WELL DATA
WELL: TOTORO SUR-1 DATE: 8-Dec-21
COMPANY: PAREX RESOURCES CURRENT DEPTH: 10900.0 Ft PREV. DEPTH 10900.0 Ft
RIG: PIONEER 52 TVD: 10009.99 Ft PROGRESS 0.0 Ft
OPERATION @ 16:00 Hrs: POOH 5 1/2" DP + BHA No. 4( Triplecombo + MWD) at 8754 ft
HOURS REMARKS
TOH 5 1/2'' DP + BHA No.4 (Triplecombo + MWD) from 9968 ft to 8661 ft.
Remarks:
- Observed TOH from TD, 75% stand out with over torque. Used power tong at some connections.
- Monitored Pipe displacement through Trip Tank, stable levels.
Continued TOH 5 1/2'' DP + BHA No.4 (Triplecombo + MWD) with Back reaming from 8661 ft to 8315 ft. (C2 Fm) Parameters: Q: 600 - 650 gpm, SPP: 2800 -
3350 psi, RPM btm: 198 -219 rev/min (RPM surf: 60 - 70 rev/min, RPM motor: 138 -149 rev/min), TQ: 14 - 34 klbf-ft.
At 8315 ft circulated bottom up and reciprocated string pipe from 10798 ft 10900 with Parameters: Q: 650 gpm, SPP: 3400 - 3500 psi, RPM btm: 209 rev/min
05:00 - 06:00 (RPM surf: 60 rev/min, RPM motor: 149 rev/min), TQ: 12 - 22 klbf-ft.
TIH 5 1/2" DP + BHA No. 4 ( Triplecombo + MWD) from 8381 ft to 10900 ft as follows:
Pumped and displaced out 60 bbl Vis pill (MW: 9.2 ppg - FV: sec/qt) with tracer material 4 ppb wall nut , Circulated to clean hole reciprocating string from 10900 ft
10809 with parameters: Q: 500 gpm, SPP 2400 psi., RPM btm: 156-186 rev/min (RPM surf: 40 - 70 rev/min, RPM motor: 116 rev/min), TQ: 25-33 klbf-ft.
Remarks:
10:00- 11:30 - Avg. Open Hole Diameter according to volumetric test: 10.7" 12596 STK (Theoretical for 8 3/4" Hole Section: 8440 STK).
Took String weights as follow:
- With pump: P/U:400 klb, S/O: 250 klb, ROT: 250 klb.
- Add lubricant at 3% V / V (1% EZE SLIDE + 2% QLUBE)
POOH 5 1/2" DP + BHA No. 400 ( Triplecombo + MWD) from 10900 ft to 10247 ft as follows:
- On elevators 10809 ft to 10300 ft
11:30 -12:30
-Monitored displacement through Trip tank.
At 10247 ft ( Mirador formation Top at 10253 ft) Circulated bottom up, reciprocating string ( 10292 ft to 10247 ft) with, Q: 550 gpm, P: 2650 psi, RPM btm: 164
rev/min (RPM surf: 35 rev/min, RPM motor: 128rev/min), TQ: 15-18 klf-ft.
Remarks:
12:30-14:00
- Took String weights as follow:
- With pump: P/U: 350 klb, S/O: 240 klb, ROT: 290 klb.
- At 10245 ft, performed flow check for 15 min, Well Static. OK.
- Caving: 0.7 bph; Shape: 70% Blky, 10% Splntd, 20% Lumps, Litho: Clst/Sh; Size: (5 - 8 mm, Avg: 6.5 mm).
Continued POOH 5 1/2" DP + BHA No. 400 ( Triplecombo + MWD) from 10247 ft to 8754 ft as follows:
On elevators from 10247 ft to 8754 ft
14:00-16:00
Remarks:
-Monitored displacement through Trip tank.
TOPS MEASURED
FT SND SST SLTST CARB SLTST LMST CLST COAL SHALE CGL SND SBLITH CGLSND
WOB klbs 15.00 Drilled ahead 8 3/4" HS w/ BHA No.4 (Directional) rotating
RPM motor rev/min 196.00 Drilled ahead 8 3/4" HS w/ BHA No.4 (Directional) Sliding
RPM Surf rev/min 70.00
TQ klbf-ft 30.00
SPP psi 2600.00
Q gpm 490.00 Drilled ahead 8 3/4" HS w/ BHA No.4
Formation
with parameters