.594 15.306 0 1.469 17.43 9.95 -0.26 -1.23 8.97
108 DL+LL+EQP+BT+WL-ZPR -0.988 10.445 17.153 48.792 0 3.332 31.62 25.28 -7.25 -9.47 23.06 P4
109 DL+LL+EQP+BT+WL-ZSUC -0.174 8.815 18.99 53.017 0 1.46 29.99 25.66 -9.69 -10.66 24.68
110 DL+LL+EQP+BT+SLX -0.06 28.362 12.678 38.499 0 1.198 49.53 25.62 -0.05 -0.85 24.82
111 DL+LL+EQP+BT+SLZ -0.007 48.602 -2.009 4.719 0 1.076 69.77 19.37 16.23 15.51 18.66
112 DL+LL+EQP+BT-SLX 0.028 38.97 4.772 20.315 0 0.995 60.14 22.14 8.59 7.93 21.48
P1
113 DL+LL+EQP+BT-SLZ -0.025 18.73 19.459 54.095 0 1.117 39.90 28.38 -7.68 -8.43 27.63
115 DL+EQP+BT+WL+XPR -0.193 19.447 4.241 19.094 0 1.504 40.62 17.02 4.29 3.29 16.02 Z
116 DL+EQP+BT+WL+XSUC -0.999 19.7 3.082 16.428 0 3.357 40.87 16.81 5.86 3.62 14.57
117 DL+EQP+BT+WL-XPR 0.473 20.578 5.025 20.897 0 -0.028 41.75 17.39 3.46 3.48 17.41 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC -0.332 20.694 3.821 18.128 0 1.823 41.86 17.12 5.03 3.82 15.90 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR -0.988 36.72 -2.073 4.572 0 3.332 57.89 17.11 14.06 11.84 14.89 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC -0.183 -13.552 -1.433 6.044 0 1.481 7.62 4.41 0.38 -0.60 3.43 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR -0.993 0.635 13.126 39.529 0 3.344 21.81 19.74 -6.61 -8.84 17.51 PMAX = 28.38 Tons PMIN = -10.66 Tons
122 DL+EQP+BT+WL-ZSUC -0.179 -0.995 14.963 43.755 0 1.471 20.18 20.12 -9.05 -10.03 19.14
123 DL+EQP+BT+SLX -0.065 18.552 8.651 29.237 0 1.209 39.72 20.08 0.59 -0.22 19.27 PILE LENGTH = 22 M
124 DL+EQP+BT+SLZ -0.012 38.792 -6.036 -4.543 0 1.087 59.96 13.84 16.87 16.14 13.11 PILE CAPACITY = 28 Tons / 35 Tons ( compression )
125 DL+EQP+BT-SLX 0.023 29.16 0.745 11.053 0 1.007 50.33 16.60 9.23 8.56 15.93 (normal / wind-seismic) 20 Tons / 25 Tons ( tension )
126 DL+EQP+BT-SLZ -0.03 8.92 15.432 44.833 0 1.129 30.09 22.84 -7.05 -7.80 22.09
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
B-8 10 101 DL+LL+EQP+BT*1.25 0.008 33.706 -6.669 -24.678 0 1.04 54.88 5.84 22.29 21.60 5.15
102 DL+LL+EQP+BT+WL+XPR -0.177 31.195 -7.579 -26.771 0 1.467 52.37 4.66 22.50 21.53 3.68 P3
103 DL+LL+EQP+BT+WL+XSUC -1.003 31.554 -7.409 -26.38 0 3.367 52.72 5.51 23.10 20.85 3.27
104 DL+LL+EQP+BT+WL-XPR 0.515 30.064 -7.418 -26.401 0 -0.125 51.23 3.97 21.57 21.65 4.05
105 DL+LL+EQP+BT+WL-XSUC -0.31 30.559 -7.244 -26.001 0 1.773 51.73 4.86 22.19 21.01 3.67 X
106 DL+LL+EQP+BT+WL+ZPR -0.983 14.534 -8.172 -28.135 0 3.321 P2
35.70 0.65 19.41 17.20 -1.56
107 DL+LL+EQP+BT+WL+ZSUC -0.16 -20.966 -8.283 -28.391 0 1.428 0.20 -8.94 9.99 9.04 -9.89
108 DL+LL+EQP+BT+WL-ZPR -0.985 50.619 -7.218 -25.941 0 3.325 71.79 10.41 27.70 25.49 8.19
109 DL+LL+EQP+BT+WL-ZSUC -0.156 52.249 -7.44 -26.452 0 1.419 73.42 10.01 27.65 26.70 9.06 P4
110 DL+LL+EQP+BT+SLX -0.056 39.326 -7.562 -26.732 0 1.189 60.50 6.61 24.43 23.64 5.82
111 DL+LL+EQP+BT+SLZ 0.033 19.016 -6.191 -23.579 0 0.984 40.19 2.51 18.23 17.58 1.86
112 DL+LL+EQP+BT-SLX 0.066 28.68 -7.012 -25.467 0 0.908 49.85 4.28 21.25 20.65 3.67
113 DL+LL+EQP+BT-SLZ -0.023 48.99 -8.383 -28.621 0 1.113 70.16 8.37 27.45 26.71 7.63 P1
115 DL+EQP+BT+WL+XPR -0.183 20.117 -1.767 -13.404 0 1.481 41.29 6.35 15.28 14.30 5.36
116 DL+EQP+BT+WL+XSUC -1.009 20.476 -1.597 -13.013 0 3.38 41.65 7.20 15.88 13.62 4.95 Z
117 DL+EQP+BT+WL-XPR 0.509 18.986 -1.606 -13.033 0 -0.111 40.16 5.66 14.35 14.42 5.73 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC -0.316 19.481 -1.432 -12.633 0 1.787 40.65 6.55 14.97 13.78 5.36 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR -0.989 3.456 -2.36 -14.768 0 3.334 24.63 2.35 12.19 9.97 0.12 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC -0.166 -32.044 -2.471 -15.023 0 1.442 -10.87 -7.25 2.77 1.81 -8.21 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR -0.991 39.541 -1.406 -12.573 0 3.339 60.71 12.10 20.48 18.26 9.87 PMAX = 27.70 Tons PMIN = -9.89 Tons
122 DL+EQP+BT+WL-ZSUC -0.162 41.171 -1.628 -13.084 0 1.432 62.34 11.70 20.42 19.47 10.75
123 DL+EQP+BT+SLX -0.062 28.248 -1.75 -13.365 0 1.202 49.42 8.30 17.21 16.41 7.50 PILE LENGTH = 22 M
124 DL+EQP+BT+SLZ 0.027 7.938 -0.379 -10.211 0 0.998 29.11 4.21 11.01 10.35 3.54 PILE CAPACITY = 28 Tons / 35 Tons ( compression )
125 DL+EQP+BT-SLX 0.06 17.602 -1.2 -12.1 0 0.922 38.77 5.97 14.03 13.42 5.35 (normal / wind-seismic) 27 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -0.029 37.912 -2.571 -15.253 0 1.126 59.08 10.06 20.23 19.48 9.31
A-7 192 101 DL+LL+EQP+BT*1.25 -0.246 104.443 17.284 49.092 0 5.476 125.61 49.59 16.86 13.21 45.94
102 DL+LL+EQP+BT+WL+XPR -0.524 93.722 17.58 49.774 0 6.115 P3
114.89 47.35 14.17 10.09 43.28
103 DL+LL+EQP+BT+WL+XSUC -1.741 94.846 15.436 44.842 0 8.914 116.02 46.92 17.03 11.09 40.98
104 DL+LL+EQP+BT+WL-XPR 0.597 99.41 18.126 51.029 0 3.537 120.58 48.33 14.31 11.96 45.98 X
105 DL+LL+EQP+BT+WL-XSUC -0.622 100.242 15.965 46.059 0 6.34 121.41 47.82 17.11 12.89 43.59 P2
106 DL+LL+EQP+BT+WL+ZPR -1.681 111.036 8.165 28.119 0 8.776 132.21 45.35 26.60 20.75 39.50
107 DL+LL+EQP+BT+WL+ZSUC -0.467 100.791 10.046 32.445 0 5.984 121.96 43.30 21.67 17.68 39.31
108 DL+LL+EQP+BT+WL-ZPR -1.644 80.334 24.79 66.357 0 8.691 101.50 50.39 6.15 0.36 44.60 P4
109 DL+LL+EQP+BT+WL-ZSUC -0.433 80.244 27.125 71.727 0 5.906 101.41 51.23 3.41 -0.52 47.29
110 DL+LL+EQP+BT+SLX -0.522 97.604 18.734 52.428 0 6.11 118.77 49.21 14.25 10.18 45.13
111 DL+LL+EQP+BT+SLZ -0.143 117.612 9.732 31.723 0 5.239 138.78 47.02 25.87 22.37 43.52
112 DL+LL+EQP+BT-SLX 0.106 114.052 14.172 41.935 0 4.666 135.22 49.34 21.38 18.27 46.23
P1
113 DL+LL+EQP+BT-SLZ -0.273 94.044 23.174 62.64 0 5.538 115.21 51.53 9.77 6.08 47.84
115 DL+EQP+BT+WL+XPR -0.556 53.073 9.627 31.482 0 6.189 74.24 31.12 10.13 6.00 26.99 Z
116 DL+EQP+BT+WL+XSUC -1.773 54.197 7.483 26.551 0 8.988 75.37 30.69 12.99 7.00 24.70
117 DL+EQP+BT+WL-XPR 0.565 58.761 10.173 32.738 0 3.61 79.93 32.10 10.27 7.87 29.69 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC -0.654 59.593 8.012 27.767 0 6.414 80.76 31.58 13.07 8.80 27.31 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR -1.713 70.387 0.212 9.827 0 8.85 91.56 29.11 22.56 16.66 23.21 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC -0.499 60.142 2.093 14.154 0 6.058 81.31 27.07 17.63 13.59 23.03 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR -1.676 39.685 16.837 48.065 0 8.765 60.86 34.16 2.11 -3.73 28.31 PMAX = 51.53 Tons PMIN = -4.61 Tons
122 DL+EQP+BT+WL-ZSUC -0.465 39.595 19.172 53.435 0 5.979 60.77 35.00 -0.63 -4.61 31.01
123 DL+EQP+BT+SLX -0.554 56.955 10.781 34.136 0 6.184 78.13 32.97 10.21 6.09 28.85 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ -0.175 76.963 1.779 13.431 0 5.312 98.13 30.78 21.83 18.29 27.24 PILE CAPACITY = 48 Tons / 60 Tons ( compression )
125 DL+EQP+BT-SLX 0.074 73.403 6.219 23.643 0 4.74 94.57 33.10 17.34 14.18 29.94 (normal / wind-seismic) 38 Tons / 47.5 Tons ( tension )
126 DL+EQP+BT-SLZ -0.305 53.395 15.221 44.348 0 5.611 74.57 35.29 5.73 1.99 31.55
B-7 11 101 DL+LL+EQP+BT*1.25 -0.021 102.108 -8.267 -28.353 0 12.256 124.60 27.83 43.45 18.85 34.46
102 DL+LL+EQP+BT+WL+XPR -0.397 92.759 -11.299 -35.123 1.827 13.199 115.25 23.98 43.33 14.30 33.65
103 DL+LL+EQP+BT+WL+XSUC -1.676 97.867 -9.04 -30.132 0 16.174 120.36 27.72 44.32 15.86 32.46
104 DL+LL+EQP+BT+WL-XPR 0.838 93.476 -10.767 -33.899 1.827 10.368 115.97 23.46 42.13 15.85 34.53
105 DL+LL+EQP+BT+WL-XSUC -0.445 98.274 -8.525 -28.947 0 13.352 120.76 27.11 43.06 17.32 33.27
106 DL+LL+EQP+BT+WL+ZPR -1.544 75.932 -15.048 -43.908 0.364 15.89 98.42 18.34 42.53 6.69 30.87
107 DL+LL+EQP+BT+WL+ZSUC -0.284 33.365 -17.543 -49.442 2.189 13.088 55.86 5.14 32.38 -4.45 22.78
108 DL+LL+EQP+BT+WL-ZPR -1.567 104.645 2.477 -3.808 -1.459 15.82 127.13 36.54 38.63 24.93 27.03
109 DL+LL+EQP+BT+WL-ZSUC -0.268 109.299 -0.636 -10.763 0.362 12.848 131.79 34.69 40.62 25.27 31.20
110 DL+LL+EQP+BT+SLX -0.451 96.784 -5.739 -22.539 0 13.447 119.27 28.54 40.96 18.68 31.10
111 DL+LL+EQP+BT+SLZ 0.156 90.927 -14.737 -43.235 0 12.004 113.42 20.85 44.66 12.04 35.86
112 DL+LL+EQP+BT-SLX 0.393 108.797 -10.305 -33.041 0 11.557 131.29 27.96 46.16 19.48 37.68
113 DL+LL+EQP+BT-SLZ -0.214 114.655 -1.307 -12.346 0 13 137.14 35.65 42.45 26.12 32.92
115 DL+EQP+BT+WL+XPR -0.435 46.9 -5.454 -21.679 1.827 10.582 69.39 15.26 27.20 7.50 19.44
116 DL+EQP+BT+WL+XSUC -1.714 52.008 -3.195 -16.688 0 13.558 74.50 19.00 28.19 9.06 18.25
117 DL+EQP+BT+WL-XPR 0.8 47.617 -4.922 -20.456 1.827 7.751 70.11 14.73 26.00 9.05 20.32 S/W of pile cap = 2.4*2.55*1.2*2.5 = 18.36 tons
118 DL+EQP+BT+WL-XSUC -0.483 52.415 -2.68 -15.504 0 10.735 74.91 18.39 26.93 10.52 19.06 soil wt = 2.4*2.55*0.375*1.8 = 4.13 tons
119 DL+EQP+BT+WL+ZPR -1.582 30.073 -9.203 -30.465 0.364 13.273 52.56 9.62 26.40 -0.12 16.67 Moment of inertia about x-x = 2x0.825^2+2x0.825^2 = 2.723 m2
120 DL+EQP+BT+WL+ZSUC -0.322 -12.494 -11.698 -35.998 2.189 10.471 10.00 -3.58 16.25 -11.26 8.57 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR -1.605 58.786 8.322 9.636 -1.459 13.203 81.28 27.81 22.51 18.13 12.82 PMAX = 46.16 Tons PMIN = -11.26 Tons
122 DL+EQP+BT+WL-ZSUC -0.306 63.441 5.209 2.681 0.362 10.231 85.93 25.97 24.50 18.47 16.99
