PLAN 1

Rute PIT KBU - ISP km10


no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. Bahtera 16-31 16 3 30 1440
2 PT. Hanvan 2 3 26 156
3 DI-GSM 1-5 5 4 26 520
4 PT. CBML 3 4 26 312
5 PT. Arung (trintin) 1-10 10 2 35 700
6 PT. Bahtera 1-15 15 1 30 450 Rit 2 & 3
ton ISP km10/hr 3,578

Rute PIT KBU - ISP km17 (TOP) / Port MB


no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. MB (trintin) 15 1 40 600 Rit pertama
2 PT. Bahtera 1-15 15 1 30 450 Rit pertama
ton ISP km17/hr 1,050

Rute ISP km10 - ISP km17 (TOP)/ Port MB


no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. MB (trintin) 15 2 40 1200 Rit 2 & 3
2 PT. SAM 8 2 40 640
ton ISP km17/hr 1,840

Grand Total 6,468 t/hr


PLAN 2
Rute PIT KBU - ISP km10
no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. Hanvan 2 3 26 156
2 DI-GSM 1-5 5 4 26 520
3 PT. CBML 3 4 26 312

ton ISP km10/hr 988

Rute ISP km10 - ISP km17 (TOP)/ Port MB


no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. SAM 8 2 40 640
ton ISP km17/hr 640

Rute PIT KBU - ISP km17 (TOP) / Port MB


no Kontraktor no DT Qty Rit/ hr Kapasitas DT Tonase Keterangan
1 PT. MB (trintin) 15 2 40 1200
2 PT. Bahtera 1-31 31 2 30 1860
3 PT. Arung (trintin) 1-12 20 2 35 1400
ton ISP km17/hr 4,460
Grand Total 6,088 t/hr
GENERAL MANAGER MANAGER SUPERINTENDENT
GM Operation PORT Manager Coal Processing Plant Dept.
1x

Mekanikal Dept.
1x

Elektrikal Dept.
1x

HE Dept.
1x

Warehouse Dept.
1x

HRGA Dept.
1x

Port Captain
1x
SUPERVISOR Operator/Crew
CPP spv Op. WB 3x
3x Op. Alat Berat (12x) (PT. KBU by PT. CBML & PT. BOSTON)

Planner vendor
1x 10x (by PT. MB)

Electrian Op. Genset 3x


1x Teknisi 2x

Planner mekanik & Helper


1x 4x (by RENTAL PT. CBML & PT. BOSTON)

Project spv Drafter & Pengawas


2x 2x (by PT. TNBS)

Quality Control Crew sampel


4x 2x

Warehouse spv storeman, fuelman, admin


1x 5x

HR spv & GA spv vendor


2x 10x

Loading Master vendor crew mooring


2x 5x/ shift (by PT. MB)