You are on page 1of 2

Standar Operasional Prosedur Dept.

CPP Hauling & Port


Section No Dokumen Judul
001 CPP Infrastructure Services
002 CPP Production Planning
003 Maintenance Planning
004 Periodical Service
005 Un - Schedule Breakdown
006 Pemindahan Equipment
007 Replace Pulley
008 Replace Gear Box
009 Replace Motor
010 Replace Bearing
011 Replace Roller
CPP
012 Splicing Belt
013 Replace Coupling
014 Pengeluaran Barang Stock Item
015 Penerimaan Barang, dan Production/Support/Transportation Equipment
016 Mengoperasikan Crusher
017 Membersihkan Area Instalasi Crusher
018 Membersihkan Material Crusher
019 Feeding Material Hopper
020 Dumping Area Hopper
021 Pelaksanaan Perawatan Harian (P2H) Unit
022 Melaksanakan Greasing

001 Get In / Get Out Jembatan Timbang


002 Coal Hauling ROM ke Intermediate Stockpile
003 Coal Hauling ROM ke Jetty
004 Hauling Production Planning
005 Loading Batubara di ROM
006 Loading Batubara di Intermediate Stockpile
007 Mengoperasikan Sarana di Area ROM
HAULING
008 Mengoperasikan Sarana di Area Intermediate Stockpile
009 Mengoperasikan Sarana di Area Jetty
010 Menangani Unit Amblas
011 Parkir Unit
012 Menangani Unit Insiden
013 Road Maintenance Planning
014 Pelaksanaan Perawatan Harian (P2H) Unit

001 Port Stockpile Management


002 Port Production Planning
PORT 003 Pelaksanaan Perawatan Harian (P2H) Unit
004 Loading Batubara di Jetty
005 Transhipment Planning
Equipment

You might also like