123 DL+EQP+BT+SLX -0.489 50.926 0.106 -9.096 0 10.83 73.42 19.82 24.83 11.88 16.89 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 0.118 45.068 -8.892 -29.791 0 9.387 67.56 12.13 28.54 5.24 21.65 PILE CAPACITY = 43 Tons / ### ( compression )
125 DL+EQP+BT-SLX 0.355 62.938 -4.46 -19.598 0 8.94 85.43 19.24 30.03 12.68 23.48 (normal / wind-seismic) 31 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -0.252 68.796 4.538 1.098 0 10.383 91.29 26.93 26.33 19.32 18.71
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
B'-5 124 101 DL+LL+EQP+BT*1.25 0.864 60.952 0.753 4.966 1.161 22.292 84.76 29.04 25.73 16.65 13.34
102 DL+LL+EQP+BT+WL+XPR -1.169 58.033 -4.701 -8.958 0.371 24.261 81.84 24.21 30.19 10.74 16.71
103 DL+LL+EQP+BT+WL+XSUC -0.738 54.847 0.997 4.889 0.936 28.668 78.66 29.26 26.00 13.33 10.07
104 DL+LL+EQP+BT+WL-XPR 1.252 58.775 -4.7 -9.062 0.371 12.214 82.59 21.02 27.06 14.23 20.27
105 DL+LL+EQP+BT+WL-XSUC 2.173 55.674 0.998 4.762 0.936 14.161 79.48 25.39 22.22 17.52 14.35
106 DL+LL+EQP+BT+WL+ZPR 1.122 54.35 -0.04 2.332 0.825 22.119 78.16 26.46 24.91 14.17 12.62
107 DL+LL+EQP+BT+WL+ZSUC -0.306 61.04 -5.738 -11.457 0.26 21.119 84.85 23.26 30.90 11.53 19.17
108 DL+LL+EQP+BT+WL-ZPR 1.259 59.452 5.541 15.868 1.389 20.964 83.26 31.93 21.35 20.28 9.70
109 DL+LL+EQP+BT+WL-ZSUC 0.399 56.652 1.089 5.167 1.048 21.015 80.46 27.68 24.23 16.00 12.56
110 DL+LL+EQP+BT+SLX -2.016 60.319 1.054 5.153 0.936 35.672 84.13 32.66 29.22 12.84 9.41
111 DL+LL+EQP+BT+SLZ 2.564 56.491 1.092 5.048 0.936 18.2 80.30 26.81 23.45 16.70 13.34
112 DL+LL+EQP+BT-SLX 3.496 61.553 0.996 4.789 0.936 8.922 85.36 25.42 22.22 20.46 17.27
113 DL+LL+EQP+BT-SLZ -1.084 65.381 0.958 4.893 0.936 26.394 89.19 31.26 28.00 16.60 13.34
115 DL+EQP+BT+WL+XPR -1.035 40.052 -6.454 -13.209 0.371 23.009 63.86 17.95 26.76 5.17 13.98 S/W of pile cap = 2.4*2.7*1.2*2.5 = 19.44 tons
116 DL+EQP+BT+WL+XSUC -0.604 36.867 -0.756 0.638 0.936 27.415 60.68 23.00 22.57 7.77 7.34 soil wt = 2.4*2.7*0.375*1.8 = 4.37 tons
117 DL+EQP+BT+WL-XPR 1.385 40.794 -6.453 -13.313 0.371 10.962 64.60 14.76 23.63 8.67 17.54 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
118 DL+EQP+BT+WL-XSUC 2.306 37.693 -0.755 0.511 0.936 12.909 61.50 19.13 18.79 11.96 11.62 Moment of inertia about z-z = 2x0.9^2 +2x0.9^2 = 3.24 m2
119 DL+EQP+BT+WL+ZPR 1.255 36.369 -1.793 -1.919 0.825 20.867 60.18 20.20 21.48 8.61 9.89 PMAX = 30.90 Tons PMIN = 5.17 Tons
120 DL+EQP+BT+WL+ZSUC -0.173 43.059 -7.491 -15.708 0.26 19.866 66.87 17.00 27.47 5.96 16.43
121 DL+EQP+BT+WL-ZPR 1.392 41.472 3.787 11.617 1.389 19.712 65.28 25.67 17.92 14.72 6.97 PILE LENGTH = 25 M
122 DL+EQP+BT+WL-ZSUC 0.533 38.672 -0.664 0.916 1.048 19.762 62.48 21.42 20.80 10.44 9.83 PILE CAPACITY = 36 Tons / 45 Tons ( compr )
123 DL+EQP+BT+SLX -1.882 42.338 -0.699 0.902 0.936 34.42 66.15 26.40 25.80 7.28 6.68 (normal / wind-seismic) 27 Tons / 33.75 Tons ( tension )
124 DL+EQP+BT+SLZ 2.698 38.51 -0.661 0.797 0.936 16.948 62.32 20.55 20.02 11.14 10.61
125 DL+EQP+BT-SLX 3.629 43.573 -0.757 0.538 0.936 7.67 67.38 19.16 18.80 14.89 14.54
126 DL+EQP+BT-SLZ -0.951 47.4 -0.795 0.642 0.936 25.142 71.21 25.00 24.57 11.03 10.60
B-1 147 101 DL+LL+EQP+BT*1.25 -0.002 30.307 -0.065 0 0 0 33.287 33.29
102 DL+LL+EQP+BT+WL+XPR 0.009 18.352 -1.492 0 0 0 21.332 21.33
103 DL+LL+EQP+BT+WL+XSUC 0 19.849 -0.069 0 0 0 22.829 22.83
104 DL+LL+EQP+BT+WL-XPR -0.007 18.224 -1.463 0 0 0 21.204 21.20
105 DL+LL+EQP+BT+WL-XSUC -0.016 20.21 -0.047 0 0 0 23.19 23.19
106 DL+LL+EQP+BT+WL+ZPR -0.012 20.067 0.128 0 0 0 23.047 23.05
107 DL+LL+EQP+BT+WL+ZSUC -0.003 28.809 -1.31 0 0 0 31.789 31.79
108 DL+LL+EQP+BT+WL-ZPR -0.011 22.243 0.569 0 0 0 25.223 25.22
109 DL+LL+EQP+BT+WL-ZSUC -0.002 20.321 -0.867 0 0 0 23.301 23.30
110 DL+LL+EQP+BT+SLX 0.01 31.428 0.086 0 0 0 34.408 34.41
111 DL+LL+EQP+BT+SLZ -0.006 28.719 0.303 0 0 0 31.699 31.70
112 DL+LL+EQP+BT-SLX -0.012 29.196 -0.202 0 0 0 32.176 32.18
113 DL+LL+EQP+BT-SLZ 0.004 31.905 -0.419 0 0 0 34.885 34.89
115 DL+EQP+BT+WL+XPR 0.009 10.062 -1.476 0 0 0 13.042 13.04 S/W of pile cap = 0.9 * 0.9 * 1.2*2.5 = 2.43 tons
116 DL+EQP+BT+WL+XSUC 0 11.559 -0.053 0 0 0 14.539 14.54 soil wt = 0.9*0.9*0.375*1.8 = 0.55 tons
117 DL+EQP+BT+WL-XPR -0.007 9.934 -1.447 0 0 0 12.914 12.91
118 DL+EQP+BT+WL-XSUC -0.016 11.92 -0.031 0 0 0 14.9 14.90
119 DL+EQP+BT+WL+ZPR -0.012 11.777 0.144 0 0 0 14.757 14.76 PMAX = 34.89 Tons
120 DL+EQP+BT+WL+ZSUC -0.003 20.519 -1.294 0 0 0 23.499 23.50 PMIN = 12.91 Tons
121 DL+EQP+BT+WL-ZPR -0.011 13.953 0.585 0 0 0 16.933 16.93 PILE LENGTH = 25 M
122 DL+EQP+BT+WL-ZSUC -0.002 12.031 -0.851 0 0 0 15.011 15.01 PILE CAPACITY = 36 Tons / 45 Tons ( compr )
123 DL+EQP+BT+SLX 0.01 23.138 0.102 0 0 0 26.118 26.12 (normal / wind-seismic) 27 Tons / 33.75 Tons ( tension )
124 DL+EQP+BT+SLZ -0.006 20.429 0.319 0 0 0 23.409 23.41
125 DL+EQP+BT-SLX -0.012 20.906 -0.186 0 0 0 23.886 23.89
126 DL+EQP+BT-SLZ 0.004 23.615 -0.403 0 0 0 26.595 26.60
B-1' 198 101 DL+LL+EQP+BT*1.25 0 17.649 -0.067 0 0 0 20.629 20.63
102 DL+LL+EQP+BT+WL+XPR 0.372 10.272 -0.944 0 0 0 13.252 13.25
103 DL+LL+EQP+BT+WL+XSUC 0.248 11.325 -0.077 0 0 0 14.305 14.31
104 DL+LL+EQP+BT+WL-XPR 0.124 10.368 -0.945 0 0 0 13.348 13.35
105 DL+LL+EQP+BT+WL-XSUC 0.746 11.102 -0.078 0 0 0 14.082 14.08
106 DL+LL+EQP+BT+WL+ZPR 0.747 10.922 -0.272 0 0 0 13.902 13.90
107 DL+LL+EQP+BT+WL+ZSUC 0.125 16.197 -1.141 0 0 0 19.177 19.18
108 DL+LL+EQP+BT+WL-ZPR 0.746 12.079 0.646 0 0 0 15.059 15.06
109 DL+LL+EQP+BT+WL-ZSUC 0.124 11.249 -0.221 0 0 0 14.229 14.23
110 DL+LL+EQP+BT+SLX -0.002 17.664 -0.063 0 0 0 20.644 20.64
111 DL+LL+EQP+BT+SLZ 0 17.717 -0.029 0 0 0 20.697 20.70
112 DL+LL+EQP+BT-SLX 0.002 17.615 -0.087 0 0 0 20.595 20.60 S/W of pile cap = 0.9 * 0.9 * 1.2*2.5 = 2.43 tons
113 DL+LL+EQP+BT-SLZ 0 17.562 -0.121 0 0 0 20.542 20.54 soil wt = 0.9*0.9*0.375*1.8 = 0.55 tons
115 DL+EQP+BT+WL+XPR 0.372 6.964 -0.921 0 0 0 9.944 9.94
116 DL+EQP+BT+WL+XSUC 0.248 8.017 -0.054 0 0 0 10.997 11.00
117 DL+EQP+BT+WL-XPR 0.124 7.06 -0.922 0 0 0 10.04 10.04
118 DL+EQP+BT+WL-XSUC 0.746 7.795 -0.055 0 0 0 10.775 10.78
119 DL+EQP+BT+WL+ZPR 0.747 7.614 -0.249 0 0 0 10.594 10.59 PMAX = 20.70 Tons
120 DL+EQP+BT+WL+ZSUC 0.125 12.89 -1.118 0 0 0 15.87 15.87 PMIN = 9.94 Tons
121 DL+EQP+BT+WL-ZPR 0.746 8.771 0.669 0 0 0 11.751 11.75 PILE LENGTH = 22 M
122 DL+EQP+BT+WL-ZSUC 0.124 7.941 -0.198 0 0 0 10.921 10.92 PILE CAPACITY = 28 Tons / 35 Tons ( compr )
123 DL+EQP+BT+SLX -0.002 14.356 -0.04 0 0 0 17.336 17.34 (normal / wind-seismic) 20 Tons / 25 Tons ( tension )
124 DL+EQP+BT+SLZ 0 14.409 -0.006 0 0 0 17.389 17.39
125 DL+EQP+BT-SLX 0.002 14.307 -0.064 0 0 0 17.287 17.29
126 DL+EQP+BT-SLZ 0 14.254 -0.098 0 0 0 17.234 17.23
A-6 189 101 DL+LL+EQP+BT*1.25 -0.163 167.598 2.817 41.668 -1.664 1.473 202.00 43.16 42.91 42.67 24.67 24.42 24.17
102 DL+LL+EQP+BT+WL+XPR -0.547 152.109 8.489 52.507 -1.338 1.956 186.51 43.06 42.74 42.41 19.76 19.43 19.11
103 DL+LL+EQP+BT+WL+XSUC -0.862 152.934 4.094 42.167 -1.309 2.664 187.33 41.02 40.58 40.13 22.31 21.87 21.42
104 DL+LL+EQP+BT+WL-XPR 0.25 153.285 8.101 51.614 -1.338 0.123 187.69 42.75 42.73 42.71 19.85 19.83 19.81
105 DL+LL+EQP+BT+WL-XSUC -0.074 154.119 3.705 41.272 -1.309 0.851 188.52 40.72 40.58 40.44 22.40 22.26 22.12
106 DL+LL+EQP+BT+WL+ZPR -0.63 158.269 -0.779 31.004 -1.315 2.136 192.67 39.35 38.99 38.64 25.59 25.23 24.88
107 DL+LL+EQP+BT+WL+ZSUC -0.336 166.86 3.544 41.178 -1.344 1.477 201.26 42.93 42.68 42.43 24.65 24.41 24.16
108 DL+LL+EQP+BT+WL-ZPR -0.579 151.374 6.741 48.068 -1.285 2.002 185.77 41.96 41.63 41.29 20.63 20.30 19.96
109 DL+LL+EQP+BT+WL-ZSUC -0.214 151.027 11.155 58.36 -1.303 1.171 185.43 44.05 43.85 43.66 18.15 17.95 17.76
110 DL+LL+EQP+BT+SLX -1.35 164.914 4.077 42.129 -1.309 3.788 199.31 43.20 42.57 41.94 24.50 23.87 23.24
111 DL+LL+EQP+BT+SLZ 0.006 169.448 1.975 37.293 -1.309 0.668 203.85 42.36 42.25 42.14 25.81 25.70 25.59
112 DL+LL+EQP+BT-SLX 0.904 168.829 3.229 40.177 -1.309 -1.398 203.23 42.55 42.79 43.02 24.72 24.96 25.19
113 DL+LL+EQP+BT-SLZ -0.452 164.296 5.331 45.013 -1.309 1.722 198.70 43.39 43.10 42.82 23.41 23.13 22.84
115 DL+EQP+BT+WL+XPR -0.467 103.818 6.7 48.391 -1.338 1.771 138.22 34.07 33.77 33.48 12.59 12.30 12.00
116 DL+EQP+BT+WL+XSUC -0.782 104.642 2.305 38.051 -1.309 2.479 139.04 32.03 31.62 31.20 15.14 14.73 14.32
117 DL+EQP+BT+WL-XPR 0.33 104.993 6.312 47.497 -1.338 -0.063 139.39 33.76 33.77 33.78 12.68 12.69 12.70 S/W of pile cap = = 3.9*2.4*1.2*2.5 = 28.08 tons
118 DL+EQP+BT+WL-XSUC 0.006 105.828 1.916 37.155 -1.309 0.666 140.23 31.73 31.62 31.50 15.24 15.13 15.02 soil wt = 3.9*2.4*0.375*1.8 = 6.32 tons
119 DL+EQP+BT+WL+ZPR -0.55 109.977 -2.568 26.887 -1.315 1.95 144.38 30.35 30.03 29.70 18.42 18.10 17.77 Moment of inertia about x-x = 3x0.75^2+3x0.75^2 = 3.38 m2
120 DL+EQP+BT+WL+ZSUC -0.256 118.568 1.755 37.062 -1.344 1.291 152.97 33.93 33.72 33.50 17.49 17.27 17.06 Moment of inertia about z-z = 2x1.5^2 +2x1.5^2 = 9 m2
121 DL+EQP+BT+WL-ZPR -0.499 103.083 4.952 43.951 -1.285 1.816 137.48 32.97 32.67 32.36 13.46 13.16 12.86 PMAX = 44.05 Tons PMIN = 10.66 Tons
122 DL+EQP+BT+WL-ZSUC -0.134 102.735 9.366 54.244 -1.303 0.985 137.14 35.06 34.89 34.73 10.98 10.82 10.66
123 DL+EQP+BT+SLX -1.27 116.623 2.289 38.013 -1.309 3.602 151.02 34.21 33.61 33.01 17.34 16.74 16.14 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 0.086 121.156 0.186 33.177 -1.309 0.482 155.56 33.37 33.29 33.21 18.64 18.56 18.48 PILE CAPACITY = 43 Tons / 53.75 Tons ( compression )
125 DL+EQP+BT-SLX 0.984 120.538 1.44 36.06 -1.309 -1.584 154.94 33.56 33.82 34.09 17.56 17.82 18.09 (normal / wind-seismic) 31 Tons / 38.75 Tons ( tension )
126 DL+EQP+BT-SLZ -0.372 116.004 3.542 40.897 -1.309 1.537 150.40 34.40 34.14 33.89 16.25 15.99 15.74
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
B-6 40 101 DL+LL+EQP+BT*1.25 0.718 247.422 -2.936 -36.981 2.31 25.984 303.32 40.05 46.22 52.38 34.28 40.44 46.61 43.33
102 DL+LL+EQP+BT+WL+XPR 0.666 213.796 -7.953 -45.469 1.927 28.328 234.33 29.05 36.62 44.20 22.75 30.33 37.91 33.48
103 DL+LL+EQP+BT+WL+XSUC -1.946 213.803 -4.137 -38.383 1.845 32.087 237.57 31.11 37.50 43.90 23.98 30.37 36.77 33.94
104 DL+LL+EQP+BT+WL-XPR 2.752 215.933 -5.736 -40.275 1.927 23.522 235.20 29.50 36.21 42.93 24.27 30.99 37.70 33.60
105 DL+LL+EQP+BT+WL-XSUC 0.122 216.509 -2.956 -35.552 1.845 27.324 226.78 29.51 35.43 41.36 23.44 29.36 35.29 32.40
106 DL+LL+EQP+BT+WL+ZPR -1.268 292.87 -24.445 -84.732 1.863 30.963 303.14 32.62 46.75 60.87 25.74 39.86 53.99 43.31
107 DL+LL+EQP+BT+WL+ZSUC 1.27 227.004 -29.587 -94.917 1.946 27.291 267.27 25.39 41.21 57.03 19.33 35.15 50.97 38.18
108 DL+LL+EQP+BT+WL-ZPR -2.317 140.217 27.182 32.354 1.777 31.224 198.48 37.22 31.82 26.43 30.28 24.89 19.49 28.35
109 DL+LL+EQP+BT+WL-ZSUC -0.021 132.705 25.284 28.937 1.371 27.27 173.97 32.71 27.88 23.06 26.65 21.82 17.00 24.85
110 DL+LL+EQP+BT+SLX -1.064 268.538 4.51 -18.612 1.845 30.003 278.80 40.06 43.16 46.26 33.39 36.50 39.60 39.83
111 DL+LL+EQP+BT+SLZ 1.101 306.066 -22.643 -80.895 1.845 25.051 316.33 34.49 47.97 61.46 28.92 42.41 55.89 45.19
112 DL+LL+EQP+BT-SLX 1.94 225.727 -9.45 -50.516 1.845 23.059 235.99 27.86 36.28 44.69 22.73 31.15 39.57 33.71
113 DL+LL+EQP+BT-SLZ -0.225 188.199 17.703 11.766 1.845 28.01 198.47 33.43 31.46 29.50 27.20 25.24 23.28 28.35
115 DL+EQP+BT+WL+XPR 0.824 126.405 -9.081 -47.869 1.927 29.68 136.67 14.84 22.82 30.80 8.25 16.23 24.20 19.52
116 DL+EQP+BT+WL+XSUC -1.788 126.412 -5.265 -40.784 1.845 33.439 136.68 16.44 23.24 30.04 9.01 15.81 22.61 19.53
117 DL+EQP+BT+WL-XPR 2.91 128.542 -6.864 -42.676 1.927 24.875 138.81 15.48 22.59 29.71 9.95 17.07 24.18 19.83 total wt 45.63 tons
118 DL+EQP+BT+WL-XSUC 0.28 129.117 -4.084 -37.953 1.845 28.676 139.38 16.77 23.10 29.42 10.40 16.73 23.05 19.91 soil wt 10.27 tons
119 DL+EQP+BT+WL+ZPR -1.11 205.479 -25.573 -87.133 1.863 32.315 215.75 19.89 34.41 48.93 12.71 27.23 41.75 30.82 Iz = 13.50 m4
120 DL+EQP+BT+WL+ZSUC 1.428 139.613 -30.715 -97.318 1.946 28.643 149.88 8.37 24.59 40.81 2.01 18.23 34.45 21.41 Ix = 9 m4
121 DL+EQP+BT+WL-ZPR -2.159 52.826 26.054 29.953 1.777 32.576 63.09 17.62 12.63 7.64 10.39 5.39 0.40 9.01 PMAX = 61.46 Tons
122 DL+EQP+BT+WL-ZSUC 0.137 45.314 24.156 26.536 1.371 28.622 55.58 15.54 11.12 6.70 9.18 4.76 0.34 7.94 PMIN = 0.34 Tons
123 DL+EQP+BT+SLX -0.906 181.147 3.382 -21.013 1.845 31.355 191.41 27.33 30.83 34.33 20.36 23.86 27.36 27.34 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ 1.259 218.675 -23.771 -83.295 1.845 26.403 228.94 21.76 35.64 49.52 15.89 29.77 43.65 32.71 PILE CAPACITY = 48 Tons / 60 Tons ( compr )
125 DL+EQP+BT-SLX 2.098 138.336 -10.578 -52.917 1.845 24.411 148.60 15.12 23.94 32.76 9.70 18.52 27.34 21.23 (normal / wind-seismic) 31 Tons / 38.75 Tons ( tension )
126 DL+EQP+BT-SLZ -0.067 100.807 16.575 9.365 1.845 29.363 111.07 20.69 19.13 17.57 14.17 12.61 11.04 15.87
A-4 174 101 DL+LL+EQP+BT*1.25 0.87 108.509 5.612 37.63 -1.177 -1.731 142.25 36.87 19.22 20.03 37.68 28.45
102 DL+LL+EQP+BT+WL+XPR -5.458 83.556 10.508 48.303 -0.952 12.609 117.30 37.75 15.09 9.17 31.83 23.46
103 DL+LL+EQP+BT+WL+XSUC -6.975 80.998 5.364 36.476 -0.916 16.057 114.74 35.27 18.16 10.62 27.74 22.95
104 DL+LL+EQP+BT+WL-XPR 5.846 115.487 10.51 48.307 -0.952 -13.39 149.23 38.04 15.37 21.65 44.32 29.85
105 DL+LL+EQP+BT+WL-XSUC 4.131 112.242 5.369 36.487 -0.916 -9.487 145.98 35.53 18.41 22.86 39.98 29.20
106 DL+LL+EQP+BT+WL+ZPR -2.29 114.768 0.628 25.583 -0.923 5.29 148.51 36.94 24.94 22.46 34.46 29.70
107 DL+LL+EQP+BT+WL+ZSUC -1.492 107.234 5.774 37.414 -0.959 3.494 140.97 37.79 20.24 18.60 36.15 28.19
108 DL+LL+EQP+BT+WL-ZPR -1.632 91.981 7.602 41.627 -0.887 3.735 125.72 35.79 16.26 14.50 34.03 25.14
109 DL+LL+EQP+BT+WL-ZSUC 0.514 86.647 12.788 53.553 -0.909 -1.175 120.39 36.36 11.24 11.79 36.92 24.08
110 DL+LL+EQP+BT+SLX -17.022 61.444 5.398 36.554 -0.916 39.165 95.18 36.80 19.65 1.27 18.42 19.04
111 DL+LL+EQP+BT+SLZ 2.986 104.168 4.275 33.971 -0.916 -6.854 137.91 33.94 18.00 21.22 37.16 27.58
112 DL+LL+EQP+BT-SLX 16.332 158.474 5.648 37.129 -0.916 -37.55 192.21 38.34 20.92 38.54 55.96 38.44
113 DL+LL+EQP+BT-SLZ -3.676 115.75 6.771 39.712 -0.916 8.469 149.49 41.20 22.57 18.60 37.23 29.90
115 DL+EQP+BT+WL+XPR -5.179 49.258 8.304 43.233 -0.952 11.967 83.00 29.55 9.27 3.65 23.93 16.60
116 DL+EQP+BT+WL+XSUC -6.696 46.699 3.16 31.406 -0.916 15.415 80.44 27.07 12.34 5.10 19.84 16.09
117 DL+EQP+BT+WL-XPR 6.125 81.188 8.306 43.238 -0.952 -14.032 114.93 29.84 9.55 16.13 36.42 22.99 S/W of pile cap = = 3.03*3.03*1.2*2.5 = 27.54 tons
118 DL+EQP+BT+WL-XSUC 4.41 77.943 3.165 31.418 -0.916 -10.129 111.68 27.33 12.59 17.34 32.08 22.34 soil wt = 3.03*3.03*0.375*1.8 = 6.2 tons
119 DL+EQP+BT+WL+ZPR -2.011 80.469 -1.576 20.513 -0.923 4.649 114.21 28.74 19.12 16.94 26.56 22.84 Moment of inertia about x-x = 2x1.065^2+2x1.065^2 = 4.54 m2
120 DL+EQP+BT+WL+ZSUC -1.213 72.936 3.57 32.345 -0.959 2.852 106.68 29.59 14.42 13.08 28.25 21.34 Moment of inertia about z-z = 2x1.065^2 +2x1.065^2 = 4.54 m2
121 DL+EQP+BT+WL-ZPR -1.353 57.682 5.398 36.558 -0.887 3.094 91.42 27.59 10.43 8.98 26.13 18.28 PMAX = 55.96 Tons PMIN = -4.25 Tons
122 DL+EQP+BT+WL-ZSUC 0.793 52.348 10.584 48.484 -0.909 -1.817 86.09 28.16 5.42 6.27 29.02 17.22
123 DL+EQP+BT+SLX -16.743 27.145 3.194 31.485 -0.916 38.523 60.89 28.60 13.83 -4.25 10.53 12.18 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ 3.265 69.869 2.071 28.901 -0.916 -7.495 103.61 25.74 12.18 15.70 29.26 20.72 PILE CAPACITY = 48 Tons / 60 Tons ( compression )
125 DL+EQP+BT-SLX 16.611 124.175 3.444 32.059 -0.916 -38.191 157.92 30.14 15.10 33.02 48.06 31.58 (normal / wind-seismic) 38 Tons / 47.5 Tons ( tension )
126 DL+EQP+BT-SLZ -3.397 81.451 4.567 34.642 -0.916 7.827 115.19 33.00 16.75 13.08 29.33 23.04
B-4 138 101 DL+LL+EQP+BT*1.25 9.949 196.911 -16.125 -39.579 0.144 -35.351 244.54 20.72 23.36 25.99 28.63 32.50 35.14 37.78 40.42
102 DL+LL+EQP+BT+WL+XPR 3.013 159.698 -15.344 -41.668 0.088 -23.999 207.33 18.84 20.53 23.30 26.08 25.75 28.53 31.30 34.08
103 DL+LL+EQP+BT+WL+XSUC 3.178 158.726 -14.237 -39.171 0.083 -24.561 206.35 18.68 20.40 23.01 25.62 25.97 28.58 31.19 33.8
104 DL+LL+EQP+BT+WL-XPR 12.013 188.81 -16.938 -45.328 0.088 -44.708 236.44 15.85 20.59 23.61 26.64 32.47 35.50 38.52 41.54
105 DL+LL+EQP+BT+WL-XSUC 12.54 187.346 -15.356 -41.737 0.083 -46.105 234.97 15.42 20.30 23.08 25.86 32.88 35.66 38.45 41.23
106 DL+LL+EQP+BT+WL+ZPR 10.042 250.708 -44.59 -108.971 0.084 -40.313 298.34 21.92 26.94 34.21 41.47 33.11 40.38 47.64 54.91
107 DL+LL+EQP+BT+WL+ZSUC 8.372 176.697 -45.94 -112.032 0.089 -36.286 224.33 12.48 18.26 25.73 33.20 22.89 30.35 37.82 45.29
108 DL+LL+EQP+BT+WL-ZPR 6.802 96.623 20.349 40.344 0.079 -33.048 144.25 12.28 13.87 11.18 8.49 27.57 24.88 22.19 19.5
109 DL+LL+EQP+BT+WL-ZSUC 6.599 88.909 20.125 39.858 0.082 -32.474 136.54 11.34 12.98 10.33 7.67 26.47 23.81 21.15 18.49
110 DL+LL+EQP+BT+SLX -3.596 155.799 -18.821 -49.723 0.083 -8.969 203.43 22.76 22.28 25.59 28.91 21.95 25.27 28.58 31.9
111 DL+LL+EQP+BT+SLZ 12.709 231.274 -27.481 -69.629 0.083 -46.488 278.90 19.71 24.79 29.44 34.08 35.65 40.29 44.93 49.57
112 DL+LL+EQP+BT-SLX 18.256 244.403 -10.213 -29.91 0.083 -59.249 292.03 19.98 25.63 27.63 29.62 43.39 45.38 47.38 49.37
113 DL+LL+EQP+BT-SLZ 1.951 168.927 -1.553 -10.004 0.083 -21.731 216.55 23.03 23.11 23.78 24.45 29.69 30.36 31.02 31.69
115 DL+EQP+BT+WL+XPR 2.861 73.984 -10.992 -31.645 0.088 -23.668 121.61 7.37 10.20 12.31 14.42 15.98 18.09 20.20 22.31
116 DL+EQP+BT+WL+XSUC 3.026 73.013 -9.885 -29.149 0.083 -24.231 120.64 7.21 10.07 12.01 13.96 16.20 18.15 20.09 22.03
117 DL+EQP+BT+WL-XPR 11.861 103.096 -12.586 -35.305 0.088 -44.378 150.72 4.39 10.27 12.62 14.97 22.71 25.06 27.41 29.77 total wt 38.88 tons
118 DL+EQP+BT+WL-XSUC 12.388 101.632 -11.004 -31.714 0.083 -45.775 149.26 3.95 9.97 12.09 14.20 23.12 25.23 27.34 29.46 soil wt 8.75 tons
119 DL+EQP+BT+WL+ZPR 9.89 164.994 -40.238 -98.948 0.084 -39.983 212.62 10.45 16.62 23.21 29.81 23.35 29.94 36.54 43.14 Iz = 4.50 m4
120 DL+EQP+BT+WL+ZSUC 8.22 90.983 -41.588 -102.009 0.089 -35.956 138.61 1.02 7.93 14.73 21.53 13.12 19.92 26.72 33.52 Ix = 22.5 m4
121 DL+EQP+BT+WL-ZPR 6.65 10.909 24.701 50.367 0.079 -32.717 58.54 0.81 3.54 0.19 -3.17 17.81 14.45 11.09 7.73 PMAX = 54.91 Tons
122 DL+EQP+BT+WL-ZSUC 6.447 3.195 24.477 49.88 0.082 -32.144 50.82 -0.13 2.66 -0.67 -3.99 16.70 13.37 10.05 6.72 PMIN = -3.99 Tons
123 DL+EQP+BT+SLX -3.748 70.085 -14.469 -39.7 0.083 -8.639 117.71 11.29 11.95 14.60 17.24 12.18 14.83 17.48 20.12 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ 12.557 145.56 -23.129 -59.606 0.083 -46.157 193.19 8.24 14.47 18.44 22.42 25.88 29.85 33.83 37.8 PILE CAP = 48 Tons / 60 Tons ( compr )
125 DL+EQP+BT-SLX 18.104 158.689 -5.861 -19.887 0.083 -58.919 206.32 8.51 15.31 16.63 17.96 33.62 34.95 36.27 37.6 38 Tons / 47.5 Tons ( tension )
126 DL+EQP+BT-SLZ 1.799 83.213 2.799 0.019 0.083 -21.401 130.84 11.56 12.79 12.79 12.79 19.92 19.92 19.92 19.92 (normal / wind-seismic)
A-1 171 101 DL+LL+EQP+BT*1.25 -0.114 88.703 4.306 16.72 0 0.857 109.87 33.33 22.18 21.61 32.76
102 DL+LL+EQP+BT+WL+XPR 0.033 76.355 6.345 21.409 0 0.519 97.53 31.69 17.42 17.07 31.34 P3
103 DL+LL+EQP+BT+WL+XSUC -0.012 71.804 4.477 17.113 0 0.623 92.97 29.16 17.75 17.33 28.74
104 DL+LL+EQP+BT+WL-XPR -0.234 81.931 5.759 20.061 0 1.133 103.10 32.84 19.47 18.71 32.08 X
105 DL+LL+EQP+BT+WL-XSUC -0.274 77.671 4.021 16.064 0 1.225 98.84 30.47 19.76 18.95 29.66 P2
106 DL+LL+EQP+BT+WL+ZPR -0.145 104.815 -7.878 -11.303 0 0.929 125.99 28.04 35.57 34.95 27.42
107 DL+LL+EQP+BT+WL+ZSUC -0.085 88.432 -5.721 -6.342 0 0.791 109.60 25.55 29.78 29.25 25.02
108 DL+LL+EQP+BT+WL-ZPR -0.102 54.081 15.927 43.447 0 0.83 75.25 33.57 4.61 4.05 33.02 P4
109 DL+LL+EQP+BT+WL-ZSUC -0.07 49.466 18.016 48.252 0 0.756 70.64 34.00 1.83 1.32 33.49
110 DL+LL+EQP+BT+SLX 0.26 72.31 1.421 10.084 0 -0.003 93.48 26.73 20.01 20.01 26.73
111 DL+LL+EQP+BT+SLZ -0.164 105.513 -2.967 -0.008 0 0.972 126.68 31.99 32.00 31.35 31.34
112 DL+LL+EQP+BT-SLX -0.432 104.554 6.871 22.619 0 1.589 125.72 39.50 24.42 23.36 38.44
113 DL+LL+EQP+BT-SLZ -0.008 71.351 11.259 32.711 0 0.613 P1
92.52 34.24 12.43 12.02 33.83
115 DL+EQP+BT+WL+XPR 0.071 36.027 3.889 15.76 0 0.432 57.20 19.70 9.19 8.90 19.41 Z
116 DL+EQP+BT+WL+XSUC 0.026 31.476 2.021 11.464 0 0.535 52.65 17.16 9.52 9.16 16.80
117 DL+EQP+BT+WL-XPR -0.196 41.603 3.303 14.413 0 1.046 62.77 20.85 11.24 10.54 20.15 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC -0.236 37.343 1.565 10.415 0 1.138 58.51 18.48 11.54 10.78 17.72 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR -0.107 64.487 -10.334 -16.952 0 0.841 85.66 16.04 27.35 26.78 15.48 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC -0.047 48.104 -8.177 -11.991 0 0.703 69.27 13.56 21.55 21.08 13.09 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR -0.064 13.753 13.471 37.799 0 0.742 34.92 21.58 -3.62 -4.12 21.08 PMAX = 39.50 Tons PMIN = -6.85 Tons
122 DL+EQP+BT+WL-ZSUC -0.032 9.138 15.56 42.603 0 0.669 30.31 22.00 -6.40 -6.85 21.56
123 DL+EQP+BT+SLX 0.298 31.982 -1.035 4.435 0 -0.09 53.15 14.74 11.78 11.84 14.80 PILE LENGTH = 25 M
124 DL+EQP+BT+SLZ -0.126 65.185 -5.423 -5.657 0 0.885 86.36 20.00 23.77 23.18 19.41 PILE CAPACITY = 36 Tons / 45 Tons ( compression )
125 DL+EQP+BT-SLX -0.394 64.226 4.415 16.97 0 1.501 85.40 27.51 16.19 15.19 26.51 (normal / wind-seismic) 27 Tons / ### ( tension )
126 DL+EQP+BT-SLZ 0.03 31.023 8.803 27.062 0 0.526 52.19 22.24 4.20 3.85 21.89
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
A'-1 156 101 DL+LL+EQP+BT*1.25 0.032 73.831 -1.448 -9.245 0 3.238 101.61 23.04 29.20 27.76 21.60
102 DL+LL+EQP+BT+WL+XPR -0.092 72.946 -1.211 -7.385 0 3.549 100.73 23.51 28.43 26.85 21.93
103 DL+LL+EQP+BT+WL+XSUC 0.094 72.101 -1.24 -8.761 0 3.113 99.88 22.74 28.58 27.20 21.36
104 DL+LL+EQP+BT+WL-XPR 0.071 74.443 -1.66 -8.444 0 3.158 102.22 23.44 29.07 27.67 22.04
105 DL+LL+EQP+BT+WL-XSUC 0.258 73.274 -1.592 -9.59 0 2.775 101.05 22.68 29.08 27.84 21.45
106 DL+LL+EQP+BT+WL+ZPR 0.225 49.212 -10.301 -29.762 0 2.851 76.99 9.96 29.80 28.54 8.69
107 DL+LL+EQP+BT+WL+ZSUC 0.038 74.567 -10.04 -27.839 0 3.234 102.35 17.03 35.59 34.15 15.59
108 DL+LL+EQP+BT+WL-ZPR 0.272 96.687 7.756 11.321 0 2.742 124.47 35.50 27.95 26.73 34.28
109 DL+LL+EQP+BT+WL-ZSUC 0.087 100.057 7.959 13.108 0 3.121 127.84 37.02 28.28 26.90 35.64
110 DL+LL+EQP+BT+SLX -0.123 79.319 -3.594 -14.313 0 3.593 107.10 22.80 32.34 30.75 21.21
111 DL+LL+EQP+BT+SLZ 0.065 56.568 -6.856 -22.009 0 3.163 84.35 14.45 29.13 27.72 13.05
112 DL+LL+EQP+BT-SLX 0.183 66.664 0.434 -4.793 0 2.893 94.44 22.66 25.85 24.57 21.37
113 DL+LL+EQP+BT-SLZ -0.005 89.415 3.696 2.902 0 3.322 117.20 31.00 29.07 27.59 29.53
115 DL+EQP+BT+WL+XPR -0.101 42.705 0.572 -3.3 0 3.57 70.48 17.31 19.51 17.93 15.73
116 DL+EQP+BT+WL+XSUC 0.085 41.86 0.543 -4.676 0 3.134 69.64 16.55 19.67 18.27 15.15
117 DL+EQP+BT+WL-XPR 0.062 44.202 0.123 -4.358 0 3.179 71.98 17.25 20.15 18.74 15.84 S/W of pile cap = = 2.4*3.15*1.2*2.5 = 22.68 tons
118 DL+EQP+BT+WL-XSUC 0.249 43.033 0.191 -5.505 0 2.796 70.81 16.49 20.16 18.92 15.25 soil wt = 2.4*3.15*0.375*1.8 = 5.1 tons
119 DL+EQP+BT+WL+ZPR 0.216 18.971 -8.518 -25.677 0 2.871 46.75 3.77 20.88 19.61 2.49 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC 0.029 44.326 -8.257 -23.754 0 3.254 72.11 10.83 26.67 25.22 9.39 Moment of inertia about z-z = 2x1.125^2 +2x1.125^2 = 5.063 m2
121 DL+EQP+BT+WL-ZPR 0.263 66.446 9.539 15.406 0 2.763 94.23 29.31 19.04 17.81 28.08 PMAX = 37.02 Tons PMIN = 2.49 Tons
122 DL+EQP+BT+WL-ZSUC 0.078 69.816 9.742 17.193 0 3.142 97.60 30.83 19.37 17.97 29.43
123 DL+EQP+BT+SLX -0.132 49.078 -1.811 -10.228 0 3.613 76.86 16.61 23.43 21.82 15.00 PILE LENGTH = 25 M
124 DL+EQP+BT+SLZ 0.056 26.327 -5.073 -17.923 0 3.184 54.11 8.26 20.21 18.79 6.84 PILE CAPACITY = 36 Tons / 45 Tons ( compression )
125 DL+EQP+BT-SLX 0.174 36.423 2.217 -0.708 0 2.913 64.20 16.46 16.93 15.64 15.17 (normal / wind-seismic) 27 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -0.014 59.174 5.479 6.988 0 3.343 86.95 24.81 20.15 18.67 23.33
A-1' 168 101 DL+LL+EQP+BT*1.25 0.924 85.669 5.173 12.391 0 -6.662 106.84 28.62 20.36 24.80 33.06
102 DL+LL+EQP+BT+WL+XPR -1.611 83.075 7.006 16.608 0 -0.831 P3
104.25 31.32 20.25 20.80 31.87
103 DL+LL+EQP+BT+WL+XSUC -0.038 83.066 5.008 12.012 0 -4.448 104.24 28.58 20.57 23.54 31.55
104 DL+LL+EQP+BT+WL-XPR 2.631 73.966 6.308 15.002 0 -10.587 95.14 25.26 15.25 22.31 32.31 X
105 DL+LL+EQP+BT+WL-XSUC 4.15 74.7 4.5 10.844 0 -14.081 95.87 22.89 15.66 25.05 32.28 P2
106 DL+LL+EQP+BT+WL+ZPR 2.485 114.42 -13.05 -29.524 0 -10.251 135.59 20.64 40.32 47.16 27.47
107 DL+LL+EQP+BT+WL+ZSUC 0.735 81.495 -10.413 -23.459 0 -6.226 102.67 15.77 31.41 35.56 19.92
108 DL+LL+EQP+BT+WL-ZPR 2.298 32.866 21.951 50.984 0 -9.821 54.04 27.23 -6.76 -0.21 33.78 P4
109 DL+LL+EQP+BT+WL-ZSUC 0.885 32.621 24.216 56.194 0 -6.571 53.79 29.99 -7.47 -3.09 34.37
110 DL+LL+EQP+BT+SLX -3.821 92.565 0.136 0.806 0 4.252 113.74 30.12 29.58 26.75 27.29
111 DL+LL+EQP+BT+SLZ 1.532 112.043 -7.284 -16.262 0 -8.059 133.21 25.20 36.04 41.41 30.57
112 DL+LL+EQP+BT-SLX 5.039 70.433 9.516 22.381 0 -16.126 91.60 24.99 10.07 20.82 35.74
P1
113 DL+LL+EQP+BT-SLZ -0.314 50.955 16.936 39.449 0 -3.814 72.13 29.91 3.61 6.15 32.45
115 DL+EQP+BT+WL+XPR -1.892 52.942 5.579 13.326 0 -0.184 74.11 22.91 14.02 14.15 23.03 Z
116 DL+EQP+BT+WL+XSUC -0.319 52.933 3.581 8.73 0 -3.802 74.10 20.17 14.35 16.88 22.70
117 DL+EQP+BT+WL-XPR 2.35 43.833 4.881 11.72 0 -9.941 65.00 16.84 9.03 15.66 23.47 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC 3.869 44.567 3.073 7.562 0 -13.435 65.74 14.48 9.44 18.39 23.43 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR 2.204 84.287 -14.477 -32.806 0 -9.605 105.46 12.23 34.10 40.50 18.63 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC 0.454 51.362 -11.84 -26.741 0 -5.58 72.53 7.36 25.19 28.91 11.08 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR 2.017 2.733 20.524 47.702 0 -9.175 23.90 18.82 -12.98 -6.87 24.93 PMAX = 47.16 Tons PMIN = -13.70 Tons
122 DL+EQP+BT+WL-ZSUC 0.604 2.488 22.789 52.912 0 -5.925 23.66 21.58 -13.70 -9.75 25.53
123 DL+EQP+BT+SLX -4.102 62.432 -1.291 -2.476 0 4.899 83.60 21.71 23.36 20.09 18.44 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 1.251 81.91 -8.711 -19.544 0 -7.413 103.08 16.78 29.81 34.76 21.73 PILE CAPACITY = 43 Tons / ### ( compression )
125 DL+EQP+BT-SLX 4.758 40.3 8.089 19.099 0 -15.479 61.47 16.57 3.84 14.16 26.89 (normal / wind-seismic) 31 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -0.595 20.822 15.509 36.167 0 -3.167 41.99 21.50 -2.61 -0.50 23.61
B-3 141 101 DL+LL+EQP+BT*1.25 7.239 116.205 -3.084 -39.629 3.46 -11.691 149.95 17.95 36.54 42.03 23.44 29.99
102 DL+LL+EQP+BT+WL+XPR -3.434 104.778 -7.577 -51.491 2.778 11.88 138.52 18.41 42.57 37.00 12.84 27.70
103 DL+LL+EQP+BT+WL+XSUC -3.761 106.536 -3.279 -41.606 2.778 12.632 140.28 21.26 40.78 34.85 15.33 28.06
104 DL+LL+EQP+BT+WL-XPR 13.305 103.894 -7.598 -51.54 2.778 -26.62 137.63 9.19 33.37 45.86 21.68 27.53
105 DL+LL+EQP+BT+WL-XSUC 13.101 105.381 -3.293 -41.638 2.778 -26.151 139.12 11.92 31.46 43.73 24.19 27.82
106 DL+LL+EQP+BT+WL+ZPR 8.045 102.394 -4.336 -44.037 2.778 -14.522 136.13 13.49 34.15 40.96 20.30 27.23
107 DL+LL+EQP+BT+WL+ZSUC 6.21 101.968 -8.659 -53.98 2.778 -10.302 135.71 12.06 37.39 42.22 16.90 27.14
108 DL+LL+EQP+BT+WL-ZPR 2.341 107.218 0.484 -32.951 2.778 -1.403 140.96 20.13 35.59 36.25 20.79 28.19
109 DL+LL+EQP+BT+WL-ZSUC 3.227 108.273 -3.823 -42.857 2.778 -3.441 142.01 17.54 37.65 39.26 19.16 28.40
110 DL+LL+EQP+BT+SLX -16.229 119.031 -3.343 -41.753 2.778 41.308 152.77 30.45 50.04 30.66 11.07 30.55
111 DL+LL+EQP+BT+SLZ 15.023 111.821 -4.303 -43.961 2.778 -30.572 145.56 11.63 32.25 46.60 25.97 29.11
112 DL+LL+EQP+BT-SLX 25.685 113.867 -3.155 -41.321 2.778 -55.094 147.61 6.90 26.29 52.14 32.75 29.52
113 DL+LL+EQP+BT-SLZ -5.567 121.077 -2.195 -39.113 2.778 16.785 154.82 25.73 44.08 36.20 17.85 30.96
115 DL+EQP+BT+WL+XPR -3.742 57.808 -5.51 -46.737 2.778 12.588 91.55 10.30 32.23 26.32 4.39 18.31
116 DL+EQP+BT+WL+XSUC -4.069 59.566 -1.212 -36.852 2.778 13.34 93.31 13.15 30.44 24.18 6.89 18.66
117 DL+EQP+BT+WL-XPR 12.997 56.924 -5.531 -46.786 2.778 -25.912 90.66 1.08 23.03 35.19 13.24 18.13 S/W of pile cap = = 3.03*3.03*1.2*2.5 = 27.54 tons
118 DL+EQP+BT+WL-XSUC 12.793 58.411 -1.226 -36.884 2.778 -25.443 92.15 3.81 21.11 33.05 15.75 18.43 soil wt = 3.03*3.03*0.375*1.8 = 6.2 tons
119 DL+EQP+BT+WL+ZPR 7.737 55.424 -2.269 -39.283 2.778 -13.814 89.16 5.38 23.81 30.29 11.86 17.83 Moment of inertia about x-x = 2x1.065^2+2x1.065^2 = 4.54 m2
120 DL+EQP+BT+WL+ZSUC 5.902 54.998 -6.592 -49.226 2.778 -9.593 88.74 3.95 27.04 31.55 8.45 17.75 Moment of inertia about z-z = 2x1.065^2 +2x1.065^2 = 4.54 m2
121 DL+EQP+BT+WL-ZPR 2.033 60.248 2.551 -28.197 2.778 -0.695 93.99 12.02 25.25 25.58 12.35 18.80 PMAX = 52.14 Tons PMIN = -1.21 Tons
122 DL+EQP+BT+WL-ZSUC 2.919 61.303 -1.756 -38.103 2.778 -2.732 95.04 9.43 27.31 28.59 10.71 19.01
123 DL+EQP+BT+SLX -16.537 72.061 -1.276 -36.999 2.778 42.016 105.80 22.34 39.70 19.98 2.62 21.16 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 14.715 64.851 -2.236 -39.207 2.778 -29.863 98.59 3.52 21.91 35.92 17.53 19.72 PILE CAPACITY = 43 Tons / ### ( compression )
125 DL+EQP+BT-SLX 25.377 66.897 -1.088 -36.567 2.778 -54.386 100.64 -1.21 15.95 41.46 24.31 20.13 (normal / wind-seismic) 31 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -5.875 74.107 -0.128 -34.359 2.778 17.494 107.85 17.61 33.73 25.53 9.41 21.57
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
B2 144 101 DL+LL+EQP+BT*1.25 4.759 105.941 3.677 -27.378 3.484 -6.517 127.11 20.48 38.73 43.08 24.82
102 DL+LL+EQP+BT+WL+XPR P3
-0.536 108.928 2.713 -31.168 2.799 3.917 130.10 23.44 44.22 41.61 20.83
103 DL+LL+EQP+BT+WL+XSUC -0.766 112.94 3.641 -28.856 2.799 4.472 134.11 25.40 44.64 41.66 22.42
104 DL+LL+EQP+BT+WL-XPR 7.386 76.842 2.611 -31.399 2.799 -14.25 98.01 9.29 30.22 39.72 18.79 X
105 DL+LL+EQP+BT+WL-XSUC 7.145 82.101 3.561 -29.037 2.799 -13.859 103.27 11.52 30.88 40.12 20.76 P2
106 DL+LL+EQP+BT+WL+ZPR 4.666 88.828 0.078 -37.029 2.799 -8.156 110.00 12.44 37.12 42.56 17.88
107 DL+LL+EQP+BT+WL+ZSUC 3.959 96.904 -0.91 -39.481 2.799 -6.366 118.07 14.24 40.56 44.80 18.48
108 DL+LL+EQP+BT+WL-ZPR 2.101 95.347 8.605 -17.356 2.799 -2.255 116.52 22.59 34.16 35.67 24.10 P4
109 DL+LL+EQP+BT+WL-ZSUC 2.672 100.22 7.643 -19.748 2.799 -3.405 121.39 22.63 35.80 38.07 24.90
110 DL+LL+EQP+BT+SLX -6.624 146.336 3.379 -29.44 2.799 18.015 167.51 38.07 57.69 45.68 26.06
111 DL+LL+EQP+BT+SLZ 8.225 118.521 6.127 -23.093 2.799 -16.148 139.69 21.84 37.24 48.00 32.61
112 DL+LL+EQP+BT-SLX 13.3 59.696 4.341 -27.262 2.799 -27.825 80.87 1.85 20.03 38.58 20.40
P1
113 DL+LL+EQP+BT-SLZ -1.549 87.51 1.593 -33.608 2.799 6.338 108.68 18.08 40.49 36.26 13.85
115 DL+EQP+BT+WL+XPR -0.692 76.54 0.562 -36.113 2.799 4.275 97.71 13.81 37.89 35.04 10.96 Z
116 DL+EQP+BT+WL+XSUC -0.922 80.552 1.49 -33.801 2.799 4.831 101.72 15.77 38.31 35.09 12.55
117 DL+EQP+BT+WL-XPR 7.23 44.454 0.46 -36.344 2.799 -13.892 65.62 -0.34 23.89 33.15 8.92 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC 6.989 49.713 1.41 -33.982 2.799 -13.501 70.88 1.89 24.55 33.55 10.89 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR 4.51 56.44 -2.073 -41.974 2.799 -7.797 77.61 2.81 30.79 35.99 8.01 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC 3.803 64.516 -3.061 -44.426 2.799 -6.007 85.69 4.61 34.23 38.23 8.62 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR 1.945 62.959 6.454 -22.301 2.799 -1.897 84.13 12.97 27.83 29.10 14.23 PMAX = 57.69 Tons PMIN = -7.77 Tons
122 DL+EQP+BT+WL-ZSUC 2.516 67.832 5.492 -24.693 2.799 -3.047 89.00 13.00 29.47 31.50 15.04
123 DL+EQP+BT+SLX -6.78 113.948 1.228 -34.385 2.799 18.373 135.12 28.44 51.37 39.12 16.19 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ 8.069 86.133 3.976 -28.038 2.799 -15.789 107.30 12.22 30.91 41.43 22.74 PILE CAPACITY = 48 Tons / 60 Tons ( compression )
125 DL+EQP+BT-SLX 13.144 27.308 2.19 -32.207 2.799 -27.466 48.48 -7.77 13.70 32.01 10.54 (normal / wind-seismic) 38 Tons / 47.5 Tons ( tension )
126 DL+EQP+BT-SLZ -1.705 55.122 -0.558 -38.554 2.799 6.697 76.29 8.45 34.16 29.69 3.99
A-3 177 101 DL+LL+EQP+BT*1.25 3.68 91.019 4.112 27.694 -3.702 -3.396 124.76 30.65 17.66 19.25 32.24 24.95
102 DL+LL+EQP+BT+WL+XPR -8.374 82.316 8.551 40.312 -2.977 23.343 116.06 38.14 19.23 8.28 27.19 23.21
103 DL+LL+EQP+BT+WL+XSUC -10.961 82.988 4.014 29.877 -2.977 29.293 116.73 37.23 23.21 9.47 23.48 23.35
104 DL+LL+EQP+BT+WL-XPR 12.682 83 8.551 40.312 -2.977 -25.086 116.74 26.92 8.01 19.78 38.69 23.35
105 DL+LL+EQP+BT+WL-XSUC 9.727 83.681 4.003 29.852 -2.977 -18.29 117.42 26.20 12.19 20.77 34.78 23.48
106 DL+LL+EQP+BT+WL+ZPR -2.182 90.185 0.426 21.625 -2.977 9.101 123.93 31.99 21.85 17.58 27.72 24.79
107 DL+LL+EQP+BT+WL+ZSUC -0.932 106.873 4.776 31.63 -2.977 6.226 140.61 37.00 22.16 19.24 34.08 28.12
108 DL+LL+EQP+BT+WL-ZPR -1.071 75.971 5.265 32.755 -2.977 6.546 109.71 31.16 15.79 12.72 28.09 21.94
109 DL+LL+EQP+BT+WL-ZSUC 2.696 75.725 9.611 42.75 -2.977 -2.118 109.46 31.42 11.37 12.36 32.42 21.89
110 DL+LL+EQP+BT+SLX -29.784 89.151 3.996 29.836 -2.977 72.586 122.89 48.60 34.61 0.55 14.55 24.58
111 DL+LL+EQP+BT+SLZ 7.367 96.329 3.063 27.69 -2.977 -12.862 130.07 29.49 16.50 22.54 35.53 26.01
112 DL+LL+EQP+BT-SLX 32.142 95.061 4.178 30.254 -2.977 -69.844 128.80 16.47 2.28 35.05 49.24 25.76
113 DL+LL+EQP+BT-SLZ -5.009 87.883 5.111 32.4 -2.977 15.603 121.62 35.59 20.38 13.06 28.26 24.32
115 DL+EQP+BT+WL+XPR -7.982 52.574 6.552 35.715 -2.977 22.441 86.31 30.91 14.15 3.62 20.38 17.26
116 DL+EQP+BT+WL+XSUC -10.569 53.246 2.015 25.28 -2.977 28.391 86.99 29.99 18.13 4.81 16.67 17.40
117 DL+EQP+BT+WL-XPR 13.074 53.258 6.552 35.715 -2.977 -25.988 87.00 19.68 2.93 15.12 31.87 17.40 S/W of pile cap = = 3.03*3.03*1.2*2.5 = 27.54 tons
118 DL+EQP+BT+WL-XSUC 10.119 53.939 2.004 25.254 -2.977 -19.191 87.68 18.96 7.11 16.11 27.96 17.54 soil wt = 3.03*3.03*0.375*1.8 = 6.2 tons
119 DL+EQP+BT+WL+ZPR -1.79 60.443 -1.573 17.027 -2.977 8.2 94.18 24.75 16.77 12.92 20.91 18.84 Moment of inertia about x-x = 2x1.065^2+2x1.065^2 = 4.54 m2
120 DL+EQP+BT+WL+ZSUC -0.54 77.131 2.777 27.032 -2.977 5.325 110.87 29.76 17.08 14.58 27.27 22.17 Moment of inertia about z-z = 2x1.065^2 +2x1.065^2 = 4.54 m2
121 DL+EQP+BT+WL-ZPR -0.679 46.229 3.266 28.157 -2.977 5.644 79.97 23.92 10.71 8.06 21.27 15.99 PMAX = 49.24 Tons PMIN = -4.11 Tons
122 DL+EQP+BT+WL-ZSUC 3.088 45.983 7.612 38.153 -2.977 -3.02 79.72 24.19 6.29 7.70 25.60 15.94
123 DL+EQP+BT+SLX -29.392 59.409 1.997 25.238 -2.977 71.684 93.15 41.37 29.53 -4.11 7.73 18.63 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 7.759 66.587 1.064 23.092 -2.977 -13.763 100.33 22.25 11.42 17.88 28.71 20.07 PILE CAPACITY = 43 Tons / ### ( compression )
125 DL+EQP+BT-SLX 32.534 65.319 2.179 25.657 -2.977 -70.746 99.06 9.23 -2.80 30.39 42.43 19.81 (normal / wind-seismic) 31 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -4.617 58.141 3.112 27.803 -2.977 14.702 91.88 28.35 15.30 8.41 21.45 18.38
A2 180 101 DL+LL+EQP+BT*1.25 3.176 101.006 -3.165 22.722 -3.488 -2.867 122.18 37.16 22.01 23.93 39.07
102 DL+LL+EQP+BT+WL+XPR -2.48 103.326 -2.153 25.912 -2.795 8.297 124.50 42.53 25.25 19.72 37.00 P3
103 DL+LL+EQP+BT+WL+XSUC -3.472 107.667 -3.299 23.277 -2.795 10.579 128.84 43.49 27.98 20.92 36.44
104 DL+LL+EQP+BT+WL-XPR 6.949 70.092 -2.269 25.646 -2.795 -13.39 91.26 26.90 9.80 18.73 35.83 X
105 DL+LL+EQP+BT+WL-XSUC 5.791 75.392 -3.393 23.06 -2.795 -10.726 96.56 28.25 12.88 20.03 35.40 P2
106 DL+LL+EQP+BT+WL+ZPR 0.514 92.662 -7.499 13.617 -2.795 1.411 113.83 33.47 24.39 23.45 32.53
107 DL+LL+EQP+BT+WL+ZSUC 0.902 97.938 -6.421 16.096 -2.795 0.518 119.11 35.32 24.58 24.24 34.97
108 DL+LL+EQP+BT+WL-ZPR 0.924 76.895 1.02 33.21 -2.795 0.468 98.07 35.74 13.60 13.29 35.43 P4
109 DL+LL+EQP+BT+WL-ZSUC 2.44 81.695 2.131 35.766 -2.795 -3.019 102.87 36.63 12.79 14.80 38.64
110 DL+LL+EQP+BT+SLX -12 144.907 -3.575 22.642 -2.795 30.193 166.08 59.13 44.04 23.91 39.00
111 DL+LL+EQP+BT+SLZ 4.563 112.401 -0.825 28.967 -2.795 -7.902 133.57 40.41 21.10 26.37 45.68
112 DL+LL+EQP+BT-SLX 15.604 51.091 -2.619 24.841 -2.795 -33.296 72.26 15.25 -1.31 20.88 37.44
113 DL+LL+EQP+BT-SLZ -0.959 83.597 -5.369 18.516 -2.795 4.799 P1
104.77 33.96 21.62 18.42 30.76
115 DL+EQP+BT+WL+XPR -2.377 75.515 -0.757 29.123 -2.795 8.06 96.69 36.57 17.15 11.78 31.19 Z
116 DL+EQP+BT+WL+XSUC -3.369 79.856 -1.903 26.487 -2.795 10.342 101.03 37.53 19.87 12.98 30.64
117 DL+EQP+BT+WL-XPR 7.052 42.281 -0.873 28.856 -2.795 -13.627 63.45 20.94 1.70 10.79 30.02 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC 5.894 47.581 -1.997 26.271 -2.795 -10.963 68.75 22.29 4.78 12.09 29.60 soil wt = 2.4*2.4*0.375*1.8 = 3.89 tons
119 DL+EQP+BT+WL+ZPR 0.617 64.851 -6.103 16.827 -2.795 1.174 86.02 27.51 16.29 15.50 26.72 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC 1.005 70.127 -5.025 19.307 -2.795 0.282 91.30 29.35 16.48 16.29 29.17 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR 1.027 49.084 2.416 36.421 -2.795 0.231 70.25 29.78 5.50 5.35 29.63 PMAX = 59.13 Tons PMIN = -9.42 Tons
122 DL+EQP+BT+WL-ZSUC 2.543 53.884 3.527 38.976 -2.795 -3.256 75.05 30.67 4.69 6.86 32.84
123 DL+EQP+BT+SLX -11.897 117.096 -2.179 25.853 -2.795 29.956 138.27 53.17 35.93 15.96 33.20 PILE LENGTH = 30 M
124 DL+EQP+BT+SLZ 4.666 84.59 0.571 32.178 -2.795 -8.139 105.76 34.45 13.00 18.43 39.88 PILE CAPACITY = 48 Tons / 60 Tons ( compression )
125 DL+EQP+BT-SLX 15.707 23.28 -1.223 28.051 -2.795 -33.533 44.45 9.29 -9.42 12.94 31.64 (normal / wind-seismic) 38 Tons / 47.5 Tons ( tension )
126 DL+EQP+BT-SLZ -0.856 55.786 -3.973 21.726 -2.795 4.562 76.96 28.00 13.52 10.48 24.96
A'-1' 159 101 DL+LL+EQP+BT*1.25 0.273 82.622 0.01 0.378 0 -5.032 103.79 24.40 24.14 27.50 27.75
102 DL+LL+EQP+BT+WL+XPR -2.029 79.272 0.134 1.557 0 0.164 100.44 25.68 24.65 24.54 25.57 P3
103 DL+LL+EQP+BT+WL+XSUC 1.533 79.488 -0.042 0.269 0 -7.996 100.66 22.59 22.41 27.74 27.92
104 DL+LL+EQP+BT+WL-XPR 1.024 81.055 -0.324 0.503 0 -6.793 102.23 23.46 23.12 27.65 27.99 X
105 DL+LL+EQP+BT+WL-XSUC 4.597 80.736 -0.376 -0.5 0 -15.176 101.91 20.25 20.58 30.70 30.37 P2
106 DL+LL+EQP+BT+WL+ZPR 4.035 40.509 -11.102 -24.979 0 -13.884 61.68 2.47 19.12 28.37 11.72
107 DL+LL+EQP+BT+WL+ZSUC 0.474 81.942 -10.507 -22.725 0 -5.528 103.11 16.36 31.51 35.20 20.05
108 DL+LL+EQP+BT+WL-ZPR 4.919 121.683 10.998 24.933 0 -15.917 142.85 38.72 22.10 32.71 49.33 P4
109 DL+LL+EQP+BT+WL-ZSUC 1.382 125.032 11.346 26.617 0 -7.616 146.20 42.88 25.14 30.22 47.96
110 DL+LL+EQP+BT+SLX -2.041 93.096 -3.234 -7.089 0 0.291 114.27 26.30 31.03 30.83 26.11
111 DL+LL+EQP+BT+SLZ 0.752 50.17 -8.007 -18.102 0 -6.134 71.34 9.76 21.82 25.91 13.85
112 DL+LL+EQP+BT-SLX 2.509 68.051 2.792 6.798 0 -10.176 89.22 21.18 16.65 23.43 27.96
113 DL+LL+EQP+BT-SLZ -0.284 110.977 7.565 17.811 0 -3.751 P1
132.15 37.72 25.85 28.35 40.22
115 DL+EQP+BT+WL+XPR -2.1 51.766 0.42 2.192 0 0.327 72.94 19.07 17.61 17.39 18.86 Z
116 DL+EQP+BT+WL+XSUC 1.462 51.982 0.244 0.904 0 -7.833 73.15 15.98 15.38 20.60 21.20
117 DL+EQP+BT+WL-XPR 0.953 53.548 -0.038 1.139 0 -6.629 74.72 16.85 16.09 20.51 21.27 S/W of pile cap = = 2.4*2.4*1.2*2.5 = 17.28 tons
118 DL+EQP+BT+WL-XSUC 4.526 53.23 -0.09 0.136 0 -15.013 74.40 13.64 13.55 23.56 23.65 soil wt = 2.4*2.4*0.575*1.8 = 5.96 tons
119 DL+EQP+BT+WL+ZPR 3.964 13.003 -10.816 -24.344 0 -13.721 34.17 -4.15 12.08 21.23 5.00 Moment of inertia about x-x = 2x0.75^2+2x0.75^2 = 2.25 m2
120 DL+EQP+BT+WL+ZSUC 0.403 54.436 -10.221 -22.09 0 -5.365 75.61 9.75 24.48 28.05 13.33 Moment of inertia about z-z = 2x0.75^2 +2x0.75^2 = 2.25 m2
121 DL+EQP+BT+WL-ZPR 4.848 94.176 11.284 25.569 0 -15.753 115.35 32.11 15.06 25.56 42.61 PMAX = 49.33 Tons PMIN = -4.15 Tons
122 DL+EQP+BT+WL-ZSUC 1.311 97.526 11.632 27.253 0 -7.453 118.70 36.27 18.11 23.07 41.24
123 DL+EQP+BT+SLX -2.112 65.589 -2.948 -6.454 0 0.454 86.76 19.69 23.99 23.69 19.39 PILE LENGTH = 28 M
124 DL+EQP+BT+SLZ 0.681 22.664 -7.721 -17.467 0 -5.971 43.83 3.15 14.79 18.77 7.13 PILE CAPACITY = 43 Tons / ### ( compression )
125 DL+EQP+BT-SLX 2.438 40.545 3.078 7.434 0 -10.013 61.72 14.57 9.61 16.29 21.24 (normal / wind-seismic) 31 Tons / ### ( tension )
126 DL+EQP+BT-SLZ -0.355 83.47 7.851 18.447 0 -3.587 104.64 31.11 18.82 21.21 33.50
B5 201 101 DL+LL+EQP+BT*1.25 6.57 64.00 -9.04 0.00 0.00 0.00 72.37 36.19 36.19
102 DL+LL+EQP+BT+WL+XPR 5.76 65.58 -7.40 0.00 0.00 0.00 73.95 36.98 36.98
103 DL+LL+EQP+BT+WL+XSUC 5.18 65.50 -7.28 0.00 0.00 0.00 73.87 36.94 36.94
104 DL+LL+EQP+BT+WL-XPR 5.76 65.56 -7.40 0.00 0.00 0.00 73.93 36.97 36.97
105 DL+LL+EQP+BT+WL-XSUC 5.18 65.48 -7.28 0.00 0.00 0.00 73.85 36.92 36.92
106 DL+LL+EQP+BT+WL+ZPR 5.30 65.51 -7.31 0.00 0.00 0.00 73.88 36.94 36.94
107 DL+LL+EQP+BT+WL+ZSUC 5.87 65.61 -7.42 0.00 0.00 0.00 73.98 36.99 36.99
108 DL+LL+EQP+BT+WL-ZPR 4.72 65.42 -7.19 0.00 0.00 0.00 73.79 36.90 36.90
109 DL+LL+EQP+BT+WL-ZSUC 5.07 65.47 -7.26 0.00 0.00 0.00 73.84 36.92 36.92
110 DL+LL+EQP+BT+SLX 5.18 65.53 -7.28 0.00 0.00 0.00 73.90 36.95 36.95
111 DL+LL+EQP+BT-SLX 5.18 65.49 -7.28 0.00 0.00 0.00 73.86 36.93 36.93
112 DL+LL+EQP+BT+SLZ 5.18 65.48 -7.28 0.00 0.00 0.00 73.85 36.93 36.93
113 DL+LL+EQP+BT-SLZ 5.18 65.52 -7.28 0.00 0.00 0.00 73.89 36.94 36.94
114 DL+EQP+BT+WL+XPR 5.76 65.54 -7.40 0.00 0.00 0.00 73.91 36.96 36.96 total wt 6.48 tons
115 DL+EQP+BT+WL+XSUC 5.18 65.46 -7.28 0.00 0.00 0.00 73.83 36.91 36.91 soil wt 1.46 tons
116 DL+EQP+BT+WL-XPR 5.76 65.52 -7.40 0.00 0.00 0.00 73.89 36.95 36.95 Iz = 1.125 m4
117 DL+EQP+BT+WL-XSUC 5.18 65.43 -7.28 0.00 0.00 0.00 73.80 36.90 36.90 Ix = 0 m4
118 DL+EQP+BT+WL+ZPR 5.30 65.47 -7.31 0.00 0.00 0.00 73.84 36.92 36.92
119 DL+EQP+BT+WL+ZSUC 5.87 65.57 -7.42 0.00 0.00 0.00 73.94 36.97 36.97 PMAX = 36.99 Tons PMIN = 36.19 Tons
120 DL+EQP+BT+WL-ZPR 4.72 65.38 -7.19 0.00 0.00 0.00 73.75 36.87 36.87
121 DL+EQP+BT+WL-ZSUC 5.07 65.42 -7.26 0.00 0.00 0.00 73.79 36.90 36.90 PILE LENGTH = 22 M
122 DL+EQP+BT+SLX 5.18 65.48 -7.28 0.00 0.00 0.00 73.85 36.93 36.93 PILE CAPACITY = 28 Tons / 35 Tons ( compr )
123 DL+EQP+BT-SLX 5.18 65.45 -7.28 0.00 0.00 0.00 73.82 36.91 36.91 (normal / wind-seismic) 20 Tons / 25 Tons ( tension )
124 DL+EQP+BT+SLZ 5.18 65.44 -7.28 0.00 0.00 0.00 73.81 36.90 36.90
125 DL+EQP+BT-SLZ 5.18 65.48 -7.28 0.00 0.00 0.00 73.85 36.92 36.92
TRANSFER POINT TP17 : DESIGN OF FOUNDATION SYSTEM
Eccen.
COLUMN Mx Mz Mx Mz Fy total Mz total
Node L/C Fy Mton Node Fy Mton Mom Mz P1 P2 P3 P4 P5 P6 PILE CAP DETAIL
GRID MTon-m MTon-m MTon-m MTon-m (tons) (Mton-m)
Mton-m
COLUMN Mx My Mz Fy total
Node L/C Fx Mton Fy Mton Fz Mton P1 P2 P3 P4 P5 P6 P7 P8 PILE CAP DETAILS
GRID MTon-m MTon-m MTon-m (tons)
B'6 & SC2 114 101 DL+LL+EQP+BT*1.25 21.401 -17.032 3.212 115 16.968 0 8.846 38.37 4.07 16.13 5.30 2.62 -0.07 12.86 10.17 7.49
102 DL+LL+EQP+BT+WL+XPR 22.137 -22.919 6.39 17.71 -8.638 7.923 39.85 4.06 18.37 2.70 -0.36 -3.42 16.71 13.64 10.58
103 DL+LL+EQP+BT+WL+XSUC 16.973 -20.821 16.972 21.868 0 6.828 38.84 4.49 28.29 6.57 1.85 -2.86 15.81 11.09 6.38
104 DL+LL+EQP+BT+WL-XPR 25.845 -19.931 -3.606 11.964 -8.638 9.761 37.81 12.74 18.89 3.11 -0.04 -3.19 15.79 12.64 9.49
105 DL+LL+EQP+BT+WL-XSUC 21.291 -18.213 6.553 15.521 0 9.015 36.81 5.29 20.86 5.57 2.09 -1.38 13.65 10.18 6.70
106 DL+LL+EQP+BT+WL+ZPR -27.497 -65.46 22.147 -6.976 -1.721 7.476 -34.47 18.83 48.45 -12.58 -20.65 -28.73 17.24 9.16 1.09
107 DL+LL+EQP+BT+WL+ZSUC 20.982 -70.207 12.581 16.875 -10.359 8.948 37.86 3.77 25.30 -7.35 -11.57 -15.78 28.40 24.19 19.97
108 DL+LL+EQP+BT+WL-ZPR 88.386 45.485 6.53 31.205 6.918 8.942 119.59 52.46 67.94 42.88 31.56 20.24 19.63 8.30 -3.02
109 DL+LL+EQP+BT+WL-ZSUC 88.117 46.902 -3.956 35.902 1.727 8.522 124.02 47.91 52.47 40.21 31.46 22.71 18.63 9.88 1.13
110 DL+LL+EQP+BT+SLX 3.518 -0.846 5.932 9.673 0 6.792 13.19 5.65 18.37 5.07 2.01 -1.05 5.45 2.39 -0.68
111 DL+LL+EQP+BT+SLZ -28.509 -62.433 8.648 2.737 0 7.541 -25.77 28.67 44.86 -10.67 -18.15 -25.62 17.03 9.56 2.08 918
112 DL+LL+EQP+BT-SLX 38.446 -32.549 0.55 24.066 0 10.847 62.51 13.19 24.59 7.29 3.20 -0.90 21.74 17.64 13.54
113 DL+LL+EQP+BT-SLZ 70.473 29.038 -2.166 31.002 0 10.098 101.48 36.21 44.15 30.71 23.36 16.00 17.83 10.47 3.11
115 DL+EQP+BT+WL+XPR 16.507 -21.647 4.715 11.007 -8.638 4.714 27.51 5.05 14.48 0.28 -2.14 -4.55 13.72 11.31 8.89
116 DL+EQP+BT+WL+XSUC 11.343 -19.55 15.298 15.166 0 3.618 26.51 3.51 22.42 3.82 0.08 -3.66 12.49 8.76 5.02 S/W of pile cap = 3.9*2.4*1.2*2.5 =
117 DL+EQP+BT+WL-XPR 20.215 -18.659 -5.281 5.261 -8.638 6.551 25.48 13.72 14.99 0.69 -1.81 -4.31 12.80 10.30 7.81 soil wt =3.9*2.4*0.375*1.8 =
118 DL+EQP+BT+WL-XSUC 15.661 -16.941 4.879 8.819 0 5.805 24.48 6.28 16.96 3.15 0.32 -2.51 10.67 7.84 5.01
119 DL+EQP+BT+WL+ZPR -33.127 -64.188 20.473 -13.679 -1.721 4.267 -46.81 17.84 42.58 -15.33 -22.43 -29.52 13.92 6.82 -0.27 Moment of inertia x-x =
120 DL+EQP+BT+WL+ZSUC 15.352 -68.935 10.907 10.172 -10.359 5.738 25.52 4.75 21.40 -9.78 -13.34 -16.91 25.41 21.85 18.28 Moment of inertia z-z =
121 DL+EQP+BT+WL-ZPR 82.756 46.757 4.856 24.502 6.918 5.733 107.26 53.45 64.04 40.46 29.79 19.11 16.64 5.97 -4.71 Section modulus about x-x =
122 DL+EQP+BT+WL-ZSUC 82.487 48.174 -5.63 29.199 1.727 5.313 111.69 48.89 49.21 37.89 29.69 21.49 15.74 7.54 -0.66 Section modulus about z-z =
123 DL+EQP+BT+SLX -2.112 0.426 4.258 2.97 0 3.582 0.86 4.66 12.50 2.32 0.24 -1.85 2.13 0.05 -2.03 PMAX = 42.88 Tons
124 DL+EQP+BT+SLZ -34.139 -61.161 6.974 -3.966 0 4.331 -38.11 27.68 38.99 -13.42 -19.92 -26.42 13.72 7.22 0.72 PILE LENGTH =
125 DL+EQP+BT-SLX 32.816 -31.277 -1.124 17.363 0 7.638 50.18 14.18 20.69 4.87 1.42 -2.03 18.75 15.30 11.85 PILE CAPACITY =
126 DL+EQP+BT-SLZ 64.843 30.31 -3.841 24.299 0 6.889 89.14 37.20 40.25 28.29 21.58 14.87 14.84 8.13 1.42 ( normal / wind-seismic)
Eccen.
COLUMN Mx Mz Mx Mz Fy total Mz total
Node L/C Fy Mton Node Fy Mton Mom Mz P1 P2 P3 P4 P5 P6 P7 P8 PIL
GRID MTon-m MTon-m MTon-m MTon-m (tons) (Mton-m)
Mton-m
A5 & SC1 186 101 DL+LL+EQP+BT*1.25 152.857 67.264 -3.42 183 8.39 0.00 3.558 161.25 11.44 11.58 32.42 31.72 37.73 37.03 10.00 9.30 15.31 14.61
102 DL+LL+EQP+BT+WL+XPR 139.764 77.806 -3.311 8.374 0.00 3.558 148.14 9.18 9.42 32.34 31.77 37.37 36.80 6.41 5.84 11.44 10.87
103 DL+LL+EQP+BT+WL+XSUC 139.927 63.368 -3.258 8.374 0.00 3.558 148.30 9.20 9.50 29.96 29.39 34.99 34.41 8.84 8.26 13.87 13.29
104 DL+LL+EQP+BT+WL-XPR 133.8 77.806 -3.467 8.372 0.00 3.558 142.17 8.14 8.23 31.49 30.99 36.41 35.91 5.55 5.05 10.48 9.98
105 DL+LL+EQP+BT+WL-XSUC 134.224 63.362 -3.411 8.372 0.00 3.558 142.60 8.21 8.36 29.15 28.64 34.07 33.57 8.02 7.52 12.95 12.45
106 DL+LL+EQP+BT+WL+ZPR 136.17 52.832 -3.309 8.375 0.00 3.558 144.55 8.55 8.79 27.67 27.14 32.63 32.10 10.06 9.53 15.02 14.49
107 DL+LL+EQP+BT+WL+ZSUC 145.256 67.306 -3.358 8.388 0.00 3.558 153.64 10.11 10.31 31.36 30.74 36.51 35.89 8.92 8.30 14.08 13.45
108 DL+LL+EQP+BT+WL-ZPR 141.737 65.451 -3.311 8.376 0.00 3.558 150.11 9.52 9.76 30.56 29.97 35.63 35.04 8.74 8.15 13.81 13.22
109 DL+LL+EQP+BT+WL-ZSUC 141.427 79.796 -3.377 8.375 0.00 3.558 149.80 9.47 9.65 32.90 32.32 37.97 37.39 6.30 5.72 11.38 10.79
110 DL+LL+EQP+BT+SLX 159.025 64.059 -3.144 8.392 0.00 3.558 167.42 12.51 12.93 32.78 32.00 38.19 37.40 11.43 10.64 16.84 16.05
111 DL+LL+EQP+BT+SLZ 151.21 64.771 -3.423 8.389 0.00 3.558 159.60 11.15 11.29 31.77 31.09 37.05 36.37 10.18 9.50 15.46 14.78
112 DL+LL+EQP+BT-SLX 140.029 63.035 -3.607 8.384 0.00 3.558 148.41 9.20 9.25 29.90 29.34 34.96 34.40 8.89 8.33 13.95 13.39
113 DL+LL+EQP+BT-SLZ 147.844 62.324 -3.328 8.387 0.00 3.558 156.23 10.57 10.80 30.90 30.24 36.10 35.44 10.12 9.47 15.32 14.67
115 DL+EQP+BT+WL+XPR 106.172 78.538 -3.326 8.333 0.00 3.558 114.51 3.37 3.60 27.73 27.51 32.07 31.85 1.55 1.33 5.89 5.67
116 DL+EQP+BT+WL+XSUC 106.335 64.1 -3.273 8.333 0.00 3.558 114.67 3.40 3.69 25.35 25.13 29.68 29.46 3.99 3.76 8.32 8.09 S/W of pile cap = 5.85*2.4
117 DL+EQP+BT+WL-XPR 100.208 78.538 -3.482 8.331 0.00 3.558 108.54 2.33 2.41 26.88 26.73 31.11 30.96 0.70 0.55 4.93 4.78
118 DL+EQP+BT+WL-XSUC 100.632 64.094 -3.426 8.331 0.00 3.558 108.96 2.41 2.54 24.53 24.38 28.77 28.61 3.17 3.01 7.40 7.25
119 DL+EQP+BT+WL+ZPR 102.578 53.564 -3.324 8.334 0.00 3.558 110.91 2.74 2.98 23.06 22.88 27.32 27.14 5.21 5.03 9.47 9.29 Moment of inertia x-x =
120 DL+EQP+BT+WL+ZSUC 111.665 68.039 -3.373 8.347 0.00 3.558 120.01 4.31 4.49 26.75 26.48 31.21 30.93 4.07 3.80 8.53 8.25 Moment of inertia z-z =
121 DL+EQP+BT+WL-ZPR 108.145 66.184 -3.326 8.335 0.00 3.558 116.48 3.71 3.95 25.95 25.71 30.32 30.09 3.89 3.65 8.26 8.02 Section modulus about x-x =
122 DL+EQP+BT+WL-ZSUC 107.835 80.529 -3.392 8.334 0.00 3.558 116.17 3.66 3.83 28.29 28.06 32.67 32.44 1.45 1.22 5.82 5.59 Section modulus about z-z =
123 DL+EQP+BT+SLX 125.433 64.792 -3.159 8.351 0.00 3.558 133.78 6.71 7.11 28.17 27.74 32.88 32.45 6.57 6.14 11.28 10.85
124 DL+EQP+BT+SLZ 117.618 65.503 -3.438 8.348 0.00 3.558 125.97 5.35 5.47 27.16 26.83 31.75 31.42 5.33 4.99 9.91 9.58
125 DL+EQP+BT-SLX 106.437 63.768 -3.622 8.343 0.00 3.558 114.78 3.40 3.46 25.29 25.08 29.65 29.44 4.03 3.82 8.40 8.19 PILE CAPACITY =
126 DL+EQP+BT-SLZ 114.252 63.057 -3.342 8.346 0.00 3.558 122.60 4.76 4.98 26.29 25.99 30.79 30.49 5.27 4.97 9.77 9.47 ( normal / wind-seismic)
Eccen.
COLUMN Mx Mz Mx Mz Fy total Mz total
Node L/C Fy Mton Node Fy Mton Mom Mz P1 P2 P3 P4 P5 P6 PILE CAP DETAIL
GRID MTon-m MTon-m MTon-m MTon-m (tons) (Mton-m)
Mton-m
B'4 & SC5 130 101 DL+LL+EQP+BT*1.25 21.089 -0.003 -23.9 135 42.231 -33.727 -0.414 63.32 15.59 39.91 12.23 6.73 1.24 19.87 14.37 8.88
102 DL+LL+EQP+BT+WL+XPR 17.803 -9.864 -22.774 41.801 -34.795 1.941 59.60 17.70 38.53 10.18 4.87 -0.43 20.30 14.99 9.69
103 DL+LL+EQP+BT+WL+XSUC 20.46 -0.007 -23.387 40.053 -33.344 -3.686 60.51 14.45 41.52 12.03 6.31 0.59 19.58 13.86 8.14
104 DL+LL+EQP+BT+WL-XPR 21.042 -9.911 -19.531 40.64 -38.214 -3.25 61.68 14.45 37.23 9.96 4.83 -0.30 20.86 15.73 10.60
105 DL+LL+EQP+BT+WL-XSUC 24.731 -0.046 -19.435 36.67 -35.499 -11.286 61.40 8.81 39.53 11.65 6.21 0.76 19.70 14.26 8.82
106 DL+LL+EQP+BT+WL+ZPR -8.588 -1.988 -22.722 -21.671 -96.737 -19.539 -30.26 9.65 51.91 -9.08 -16.23 -23.38 13.29 6.14 -1.01
107 DL+LL+EQP+BT+WL+ZSUC 21.255 -11.839 -23.89 42.665 -98.967 -8.561 63.92 15.79 48.24 4.74 -1.90 -8.54 29.85 23.21 16.56
108 DL+LL+EQP+BT+WL-ZPR 37.73 7.879 -21.763 124.406 39.596 -4.876 162.14 63.92 90.56 44.88 32.40 19.93 34.12 21.64 9.17
109 DL+LL+EQP+BT+WL-ZSUC 43.538 1.944 -20.847 123.153 39.99 5.418 166.69 58.72 74.15 42.75 32.53 22.32 33.24 23.03 12.82
110 DL+LL+EQP+BT+SLX 27.54 0.034 -27.463 53.172 -42.82 -1.821 80.71 18.90 48.19 15.24 8.60 1.97 24.94 18.30 11.66
111 DL+LL+EQP+BT+SLZ 10.637 -0.025 -21.683 13.03 -61.143 -3.175 23.67 1.76 26.62 0.68 -2.98 -6.65 14.54 10.87 7.21
112 DL+LL+EQP+BT-SLX 15.19 -0.037 -20.418 32.158 -24.452 1.105 47.35 12.51 31.83 9.50 5.12 0.73 15.05 10.67 6.28
113 DL+LL+EQP+BT-SLZ 32.094 0.022 -26.197 72.3 -6.129 2.459 104.39 29.65 53.39 24.06 16.71 9.35 25.44 18.09 10.74
115 DL+EQP+BT+WL+XPR 11.859 -9.932 -16.158 34.165 -24.628 3.926 46.02 16.45 28.68 7.71 3.75 -0.20 15.54 11.59 7.63
116 DL+EQP+BT+WL+XSUC 14.516 -0.074 -16.771 32.417 -23.176 -1.701 46.93 13.20 31.67 9.55 5.19 0.82 14.82 10.46 6.09 S/W of pile cap = 4.2*3.0*1.2*2.5 =
117 DL+EQP+BT+WL-XPR 15.099 -9.978 -12.915 33.004 -28.046 -1.265 48.10 13.20 27.38 7.48 3.71 -0.06 16.10 12.32 8.55 soil wt =4.2*3.0*0.375*1.8 =
118 DL+EQP+BT+WL-XSUC 18.787 -0.114 -12.82 29.034 -25.331 -9.3 47.82 7.56 29.68 9.18 5.09 1.00 14.94 10.85 6.76
119 DL+EQP+BT+WL+ZPR -14.532 -2.055 -16.106 -29.307 -86.57 -17.554 -43.84 10.90 44.56 -11.21 -17.35 -23.48 8.87 2.73 -3.40 Moment of inertia x-x =
120 DL+EQP+BT+WL+ZSUC 15.312 -11.906 -17.274 35.029 -88.8 -6.576 50.34 14.54 38.39 2.27 -3.02 -8.31 25.09 19.80 14.51 Moment of inertia z-z =
121 DL+EQP+BT+WL-ZPR 31.786 7.811 -15.148 116.77 49.764 -2.891 148.56 62.68 80.71 42.40 31.28 20.17 29.35 18.24 7.12 Section modulus about x-x =
122 DL+EQP+BT+WL-ZSUC 37.595 1.877 -14.232 115.517 50.158 7.404 153.11 57.47 64.30 40.27 31.41 22.56 28.48 19.62 10.77 Section modulus about z-z =
123 DL+EQP+BT+SLX 21.596 -0.033 -20.847 45.536 -32.652 0.164 67.13 17.66 38.34 12.77 7.49 2.20 20.17 14.89 9.61 PMAX = 44.88 Tons
124 DL+EQP+BT+SLZ 4.693 -0.092 -15.067 5.394 -50.975 -1.189 10.09 0.52 16.77 -1.79 -4.10 -6.41 9.78 7.47 5.16 PILE LENGTH =
125 DL+EQP+BT-SLX 9.247 -0.104 -13.802 24.522 -14.285 3.09 33.77 11.27 21.98 7.03 4.00 0.97 10.29 7.26 4.23 PILE CAPACITY =
126 DL+EQP+BT-SLZ 26.15 -0.045 -19.582 64.664 4.038 4.444 90.81 28.40 43.54 21.58 15.59 9.59 20.68 14.68 8.69 ( normal / wind-seismic)
P1
total wt
soil wt
Iz =
Ix =
PMAX = 35.00 Tons
PMIN = -10.66 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
P1
total wt
soil wt
Iz =
Ix =
PMAX = 35.00 Tons
PMIN = -9.89 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
total wt
soil wt
Iz =
Ix =
PMAX = 60.00 Tons
PMIN = -4.61 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
total wt
soil wt
Iz =
Ix =
PMAX = 53.75 Tons
PMIN = -11.26 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
P1
1.065
1.515
P1
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
1.065
1.515
total wt
soil wt
Iz =
Ix =
PMAX = 45.00 Tons
PMIN = -6.85 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
P1
total wt
soil wt
Iz =
Ix =
PMAX = 45.00 Tons
PMIN = 2.25 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
total wt
soil wt
Iz =
Ix =
PMAX = 53.75 Tons
PMIN = -13.70 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
1.065
1.515
P1
total wt
soil wt
Iz =
Ix =
PMAX = 60.00 Tons
PMIN = -7.77 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
1.065
1.515
total wt
soil wt
Iz =
Ix =
PMAX = 60.00 Tons
PMIN = -9.42 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
total wt
soil wt
Iz =
Ix =
PMAX = 53.75 Tons
PMIN = -4.15 Tons
PILE LENGTH =
PILE CAPACITY =
(normal / wind-seismic)
918
1475
==
Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal TOTAL FX Rowwise
ROW A L/C
Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Mton pile reqt
101 DL+LL+EQP+BT*1.25 195 -0.02 192 -0.25 189 0.04 186 0.35 183 0 174 0.97 177 4.22 180 3.67 171 -0.11 168 0.92 9.79 2.33
102 DL+LL+EQP+BT+WL+XPR A8 -0.19 A7 -0.52 A6 -0.39 A5 0.26 SC1 0 A4 -5.38 A3 -7.94 A2 -2.08 A1 0.03 A1' -1.61 -17.82 3.39
103 DL+LL+EQP+BT+WL+XSUC -0.99 -1.74 -0.7 0.21 0 -6.9 -10.53 -3.07 -0.01 -0.04 -23.77 4.53
104 DL+LL+EQP+BT+WL-XPR 0.48 0.6 0.41 0.32 0 5.92 13.12 7.35 -0.23 2.63 30.6 5.83
105 DL+LL+EQP+BT+WL-XSUC -0.33 -0.62 0.09 0.28 0 4.21 10.16 6.19 -0.27 4.15 23.86 4.54
106 DL+LL+EQP+BT+WL+ZPR -0.98 -1.68 -0.47 0.24 0 -2.22 -1.75 0.91 -0.15 2.49 -3.61 0.69
107 DL+LL+EQP+BT+WL+ZSUC -0.18 -0.47 -0.18 0.28 0 -1.42 -0.5 1.3 -0.09 0.73 -0.53 0.10
108 DL+LL+EQP+BT+WL-ZPR -0.99 -1.64 -0.42 0.21 0 -1.56 -0.64 1.32 -0.1 2.3 -1.52 0.29
109 DL+LL+EQP+BT+WL-ZSUC -0.17 -0.43 -0.05 0.26 0 0.59 3.13 2.84 -0.07 0.88 6.98 1.33
110 DL+LL+EQP+BT+SLX -0.06 -0.52 -1.19 0.16 0 -16.95 -29.35 -11.6 0.26 -3.82 -63.07 12.01
111 DL+LL+EQP+BT+SLZ -0.01 -0.14 0.17 0.28 0 3.06 7.8 4.96 -0.16 1.53 17.49 3.33
112 DL+LL+EQP+BT-SLX 0.03 0.11 1.06 0.36 0 16.41 32.58 16 -0.43 5.04 71.16 13.55
113 DL+LL+EQP+BT-SLZ -0.03 -0.27 -0.29 0.24 0 -3.6 -4.57 -0.56 -0.01 -0.31 -9.4 1.79
115 DL+EQP+BT+WL+XPR -0.19 -0.56 -0.31 0.26 0 -5.1 -7.55 -1.98 0.07 -1.89 -17.25 3.29
116 DL+EQP+BT+WL+XSUC -1 -1.77 -0.62 0.22 0 -6.62 -10.13 -2.97 0.03 -0.32 -23.18 4.42
117 DL+EQP+BT+WL-XPR 0.47 0.56 0.49 0.33 0 6.2 13.51 7.45 -0.2 2.35 31.16 5.94
118 DL+EQP+BT+WL-XSUC -0.33 -0.65 0.17 0.28 0 4.48 10.55 6.29 -0.24 3.87 24.42 4.65
119 DL+EQP+BT+WL+ZPR -0.99 -1.71 -0.39 0.24 0 -1.94 -1.35 1.01 -0.11 2.2 -3.04 0.58
120 DL+EQP+BT+WL+ZSUC -0.18 -0.5 -0.1 0.29 0 -1.14 -0.1 1.4 -0.05 0.45 0.07 0.01
121 DL+EQP+BT+WL-ZPR -0.99 -1.68 -0.34 0.22 0 -1.28 -0.24 1.42 -0.06 2.02 -0.93 0.18
122 DL+EQP+BT+WL-ZSUC -0.18 -0.47 0.03 0.26 0 0.87 3.52 2.94 -0.03 0.6 7.54 1.44
123 DL+EQP+BT+SLX -0.07 -0.55 -1.11 0.17 0 -16.67 -28.96 -11.5 0.3 -4.1 -62.49 11.90
124 DL+EQP+BT+SLZ -0.01 -0.17 0.25 0.29 0 3.34 8.19 5.06 -0.13 1.25 18.07 3.44
125 DL+EQP+BT-SLX 0.02 0.07 1.14 0.37 0 16.69 32.97 16.1 -0.39 4.76 71.73 13.66
126 DL+EQP+BT-SLZ -0.03 -0.31 -0.21 0.25 0 -3.32 -4.18 -0.46 0.03 -0.6 -8.83 1.68
maxm. 13.66
TOTAL NO. OF PILES PROVIDED = 40
Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal TOTAL FX Rowwise
ROW B L/C
Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Mton pile reqt
101 DL+LL+EQP+BT*1.25 10 0.01 11 -0.02 40 0.94 201 8.14 138 11.81 141 7.78 144 5.3 147 0 198 0 33.96 8.09
102 DL+LL+EQP+BT+WL+XPR B8 -0.18 B7 -0.4 B6 0.83 B5 6.97 B4 4.49 B3 -3 B2 -0.1 B1 0.01 B1' 0.37 8.99 1.71
103 DL+LL+EQP+BT+WL+XSUC -1 -1.68 -1.78 6.4 4.65 -3.33 -0.33 0 0.25 3.18 0.61
104 DL+LL+EQP+BT+WL-XPR 0.51 0.84 2.92 6.97 13.49 13.74 7.82 -0.01 0.12 46.4 8.84
105 DL+LL+EQP+BT+WL-XSUC -0.31 -0.44 0.29 6.4 14.01 13.53 7.58 -0.02 0.75 41.79 7.96
106 DL+LL+EQP+BT+WL+ZPR -0.98 -1.54 -1.1 6.51 11.52 8.48 5.1 -0.01 0.75 28.73 5.47
107 DL+LL+EQP+BT+WL+ZSUC -0.16 -0.28 1.43 7.09 9.85 6.64 4.39 0 0.12 29.08 5.54
108 DL+LL+EQP+BT+WL-ZPR -0.99 -1.57 -2.15 5.94 8.28 2.77 2.54 -0.01 0.75 15.56 2.96
109 DL+LL+EQP+BT+WL-ZSUC -0.16 -0.27 0.14 6.28 8.07 3.66 3.11 0 0.12 20.95 3.99
110 DL+LL+EQP+BT+SLX -0.06 -0.45 -0.9 6.4 -2.12 -15.8 -6.19 0.01 0 -19.11 3.64
111 DL+LL+EQP+BT+SLZ 0.03 0.16 1.26 6.4 14.18 15.45 8.66 -0.01 0 46.13 8.79
112 DL+LL+EQP+BT-SLX 0.07 0.39 2.1 6.4 19.73 26.12 13.73 -0.01 0 68.53 13.05
113 DL+LL+EQP+BT-SLZ -0.02 -0.21 -0.06 6.4 3.43 -5.14 -1.11 0 0 3.29 0.63
115 DL+EQP+BT+WL+XPR -0.18 -0.44 0.99 6.97 4.33 -3.31 -0.26 0.01 0.37 8.48 1.62
116 DL+EQP+BT+WL+XSUC -1.01 -1.71 -1.62 6.4 4.5 -3.64 -0.49 0 0.25 2.68 0.51
117 DL+EQP+BT+WL-XPR 0.51 0.8 3.07 6.97 13.33 13.43 7.66 -0.01 0.12 45.88 8.74
118 DL+EQP+BT+WL-XSUC -0.32 -0.48 0.44 6.4 13.86 13.22 7.42 -0.02 0.75 41.27 7.86
119 DL+EQP+BT+WL+ZPR -0.99 -1.58 -0.95 6.51 11.36 8.17 4.94 -0.01 0.75 28.2 5.37
120 DL+EQP+BT+WL+ZSUC -0.17 -0.32 1.59 7.09 9.69 6.33 4.24 0 0.12 28.57 5.44
121 DL+EQP+BT+WL-ZPR -0.99 -1.6 -2 5.94 8.12 2.46 2.38 -0.01 0.75 15.05 2.87
122 DL+EQP+BT+WL-ZSUC -0.16 -0.31 0.3 6.28 7.92 3.35 2.95 0 0.12 20.45 3.90
123 DL+EQP+BT+SLX -0.06 -0.49 -0.74 6.4 -2.27 -16.11 -6.35 0.01 0 -19.61 3.74
124 DL+EQP+BT+SLZ 0.03 0.12 1.42 6.4 14.03 15.15 8.5 -0.01 0 45.64 8.69
125 DL+EQP+BT-SLX 0.06 0.35 2.26 6.4 19.58 25.81 13.58 -0.01 0 68.03 12.96
126 DL+EQP+BT-SLZ -0.03 -0.25 0.1 6.4 3.27 -5.44 -1.27 0 0 2.78 0.53
maxm. 13.05
TOTAL NO. OF PILES PROVIDED = 33
Horizontal Horizontal Horizontal Horizontal Horizontal TOTAL FX Rowwise
ROW B' L/C
Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Node Fx Mton Mton pile reqt
101 DL+LL+EQP+BT*1.25 114 -1.19 115 0 124 1.07 130 0.31 135 4.84 5.03 1.20
102 DL+LL+EQP+BT+WL+XPR B'6 -2.57 SC2 0 B'5 -1 SC5 -0.14 B'4 3.06 -0.65 0.12
103 DL+LL+EQP+BT+WL+XSUC -7.17 0 -0.57 0.24 5.53 -1.97 0.38
104 DL+LL+EQP+BT+WL-XPR 1.78 0 1.42 -0.14 5.32 8.38 1.60
105 DL+LL+EQP+BT+WL-XSUC -2.64 0 2.34 0.22 8.84 8.76 1.67
106 DL+LL+EQP+BT+WL+ZPR -9.42 -0.05 1.29 0.22 12.42 4.46 0.85
107 DL+LL+EQP+BT+WL+ZSUC -5.26 -0.05 -0.14 -0.15 7.62 2.02 0.38
108 DL+LL+EQP+BT+WL-ZPR -2.63 0.05 1.42 0.46 6.07 5.37 1.02
109 DL+LL+EQP+BT+WL-ZSUC 1.93 0.06 0.56 0.24 1.58 4.37 0.83
110 DL+LL+EQP+BT+SLX -2.37 0.02 -1.85 0.26 4.72 0.78 0.15
111 DL+LL+EQP+BT+SLZ -3.55 -0.04 2.73 0.27 5.31 4.72 0.90
112 DL+LL+EQP+BT-SLX -0.03 -0.01 3.66 0.23 3.45 7.3 1.39
113 DL+LL+EQP+BT-SLZ 1.15 0.05 -0.92 0.22 2.86 3.36 0.64
115 DL+EQP+BT+WL+XPR -1.84 0 -0.87 -0.13 2.2 -0.64 0.12
116 DL+EQP+BT+WL+XSUC -6.44 -0.01 -0.44 0.25 4.67 -1.97 0.38
117 DL+EQP+BT+WL-XPR 2.51 -0.01 1.55 -0.13 4.45 8.37 1.59
118 DL+EQP+BT+WL-XSUC -1.91 -0.01 2.47 0.23 7.97 8.75 1.67
119 DL+EQP+BT+WL+ZPR -8.69 -0.05 1.42 0.23 11.56 4.47 0.85
120 DL+EQP+BT+WL+ZSUC -4.53 -0.05 -0.01 -0.14 6.76 2.03 0.39
121 DL+EQP+BT+WL-ZPR -1.9 0.05 1.56 0.47 5.21 5.39 1.03
122 DL+EQP+BT+WL-ZSUC 2.66 0.06 0.7 0.25 0.71 4.38 0.83
123 DL+EQP+BT+SLX -1.64 0.01 -1.72 0.27 3.86 0.78 0.15
124 DL+EQP+BT+SLZ -2.82 -0.05 2.86 0.28 4.45 4.72 0.90
125 DL+EQP+BT-SLX 0.7 -0.02 3.79 0.24 2.58 7.29 1.39
126 DL+EQP+BT-SLZ 1.88 0.04 -0.79 0.23 2 3.36 0.64
maxm. 1.67
TOTAL NO. OF PILES PROVIDED = 16
Horizontal Horizontal TOTAL FX Rowwise
ROW A' L/C
Node Fx Mton Node Fx Mton Mton pile reqt
101 DL+LL+EQP+BT*1.25 156 0.03 159 0.27 0.3 0.07
102 DL+LL+EQP+BT+WL+XPR A'1 -0.09 A'1' -2.03 -2.12 0.40
103 DL+LL+EQP+BT+WL+XSUC 0.09 1.53 1.62 0.31
104 DL+LL+EQP+BT+WL-XPR 0.07 1.02 1.09 0.21
105 DL+LL+EQP+BT+WL-XSUC 0.26 4.6 4.86 0.93
106 DL+LL+EQP+BT+WL+ZPR 0.22 4.03 4.25 0.81
107 DL+LL+EQP+BT+WL+ZSUC 0.04 0.47 0.51 0.10
108 DL+LL+EQP+BT+WL-ZPR 0.27 4.92 5.19 0.99
109 DL+LL+EQP+BT+WL-ZSUC 0.09 1.38 1.47 0.28
110 DL+LL+EQP+BT+SLX -0.12 -2.04 -2.16 0.41
111 DL+LL+EQP+BT+SLZ 0.06 0.75 0.81 0.15
112 DL+LL+EQP+BT-SLX 0.18 2.51 2.69 0.51
113 DL+LL+EQP+BT-SLZ 0 -0.28 -0.28 0.05
115 DL+EQP+BT+WL+XPR -0.1 -2.1 -2.2 0.42
116 DL+EQP+BT+WL+XSUC 0.09 1.46 1.55 0.30
117 DL+EQP+BT+WL-XPR 0.06 0.95 1.01 0.19
118 DL+EQP+BT+WL-XSUC 0.25 4.53 4.78 0.91
119 DL+EQP+BT+WL+ZPR 0.22 3.96 4.18 0.80
120 DL+EQP+BT+WL+ZSUC 0.03 0.4 0.43 0.08
121 DL+EQP+BT+WL-ZPR 0.26 4.85 5.11 0.97
122 DL+EQP+BT+WL-ZSUC 0.08 1.31 1.39 0.26
123 DL+EQP+BT+SLX -0.13 -2.11 -2.24 0.43
124 DL+EQP+BT+SLZ 0.06 0.68 0.74 0.14
125 DL+EQP+BT-SLX 0.17 2.44 2.61 0.50
126 DL+EQP+BT-SLZ -0.01 -0.35 -0.36 0.07
maxm. 0.99
TOTAL NO. OF PILES PROVIDED = 8
ROWWISE PILE REQUIREMENT IN Z DIRECTION AGAINST HORIZONTAL LOADS